Category:- No Document Type Applies
MONTHYEARML16071A4392016-03-0707 March 2016 Receipt of Cd Containing Revised I/O Files from NextEra Duane Arnold Energy Center Flood Hazard Re-evaulation Report ML16004A3862015-12-11011 December 2015 E-Mail: Duane Arnold Request for Information; December 11, 2015 (AAS) ML14072A0202014-03-10010 March 2014 Flooding Hazards Reevaluation Report in Response to the 10 CFR 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding for the Duane Arnold Energy Center ML13358A3962013-12-19019 December 2013 Enclosuadditional Information to Support Regulatory Conference (EA-13-223) ML13322A4172013-11-0404 November 2013 Submittal of Amendments 286 and 287 to Duane Arnold Energy Center Technical Specifications ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11292A1902012-01-18018 January 2012 Supporting Document and Examples for Information Notice Sblc and RWST Issues ML12003A0652011-12-16016 December 2011 Tornado and High Energy Line Break (HELB) Mitigation License Amendment Requests (Lars) - Responses to Request for Additional Information, Part 3 of 6 ML1117502192011-06-22022 June 2011 NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) ML1102401222011-01-24024 January 2011 ME4984 - Verbal Scripts for Relief Request ML1021607872010-08-0404 August 2010 Email 08/04/10 Duane Arnold ISI Request for Information ML1012704292010-05-13013 May 2010 G20100237/EDATS: OEDO-2010-0304 - Enclosure - Robert Schultes E-mail Relicensing of Duane Arnold Nuclear Power Plant ML0924502942009-08-21021 August 2009 Enclosure 1 to NG-09-0641 - Index of Documents Provided in Response to NRC Request, Part 1 of 2 NG-09-0641, Enclosure 1 to NG-09-0641 - Index of Documents Provided in Response to NRC Request, Part 2 of 22009-08-21021 August 2009 Enclosure 1 to NG-09-0641 - Index of Documents Provided in Response to NRC Request, Part 2 of 2 ML0806704192008-03-0707 March 2008 CDBI Findings ML0729606902007-10-31031 October 2007 Proposed Changes to Public Radiation Safety SDP ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0626801502006-09-22022 September 2006 Escort Ratio for Visitors ML0628901562006-09-0101 September 2006 Selected Radtrad Output - Pellet Release Mvp Trip 10 Minutes ML0628901472006-09-0101 September 2006 Radtrad Source Term File - CRD-GAP RG1-183.NIF and Radtrad Source Term File - CRD-EIV Rgi -1 83.NIF ML0628901512006-09-0101 September 2006 Selected Radtrad Output - Gap Release Mvp Trip 10 Minutes ML0628901542006-09-0101 September 2006 Selected Radtrad Output - Gap Release No Mvp ML0628901592006-09-0101 September 2006 Selected Radtrad Output - Pellet Release No Mvp Operation TSC ML0628901602006-09-0101 September 2006 Selected Radtrad Output - Case 7 Pellet Release Mvp Operating ML0603001582006-01-23023 January 2006 Amendment to Indemnity Agreement No. B-68, Amendment No. 14 ML0920102162004-07-0606 July 2004 Idnr, 2009xx, Safe Drinking Water Information System (Sdwis) Violation Report (Accessed June 4, 2009) ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0305606682003-02-18018 February 2003 Revised DAEC Physical Security Plan, Revision 45 2016-03-07
[Table view] |
Text
SUBJECT:
DUANE ARNOLD ENERGY CENTER, NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION INSPECTION DATES: October 23 through November 22, 2010 INSPECTION PROCEDURE: IP 71111.08, Inservice Inspection INSPECTOR: Don Jones Phone: (630) 829-9622 Email: donald.jones @ nrc.gov A. INFORMATION REQUESTED FOR THE IN-OFFICE PREPARATION WEEK The following information (electronic copy CD ROM) is requested by October 11, 2010, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The inspector will select specific items from the information requested below and request a list of additional documents needed on-site from your staff. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. If you have any questions regarding this information, please call the inspector as soon as possible.
- 1) A schedule and description of:
- a. Non-Destructive Examinations (NDE) planned for Class 1 and 2 Systems and containment, performed as part of your ASME Code ISI Program, and NDE examinations planned for other systems performed as part of a Risk Informed (RI)-ISI Program, to include:
- System Identification (with list of system abbreviations)
- b. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual (VT-1, VT-2, VT-3), which have identified relevant indications on Code Class 1 and 2 Systems since the beginning of the last refueling outage.
1 Enclosure
INSERVICE INSPECTION DOCUMENT REQUEST 2.) List of the welds in Code Class 1 and 2 Systems, that have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage and identify the system, weld number, and reference applicable documentation.
B. INFORMATION TO BE AVAILABLE ON-SITE TO THE INSPECTOR FOLLOWING THE ENTRANCE MEETING
- 1) For welds selected by the inspector, provide copies of the following documents of the weld number and location (e.g., system, train, branch):
- a. Document with a detail of the weld construction;
- b. Applicable Code Edition and Addenda for weldment;
- c. Applicable Code Edition and Addenda for welding procedures;
- d. Applicable weld procedures (WPs) used to fabricate the welds;
- e. Copies of procedure qualification records (PQRs) supporting the WPs on selected welds;
- f. Copies of welders performance qualification records (WPQ);
- g. Copies of mechanical test reports identified in the PQRs above;
- h. Copies of the nonconformance reports for the selected welds;
- i. Radiographs of the selected welds and access to equipment to allow viewing radiographs; and
- j. Copies of the preservice examination records for the selected welds.
- 2) For the ISI related corrective action issues selected by the inspector, provide a copy of the corrective actions and supporting documentation.
- 3) For the nondestructive examination reports with relevant indications on Code Class 1 and 2 Systems selected by the inspector, provide a copy of the examination records and associated corrective action documents.
- 4) Ready access to Sections V, IX, and XI of the ASME Code with Editions applicable to the inservice inspection program, and the repair/replacement program; These copies are provided to the inspector to use for the duration of the inspection at the on-site inspection location and will be returned at the end of the inspection.