UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 1, 2010 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - TURKEY POINT NUCLEAR PLANT

Dear Mr. Nazar:

On August 11, 2010, the NRC staff completed its performance review of the Turkey Point Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for Turkey Point Unit 3 for the most recent quarter of the assessment period was within the Regulatory Response Column of the NRCs Action Matrix, based on one White Initiating Events finding issued in the fourth quarter of 2009. The White finding addressed a condition of degraded neutron absorber material in the spent fuel pool storage racks. On February 19, 2010, the staff issued a Confirmatory Action Letter (CAL) to confirm your commitments to address the degraded condition, and on June 21, 2010, the staff also issued a Severity Level III Notice of Violation in accordance with the NRC=s Enforcement Policy. Your staff has informed us of your readiness for the NRC to conduct a supplemental inspection and review your corrective actions for this issue. Therefore, we plan to conduct a supplemental inspection using Inspection Procedures 95001, Inspection For One Or Two White Inputs In A Strategic Performance Area, and 92702, Follow-up on Corrective Actions for Violations and Deviations, beginning November 29, 2010.

Plant performance for Turkey Point Unit 4 for the assessment period was within the Licensee Response Column of the NRCs Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).

FPL 2 The enclosed inspection plan details the inspections, less those related to security, scheduled through December 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of cycle review. We also plan on conducting several infrequently performed inspections which include: Initial Reactor Operating License Examinations; Temporary Instruction (TI) 2515/177, Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal &

Containment Spray Systems; and TI-2515/179, Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in the National Source Tracking System; and Independent Spent Fuel Storage Installation (ISFSI) inspection.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Daniel Rich at (404) 997-4721 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA by Joel Munday Acting For/

Leonard D. Wert, Director Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Turkey Point Nuclear Plant Inspection/Activity Plan (09/01/10 - 12/31/11)

__PKG: ML102440809__ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE SON JSS1 by email DWR1 JMunday for NAME SNinh SStewart DRich LWert DATE 08/31/2010 0830/2010 08/31/2010 09/01/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPL 3 cc w/encl: William A. Passetti, Chief Alison Brown Florida Bureau of Radiation Control Nuclear Licensing Department of Health Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Ruben D. Almaguer, Director Larry Nicholson, Director Division of Emergency Preparedness Licensing Department of Community Affairs Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Mano Nazar Michael Kiley Executive Vice President and Chief Nuclear Site Vice President Officer Turkey Point Nuclear Plant Florida Power & Light Company Florida Power and Light Company P. O. Box 14000 Electronic Mail Distribution Juno Beach, FL 33408 Niel Batista Senior Resident Inspector Emergency Management Coordinator Turkey Point Nuclear Generating Station Department of Emergency Management U.S. Nuclear Regulatory Commission and Homeland Security 9760 SW 344th St.

Electronic Mail Distribution Florida City, FL 33035 Robert J. Tomonto Attorney General Licensing Manager Department of Legal Affairs Turkey Point Nuclear Plant The Capitol PL-01 Florida Power & Light Company Tallahassee, FL 32399-1050 Electronic Mail Distribution Mike A. Shehadeh, P.E.

Paul Rubin City Manager Plant General Manager City of Homestead Turkey Point Nuclear Plant Electronic Mail Distribution Florida Power and Light Company Electronic Mail Distribution County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Mitch S. Ross Miami, FL 33128 Vice President and Associate General Counsel Gene St. Pierre Florida Power & Light Company Vice President, Fleet Support Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution

FPL 4 Letter to Mano Nazar from Daniel W. Rich dated September 1, 2010

SUBJECT:

TURKEY POINT - NRC INTEGRATED INSPECTION REPORT 05000250/2010 AND 05000251/2010 Distribution w/encl:

C. Evans, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource ROPReports Institute of Nuclear Power Operations (INPO)