ML10277003530 September 2010Confirmation of Requested Initial Operator License Examinations - Turkey Point
ML10271060328 September 2010Forthcoming Meeting Notice with Florida Power & Light to Discuss Alternative Source Term License Amendment Request That Is Currently Under Review for Turkey Point
ML10287030221 September 2010Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 1, Introduction and Summary
L-2010-212, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 1, Introduction and Summary21 September 2010Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 1, Introduction and Summary
ML10287030721 September 2010Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 5, StructuresSafe Shutdown
Boric Acid
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Finite Element Analysis
Tornado-Generated Missile
Tornado Missile Protection
Design basis earthquake
License Renewal
Earthquake
Control of Heavy Loads
Turbine Missile
Liquid penetrant
Power Uprate
L-2010-212, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 5, Structures21 September 2010Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 5, StructuresSafe Shutdown
Boric Acid
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Finite Element Analysis
Tornado-Generated Missile
Tornado Missile Protection
Design basis earthquake
License Renewal
Earthquake
Control of Heavy Loads
Turbine Missile
Liquid penetrant
Power Uprate
L-2010-212, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 2, Site and Environment21 September 2010Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update, Chapter 2, Site and Environment
L-2010-212, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update - Resubmission21 September 2010Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update - Resubmission
ML10238023921 September 2010Summary of Meeting with Florida Power & Light, on Turkey Point'S Proposed Extended Power Uprate Application (TAC Nos. ME1167 and ME1168)
ML10287029321 September 2010Updated Final Safety Analysis Report - Unit 4 Cycle 24 Update - Resubmission
L-2010-214, Response to Request for Additional Information on License Amendment Request No. 20221 September 2010Response to Request for Additional Information on License Amendment Request No. 202Safe Shutdown
Boric Acid
High winds
High Radiation Area
Fire Barrier
Tornado Missile
Commercial Grade Dedication
Internal Flooding
Coatings
Emergency Lighting
Locked High Radiation Area
Tornado-Generated Missile
Aging Management
Design basis earthquake
Overtravel
License Renewal
Earthquake
Control of Heavy Loads
Fire Protection Program
L-2010-211, Supplemental Responses to Letter L-2009-063 NRC Request for Additional Information Regarding GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.20 September 2010Supplemental Responses to Letter L-2009-063 NRC Request for Additional Information Regarding GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
L-2010-205, Responses to Nrc'S Request for Additional Information Dated Feb. 18, 2010 Re Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors17 September 2010Responses to Nrc'S Request for Additional Information Dated Feb. 18, 2010 Re Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
ML10264011416 September 2010NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4Operator Manual Action
Emergency Lighting
Fire Protection Program
L-2010-197, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System15 September 2010Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation SystemSafe Shutdown Earthquake
Earthquake
ML10264067912 September 2010G20100574/LTR-10-0422/EDATS: SECY-2010-0455 - Petition Under 10 CFR 2.206 Seeking Enforcement Action Against NextEra Energy, Florida Power & Light Company & Turkey Point Nuclear PlantFitness for Duty
ML1025601367 September 2010Notice of Meeting with Florida Power & Light Company to Discuss the Florida Power & Light Company'S Forthcoming Applications for the Extended Power Uprates of St. Lucie Units 1 & 2 and Turkey Point Units 3 & 4, Focusing on the Topic of Spen
ML1024604887 September 2010Notice of Meeting with Florida Power & Light Company to Discuss the Florida Power & Light Company'S Forthcoming Applications for the Extended Power Uprates of St. Lucie Units 1 & 2 and Turkey Point Units 3 & 4, Focusing on the Topic of Spen
ML1024602053 September 2010E-mail Acceptance Review TSTF-448
Press Release-10-154, National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk Study3 September 2010Press Release-10-154: National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk StudyEnvironmental Justice
L-2010-161, Response to Request for Additional Information on Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue2 September 2010Response to Request for Additional Information on Exemption from Certain Requirements of the Fitness for Duty Rule for Managing FatigueSafe Shutdown
