ML16271A092 | 28 September 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016 | Safe Shutdown Safety Limit Minimum Critical Power Ratio Exemption Request Fuel cladding |
ML16241A000 | 23 September 2016 | Mitigating Strategies and Spent Fuel Pool Instrumentation Safety Evaluation | Boric Acid High winds Shutdown Margin Loop seal Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Tornado Missile Protection Design basis earthquake Spent Fuel Pool Instrumentation Frazil ice B.5.b Mitigating Strategies Earthquake Fire Protection Program Coast down |
ML16263A335 | 23 September 2016 | NextEra Fleet Submittals - Project Manager Assignment | |
NRC 2016-0044, Spring 2016 U1R36 180-Day Steam Generator Tube Inspection Report | 20 September 2016 | Spring 2016 U1R36 180-Day Steam Generator Tube Inspection Report | Nondestructive Examination |
CAC:MF8401 | 20 September 2016 | | |
ML16257A517 | 19 September 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 | Safe Shutdown Safety Limit Minimum Critical Power Ratio Exemption Request Fuel cladding Fire Protection Program |
NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 | 19 September 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 | Safe Shutdown Safety Limit Minimum Critical Power Ratio Exemption Request Fuel cladding Fire Protection Program |
ML16258A107 | 14 September 2016 | NRR E-mail Capture - LIC-109 Acceptance of Point Beach Nuclear Plant, Unit 1 - LAR for H*: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region - MF8218 | |
IR 05000266/2016406 | 13 September 2016 | NRC Material Control and Accounting Program Inspection Report 05000266/2016406; 05000301/2016406 | Affidavit |
ML16196A093 | 8 September 2016 | Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48 (C) | Hot Short Safe Shutdown Boric Acid High winds Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Coatings Cyber Security Multiple Spurious Operation Emergency Lighting B.5.b Large early release frequency Safeguards Contingency Plan Hemyc Cable Tray Ignition Exemption Request Fuel cladding Fire Protection Program |
CAC:MF8195 | 2 September 2016 | | |
ML16250A058 | 2 September 2016 | NRR E-mail Capture - Nrc'S LIC-109 Acceptance Review Results for NextEra Fleet TSTF-545 Amendment Request (CACs MF8202-MF8209) and Relief Request (CACs MF8195-MF8201) | |
ML16251A098 | 2 September 2016 | Part 21 - Potential Failure of Battery System Connections | |
ML16251A161 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion | Safe Shutdown Earthquake Internal Flooding Zebra Mussel Surveillance Frequency Control Program Design basis earthquake Earthquake Power Uprate |
ML16251A153 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 3 - Design Basis | Boric Acid Shutdown Margin Nondestructive Examination Finite Element Analysis Earthquake Fuel cladding Power change Flow Induced Vibration |
ML16251A154 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis | Safe Shutdown Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination License Renewal Earthquake Liquid penetrant Power change Power Uprate |
ML16251A158 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems | Safe Shutdown Boric Acid Shutdown Margin Loop seal Tornado Missile Hydrostatic Zebra Mussel Incorporated by reference Surveillance Frequency Control Program Design basis earthquake License Renewal Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Fire Protection Program Power change GOTHIC Power Uprate |
ML16251A149 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages | Safe Shutdown Internal Flooding Nondestructive Examination Surveillance Frequency Control Program Earthquake |
ML16251A157 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems | Safe Shutdown Stroke time Emergency Lighting Surveillance Frequency Control Program Battery sizing Earthquake |
ML16251A150 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary | Safe Shutdown Boric Acid High winds Shutdown Margin Tornado Missile Coatings Emergency Lighting Aging Management Tornado Missile Protection Earthquake Turbine Missile Fuel cladding Power change |
ML16251A162 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 11 - Waste Disposal Systems and Radiation Protection | High Radiation Area Grab sample Offsite Dose Calculation Manual Locked High Radiation Area Fuel cladding Mururoa Power Uprate |
ML16251A167 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 15 - Aging Management Programs and Time Limited Aging Analysis | Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Incorporated by reference Aging Management Pressure and Temperature Limits Report Moisture barrier License Renewal Biofouling Fire Protection Program Dissimilar Metal Weld Power Uprate |
ML16251A165 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 13 - Site Surveillance and Testing Programs (Historical) | Boric Acid Hydrostatic |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 13 - Site Surveillance and Testing Programs (Historical) | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 13 - Site Surveillance and Testing Programs (Historical) | Boric Acid Hydrostatic |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 1 - Introduction and Summary | Safe Shutdown Boric Acid High winds Shutdown Margin Tornado Missile Coatings Emergency Lighting Aging Management Tornado Missile Protection Earthquake Turbine Missile Fuel cladding Power change |
ML16251A155 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 6 - Engineered Safety Features | Boric Acid Stroke time Safe Shutdown Earthquake Hydrostatic Coatings Operability Determination Time Critical Operator Action Liquid penetrant Power Uprate |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), List of Effective Pages | Safe Shutdown Internal Flooding Nondestructive Examination Surveillance Frequency Control Program Earthquake |
ML16251A168 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a | Safe Shutdown Boric Acid High winds Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Earthquake Control of Heavy Loads Through-Wall Leakage GOTHIC Power Uprate |
ML16251A173 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Appendix I | Boric Acid Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Fuel cladding |
ML16251A156 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Fire Barrier Post Accident Monitoring Emergency Lighting Operability Determination Earthquake Power change Power Uprate Measurement Uncertainty Recapture |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 7 - Instrumentation and Control | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Fire Barrier Post Accident Monitoring Emergency Lighting Operability Determination Earthquake Power change Power Uprate Measurement Uncertainty Recapture |
ML16251A152 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 2 - Site and Environment | High winds Zebra Mussel Earthquake |
ML16251A148 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 5 - Containment System Structure | Safe Shutdown Boric Acid Shutdown Margin Safe Shutdown Earthquake Hydrostatic Coatings Finite Element Analysis Earthquake Liquid penetrant |
ML16251A166 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis | Safe Shutdown Boric Acid Shutdown Margin Loop seal Ultimate heat sink Anticipated operational occurrence Aging Management Earthquake Control of Heavy Loads Deep Dose Equivalent Turbine Missile Fuel cladding Coast down |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix B | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix B | Safe Shutdown Boric Acid Earthquake |
ML16251A171 | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Appendix D | Safe Shutdown Earthquake Earthquake |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix a | Safe Shutdown Boric Acid High winds Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Earthquake Control of Heavy Loads Through-Wall Leakage GOTHIC Power Uprate |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix C | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix C | |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix I | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix I | Boric Acid Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Fuel cladding |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 15 - Aging Management Programs and Time Limited Aging Analysis | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 15 - Aging Management Programs and Time Limited Aging Analysis | Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Incorporated by reference Aging Management Pressure and Temperature Limits Report Moisture barrier License Renewal Biofouling Fire Protection Program Dissimilar Metal Weld Power Uprate |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 14 - Safety Analysis | Safe Shutdown Boric Acid Shutdown Margin Loop seal Ultimate heat sink Anticipated operational occurrence Aging Management Earthquake Control of Heavy Loads Deep Dose Equivalent Turbine Missile Fuel cladding Coast down |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 3 - Design Basis | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 3 - Design Basis | Boric Acid Shutdown Margin Nondestructive Examination Finite Element Analysis Earthquake Fuel cladding Power change Flow Induced Vibration |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 4 - Reactor Coolant System - Design Basis | Safe Shutdown Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination License Renewal Earthquake Liquid penetrant Power change Power Uprate |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 2 - Site and Environment | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 2 - Site and Environment | High winds Zebra Mussel Earthquake |
NRC 2016-0034, Periodic Update of the Final Safety Analysis Report (Fsar), Appendix T | 1 September 2016 | Periodic Update of the Final Safety Analysis Report (Fsar), Appendix T | Incorporated by reference |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 12 - Conduct of Operations | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 12 - Conduct of Operations | Incorporated by reference |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 8 - Introduction to the Electrical Distribution Systems | Safe Shutdown Stroke time Emergency Lighting Surveillance Frequency Control Program Battery sizing Earthquake |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 10 - Steam and Power Conversion | Safe Shutdown Earthquake Internal Flooding Zebra Mussel Surveillance Frequency Control Program Design basis earthquake Earthquake Power Uprate |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 11 - Waste Disposal Systems and Radiation Protection | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 11 - Waste Disposal Systems and Radiation Protection | High Radiation Area Grab sample Offsite Dose Calculation Manual Locked High Radiation Area Fuel cladding Mururoa Power Uprate |
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems | 1 September 2016 | Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 9 - Auxiliary and Emergency Systems | Safe Shutdown Boric Acid Shutdown Margin Loop seal Tornado Missile Hydrostatic Zebra Mussel Incorporated by reference Surveillance Frequency Control Program Design basis earthquake License Renewal Earthquake Control of Heavy Loads Turbine Missile Fuel cladding Fire Protection Program Power change GOTHIC Power Uprate |