Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18262A41527 September 2018Staff Review of Mitigating Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7893; EPID No. L-2016-JLD-0006)Safe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
ML18249A40726 September 2018Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9920, MF9452, MF9451, MF9425, MF9406-MF9408; EPID L-2016-LRC-0001)Aging Management
ML18302A13025 September 2018FEMA - Submittal of Final After Action Report for August 15, 2018, Medical Services Drill of the Offsite Radiological Emergency Response Plans to Wolf Creek
ML18302A13124 September 2018FEMA - Wolf Creek After Action Report/Improvement Plan Drill Date - August 15, 2018, Radiological Emergency Preparedness (REP) Program
ML19092A15618 September 2018EQSD-I, Rev 14
ML18268A13618 September 2018Revision of Four Procedures and Four Forms That Implement the Radiological Emergency Response Plan
ML18268A13718 September 2018Summary of Changes to Four Procedures and Four Forms That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP)
ML18255A0634 September 2018Correction to Wolf Creek Submittal of Anchor Darling Double Disc Gate Valve Information and StatusAnchor Darling
IR 05000482/201800531 August 2018Updated Inspection Plan for Wolf Creek Generating Station, Unit 1, (Inspection Report 05000482/2018005)Cyber Security
Open Phase Condition
ML19092A12522 August 2018Fire Protection Evaluations for Unique and Unbounded Fire Barrier Configurations - M-663-00017A W08 CS to B1-98Safe Shutdown
Fire Barrier
Coatings
Fire Protection Program
WO 18-0036, Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection15 August 2018Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection
ML18234A13114 August 2018Lnservice Inspection Program Fourth Interval, First Period, Refueling Outage 22 Owner'S Activity Report
ML18234A13214 August 2018Submittal of Containment Inservice Inspection Program Second Interval, Third Period, Refueling Outage 22 Owner'S Activity Report
IR 05000482/201800212 August 2018NRC Integrated Inspection Report 05000482/2018002 and Assessment Follow-Up LetterBoric Acid
High Radiation Area
Grab sample
Internal Flooding
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
Spent Fuel Pool Instrumentation
Fuel cladding
Fire Protection Program
Fire Watch
Scaffolding
ML18228A5429 August 20182 to the Wolf Creek Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term9 August 2018Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term
IR 05000482/20180078 August 2018NRC Problem Identification and Resolution Inspection Report 05000482/2018007Temporary Modification
Functionality Assessment
Condition Adverse to Quality
FLEX
Significance Determination Process
Operability Determination
ML18208A69427 July 2018NRR E-mail Capture - Wolf Creek Relief Request for Repairing Essential Service Water Leak - Acceptance Review
ML18207A43626 July 2018NRR E-mail Capture - Wolf Creek Verbal Relief Request - Relief from American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Code Case N-666-1 for Alternate Repair of Essential Service Water PipingWeld Overlay
ML18208A09426 July 2018NRR E-mail Capture - Wolf Creek Relief Request for Repairing Essential Service Water Leak - Acceptance Review
WM 18-0040, Transmittal of Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel25 July 2018Transmittal of Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel
ML18207A43324 July 2018NRR E-mail Capture - (External_Sender) Draft Request for Additional Information Relief Request from ASME Code N-666-1 Alternate Repair of Essential Service Water Piping Wolf Creek Generating Station, Unit 1 EPID No.:L-2018-LLR-0101Weld Overlay
WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 123 July 2018Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1Weld Overlay
ML18183A58323 July 2018Request for Withholding Information from Public Disclosure - 6/18/18 Affidavit Executed by Edmond J. Mercier, Westinghouse Electric Company Adoption of AST Amendment Request(Cac No. MF9307; EPID L-2017-LLA-0211)
ML18136A50112 July 2018Letter Wolf Creek Nuclear Operating Corporation - Apparent Violation of Employee Protection Requirements (Office of Investigations Report No. 4-2017-020) (EA-18-037)
WM 18-0039, Schedule for the Wolf Creek Nuclear Operating Corporation (WCNOC) Re-Analysis of the LBLOCA and SBLOCA Using the Full Spectrum LOCA (Fsloca) Methodology and the Performance and Analysis Design (PADS) Model, Amendment 213 License Condition3 July 2018Schedule for the Wolf Creek Nuclear Operating Corporation (WCNOC) Re-Analysis of the LBLOCA and SBLOCA Using the Full Spectrum LOCA (Fsloca) Methodology and the Performance and Analysis Design (PADS) Model, Amendment 213 License Condition t