Boric Acid
Fitness for Duty
High winds
Fire Barrier
Tornado Missile
Fire impairment
B.5.b Mitigating Strategies
Exemption Request
Earthquake
Minimum staff
Fire Watch
L-2010-136, Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 1962 September 2010Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 196
ML1024408161 September 2010Report 22 - 2010 Mid-Cycle, Inspection/Activity Plan 09/01/2010 - 12/31/2011
ML1024408111 September 2010Mid-Cycle Performance Review and Inspection Plan 2010
L-2010-299, License Amendment Request for Extended Power Uprate, Attachment 12; WCAP-17070-NP, Revision 0, Westinghouse Setpoint Methodology for Protection Systems31 August 2010License Amendment Request for Extended Power Uprate, Attachment 12; WCAP-17070-NP, Revision 0, Westinghouse Setpoint Methodology for Protection Systems
ML10244006827 August 2010Acceptance Review: Fuel Storage Criticality Analysis LAR (ME4470 and ME4471)
ML10238046826 August 201008/18/10 Summary of Meeting NRC Initial Exam Writer'S WorkshopJob Performance Measure
ML10236022225 August 2010Withdrawal of an Amendment RequestCyber Security
ML10244018525 August 2010Draft RAIs Re AST LAR
ML10228021524 August 2010Request for Additional Information Regarding Technical Specification Changes for Heavy Loads Over the Spent Fuel Pools (TAC Nos. ME3379 & ME3380)
ML10235000320 August 2010Email from Biscayne Bay Regional Restoration Coordination Team Forwarding from Sfwmd Data Collected by FPL for Uprate of Units 3 & 4
ML10231054618 August 2010Notification of Inspection and Request for InformationHigh Radiation Area
Offsite Dose Calculation Manual
Annual Radiological Effluent Release Report
ML10235023218 August 2010Extended Power Uprate (EPU) NRC Public Meeting
ML10225032516 August 2010Forthcoming Meeting with Florida Power & Light Co., to Discuss Results of Nrc'S Acceptance Review of St. Lucie Extended Power Uprate Application and Fpl'S Path Forward for Resubmitting Application and Its EPU Application for Turkey Point
ML10231059716 August 2010Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
ML10230003714 August 2010Comment (5) of Debra Guendelsberger, on Turkey Point ExpansionChernobyl
ML10225048813 August 2010Letter from Annette L. Vietti-Cook to Mr. Thomas Saporito Director'S Decision DD-10-01
L-2010-113, License Amendment Request for Extended Power Uprate, Attachment 13; Westinghouse Affidavit for Attachment 1211 August 2010License Amendment Request for Extended Power Uprate, Attachment 13; Westinghouse Affidavit for Attachment 12
L-2010-169, Turkey Point, Units 3 and 4 - Fuel Storage Criticality Analysis5 August 2010Turkey Point, Units 3 and 4 - Fuel Storage Criticality Analysis
L-2010-173, BADGER Test Results - License Condition 3.H(b)5 August 2010BADGER Test Results - License Condition 3.H(b)
L-2010-173, Turkey Point, Unit 4, BADGER Test Results - License Condition 3.H(b)5 August 2010Turkey Point, Unit 4, BADGER Test Results - License Condition 3.H(b)
TAC:MF06025 August 2010
ML1022200225 August 2010Fuel Storage Criticality Analysis
ML1023500052 August 2010Attachment to 8/20/10 Email from Bbrrct - Data Provided by Sfwmd That Was Collected by FPL for Uprate of Units 3 & 4
L-2010-169, WCAP-17094-NP, Revision 2, Turkey Point, Units 3 and 4, New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 231 July 2010WCAP-17094-NP, Revision 2, Turkey Point, Units 3 and 4, New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2Fuel cladding
ML10356018631 July 2010License Amendment Request for Extended Power Uprate, Attachment 10; WCAP-17094-NP, Revision 2, New Fuel Storage Rack and Spent Fuel Pool Criticality AnalysisFuel cladding
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 10; WCAP-17094-NP, Revision 2, New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis31 July 2010Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 10; WCAP-17094-NP, Revision 2, New Fuel Storage Rack and Spent Fuel Pool Criticality AnalysisFuel cladding
ML10074071828 July 2010February 3, 2010, Turkey Point, Unit 3 & 4, Summary of Meeting with Florida Power & Light, on Generic Letter 2004-02
IR 05000250/201000328 July 2010IR 05000250-10-003, 05000251-10-003 on 4/1/2010 - 6/30/2010 for Turkey Point Nuclear Power Plant, Units 3 and 4, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation, Followup of EventsSafe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Internal Flooding
Fire impairment
Temporary Modification
Significance Determination Process
Unidentified leakage
L-2010-165, NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations27 July 2010NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination