Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML030160057 | 31 December 2002 | Amendment 31 to Duke Energy Topical Report Quality Assurance Program | Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Condition Adverse to Quality Process Control Program License Renewal Commercial Grade Fire Protection Program |
ML030080093 | 31 December 2002 | Blue Ridge Environmental Defense League'S and Nuclear Information and Resource Service'S Motion for an Extension of Time to Respond to Duke Energy Corporation'S Motion to Dismiss Contention 2 | |
ML030150118 | 30 December 2002 | Response to NRC Questions for Proposed Technical Specification Amendment for Nuclear Service Water System Pipe Replacement | |
ML030020435 | 27 December 2002 | Mcguire/Catawba - Letter Transmitting Copies of the Final Supplements to NUREG-1437 to ASLBP | |
ML023600060 | 24 December 2002 | Final Supplement 9 to the Generic Environmental Impact Statement Regarding Catawba Nuclear Power Station, Units 1 and 2 | License Renewal |
ML023650623 | 23 December 2002 | Motion to Dismiss Consolidated Contention 2 | Probabilistic Risk Assessment License Renewal |
ML050670151 | 23 December 2002 | Catawba Hearing - Staff Exhibit 5 (SEC-21), Physical Protection Program Manual | |
ML023610141 | 18 December 2002 | Duke Energy Corporation, Nuclear Quality Assurance Program Amendment 32 | Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Condition Adverse to Quality Process Control Program License Renewal Commercial Grade Fire Protection Program |
ML023520616 | 18 December 2002 | Acceptance for Referencing of the Modified Licensing Topical Report, DPC-NE-2009P, Revision 2 | Anticipated operational occurrence |
ML023530289 | 18 December 2002 | M021217-Affirmation Session: I. SECY-02-0117 (Savannah River); Ii. SECY-02-0118 (Private Fuel Storage); Iii. SECY-02-0119 (McGuire; Catawba); Iv. SECY-02-0120 (Millstone); V. SECY-02-0157 (Mcguire); Vi. SECY-02-0207 (Private Fuel Storage IS | |
ML023520517 | 18 December 2002 | Commission Memorandum and Order (CLI-02-28) | Probabilistic Risk Assessment License Renewal |
ML023520370 | 18 December 2002 | Commission Memorandum and Order (CLI-02-26) | Aging Management License Renewal |
ML023520246 | 18 December 2002 | SRM-M021218A- Affirmation: I. SECY-02-0117 (Savannah River); Ii. SECY-02-0118 (Private Fuel Storage); Iii. SECY-02-0119 (McGuire; Catawba); Iv. SECY-02-0120 (Millstone); V. SECY-02-0157 (Mcguire); Vi. SECY-02-0207 (Private Fuel Storage ISFS | |
ML023540056 | 16 December 2002 | Transcript of Telephone Conference Held on 12/16/02; Pp. 1168 - 1181 | |
ML023600497 | 16 December 2002 | Amendment 31 to the Duke Energy Corp., Topical Report, Duke-1-A, Quality Assurance Program | Fitness for Duty Non-Destructive Examination Offsite Dose Calculation Manual Coatings Nondestructive Examination Condition Adverse to Quality Process Control Program License Renewal Commercial Grade Fire Protection Program |
ML023540473 | 13 December 2002 | November 2002 Monthly Operating Report for Catawba Nuclear Station, Units 1 & 2 | |
ML023500485 | 12 December 2002 | Mcguire/Catawba - 12/12/2002 - Letter to Administrative Judges and Updated Case File | Aging Management License Renewal |
ML023400468 | 5 December 2002 | Reactor & Senior Reactor Operator Initial Examinations, Catawba Nuclear Station - 50-413/2003-301& 50-414/2003-301 on March 31 & April 14, 2003 | |
ML023370596 | 4 December 2002 | Saluda River Assigned Collateral for Decommissioning Funds | |
TAC:MA9985 | 4 December 2002 | ||
ML023450559 | 4 December 2002 | February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing Exam | Generic Fundamentals Examination |
ML023470328 | 3 December 2002 | Request for Exemption Pursuant to 10 CFR 50.12 Exemption to Cladding Material Specified in 10 CFR 50.44, 10 CFR 50.46 & 10 CFR 50 Appendix K | Exemption Request Fuel cladding Affidavit |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023470290 | 26 November 2002 | Duke Energy Corporation Service List - Names & Addresses | |
