Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NG-10-0480, 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature | 30 September 2010 | 10 CFR 50.46 Annual Report of Changes in Peak Cladding Temperature | |
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
NG-10-0473, Notification Letter Designating Duane Arnold Energy Center'S Balance of Plant Systems within the Cyber Security Rule Scope | 27 September 2010 | Notification Letter Designating Duane Arnold Energy Center'S Balance of Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML102670729 | 21 September 2010 | TAC ME4546 - DAEC - Adoption of TSTF-427 Via CLIIP - Acceptance Review Results | |
ML103430558 | 17 September 2010 | FC-2010-09-Draft OP Test | Safe Shutdown Boric Acid High winds Shutdown Margin Grab sample Internal Flooding Operating Basis Earthquake Emergency Lighting Job Performance Measure B.5.b Mitigating Strategies Earthquake Grace period |
ML103430555 | 17 September 2010 | 2010-09-Draft Written Exam Comments | |
ML103430551 | 17 September 2010 | FC-2010-09-Draft Outline Comments | |
ML102530112 | 10 September 2010 | Minutes for the Meeting of the Duane Arnold Plant License Renewal Subcommittee, June 8, 2010 - Rockville, MD | Coatings Aging Management |
Press Release-10-159, NRC Issues Final Safety Evaluation Report for Duane Arnold Nuclear Power Plant License Renewal | 8 September 2010 | Press Release-10-159: NRC Issues Final Safety Evaluation Report for Duane Arnold Nuclear Power Plant License Renewal | Aging Management |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102460537 | 2 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102140384 | 2 September 2010 | Safety Evaluation Report Related to the License Renewal of Duane Arnold Energy Center | |
ML102380522 | 2 September 2010 | Advisory Committee on Reactor Safeguards Review of the Duane Arnold Energy Center, License Renewal Application-Safety Evaluation Report | |
ML102440052 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan - Duane Arnold Energy Center | |
ML101620393 | 22 August 2010 | Notice of Termination of Parent Company Guaranty and 2010 Status of Decommissioning Funding Assurance for Duane Arnold Energy Center | |
NG-10-0429, Response to Request for Additional Information Related to the Duane Arnold Energy Center License Renewal Application - Submerged Inaccessible Low Voltage Cables | 20 August 2010 | Response to Request for Additional Information Related to the Duane Arnold Energy Center License Renewal Application - Submerged Inaccessible Low Voltage Cables | Fire Barrier Aging Management Maintenance Rule Program EVT-1 Fire Protection Program |
NG-10-0427, Supplemental Information Related License Renewal Application - Buried Piping and Tanks Inspection Program | 18 August 2010 | Supplemental Information Related License Renewal Application - Buried Piping and Tanks Inspection Program | Fire Barrier Aging Management Maintenance Rule Program EVT-1 Fire Protection Program |
ML102280109 | 16 August 2010 | Request for Additional Information for the Review of the Duane Arnold Energy Center License Renewal Application - Low Voltage Cables | Aging Management |
NG-10-0372, Application for Technical Specification Change to Add LCO 3.0.9 on the Unavailability of Barriers (TSTF-427) Using the Consolidated Line Item Improvement Process (TSCR-122) | 12 August 2010 | Application for Technical Specification Change to Add LCO 3.0.9 on the Unavailability of Barriers (TSTF-427) Using the Consolidated Line Item Improvement Process (TSCR-122) | Fire Barrier Internal Flooding Incorporated by reference Tornado Generated Missile Turbine Missile |
TAC:ME4546 | 12 August 2010 | ||
ML102240609 | 10 August 2010 | ME4287 - DAEC - License Amendment Request for Approval of Cyber Security Plan - Acceptance for Technical Review | Cyber Security |
IR 05000331/2010003 | 9 August 2010 | IR 05000331-10-003; NextEra Energy Duane Arnold, LLC; 04/01/2010 - 06/30/2010; Duane Arnold Energy Center, Operability Evaluations, Plant Modifications, and Follow-Up of Events and Notices of Enforcement Discretion | Safe Shutdown Offsite Dose Calculation Manual Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Process Control Program Operability Determination Pressure Boundary Leakage Fire Protection Program Unidentified leakage Exclusive Use |
ML102160787 | 4 August 2010 | Email 08/04/10 Duane Arnold ISI Request for Information | Nondestructive Examination VT-2 |
NG-10-0383, Supplemental Information Related to the License Renewal Application - Buried Piping | 29 July 2010 | Supplemental Information Related to the License Renewal Application - Buried Piping | Fire Barrier Coatings Aging Management Maintenance Rule Program EVT-1 Fire Protection Program |
NG-10-0376, Revision to Annual Radioactive Material Release Report | 23 July 2010 | Revision to Annual Radioactive Material Release Report | Annual Radiological Environmental Operating Report |
NG-10-0320, License Amendment Request (TSCR-121A): Request for Approval of Cyber Security Plan | 14 July 2010 | License Amendment Request (TSCR-121A): Request for Approval of Cyber Security Plan | Safe Shutdown Cyber Security Incorporated by reference Safeguards Contingency Plan Fuel cladding Fire Protection Program Cyber attack |
ML101680600 | 6 July 2010 | Safety Evaluation for Request for Relief from Certain Requirements of the ASME Code to Allow Performance of Limited Examinations of Selected Welds | VT-2 Incorporated by reference |
ML101930114 | 6 July 2010 | General Information Request for Member of the Public | |
ML101890739 | 1 July 2010 | Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm | |
ML101820160 | 1 July 2010 | Notification of Potential Part 21 Reportable Condition Re Failure of HPCI Turbine Overspeed Reset Control Valve Diaphragm |