ML023380522 | 25 November 2002 | Reply to Request for Additional Information Concerning Relief Number 01-003 | |
TAC:MB3923 | 25 November 2002 | ||
TAC:MB5881 | 22 November 2002 | ||
ML023290516 | 22 November 2002 | Summary of 10/31/2002 Meeting with Rg&E (Ginna), Duke Energy (Catawaba, Mcguire), Entergy (Indian Point), Progress Energy (Harris), Proposed Plan to Perform Fire Testing of Hemyc (1-Hour) & MT (3-Hour) Fire Protection Wrap | Hemyc |
ML023260352 | 22 November 2002 | Response to NRC Bulletin 2002-02 Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs | Nondestructive Examination |
ML023240313 | 22 November 2002 | Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan. | Fire Barrier Hemyc |
ML023380276 | 21 November 2002 | Steam Generator Outage Summary Report for End of Cycle 11 Refueling Outage Response to NRC Request for Additional Information | |
ML023440159 | 21 November 2002 | Supplemental Response to NRC Letter Dated November 13, 2002 Application to Renew the Licenses of McGuire & Catawba Units 1 & 2 | Post Accident Monitoring Aging Management Stress corrosion cracking License Renewal Affidavit |
ML023290184 | 20 November 2002 | Slides for 11/4/2002 Lrsc Meeting | Aging Management |
ML023380134 | 20 November 2002 | License Amendment Request Applicable to Catawba Technical Specification 3.3.2 & Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation; & Technical Specification 3.3.5, Loss of Power Diesel Generator Start Instrumentation | Safe Shutdown Probabilistic Risk Assessment Fuel cladding Grace period |
ML023330372 | 19 November 2002 | Proposed Revision to Page 3-1 of Topical Report DPC-NF-2010, Nuclear Physics Methodology for Reload Design | |
ML023230327 | 19 November 2002 | Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response Request for Additional Information | Boric Acid VT-2 Stress corrosion cracking Pressure Boundary Leakage |
ML023300288 | 18 November 2002 | Units 1 & 2, Response to NRC Ltr. Dtd. 11/13/2002, Application to Renew the Licenses | Safe Shutdown Fire Barrier Emergency Lighting Aging Management License Renewal Fire Protection Program Affidavit |
ML023220050 | 18 November 2002 | Project Manager Reassignment | |
ML023250200 | 14 November 2002 | October 2002 Monthly Operating Report for Catawba Units 1 & 2 | |
ML023300321 | 14 November 2002 | Response to NRC Letter Dated November 13, 2002 Application to Renew the Licenses of McGuire Units 1 & 2 and Catawba Units 1 & 2 | Aging Management License Renewal Affidavit Thermal fatigue |
ML023190479 | 13 November 2002 | Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter) | Safe Shutdown License Renewal Exemption Request Fire Protection Program Backfit |
L-84-001, Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter) | 13 November 2002 | Proposed Staff Guidance on the Scoping of Fire Protection Equipment for License Renewal (Cover Letter) | Safe Shutdown License Renewal Exemption Request Fire Protection Program Backfit |
ML023330411 | 12 November 2002 | Proposed Technical Specifications (TS) Amendments Technical Specification 5.5.2 (Containment Leakage Rate Testing Program) One-Time Extension of Integrated Leak Rate Testing (ILRT) Interval - Partial Response to RAI | Internal Flooding Probabilistic Risk Assessment |
ML023330443 | 12 November 2002 | Response to Request for Additional Information Topical Report DPC-NE-1005P, Revision 0, Nuclear Design Methodology Using CASMO-4/SIMULATE-3 MOX | Affidavit |
ML023120274 | 8 November 2002 | Catawa and McGuire Nuclear Stations, Units 1 and 2, Duke Energy Corporation, Request for Withholding Information from Public Disclosure | Affidavit |
ML023120377 | 8 November 2002 | Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head & Vessel Head Penetration Nozzle Inspection Programs. | Nondestructive Examination |
TAC:MB5882 | 8 November 2002 | ||
ML023120399 | 8 November 2002 | LB Order (Confirming Matters Addressed at November 6, 2002, Conference) | |
ML033070189 | 7 November 2002 | IA-02-042, Kirby |