Notice of Termination of Parent Company Guaranty and 2010 Status of Decommissioning Funding Assurance for Duane Arnold Energy Center
ML101620393
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/22/2010
From: Feintuch K
Plant Licensing Branch III
To: St.Pierre G
FPL Group Capital
Feintuch K, NRR/DORL/LPL3-1, 415-3079
References
TAC ME3780
Download: ML101620393 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 22, 2010 Mr. Gene St. Pierre Vice President, Fleet Support FPL Group, Inc.

P.O. Box 14000 Juno Beach, FL 33408-0420 SUB..IECT: DUANE ARNOLD ENERGY CENTER - NOTICE OF TERMINATION OF PARENT COMPANY GUARANTY AND 2010 STATUS OF DECOMMISSIONING FUNDING ASSURANCE (TAC NO. ME3780)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) is in receipt of your Notice of Termination of Decommissioning Parent [Company] Guaranty, dated April 7, 2010, Agencywide Documents Access and Management System (ADAMS) Accession No. ML101040713. In it, FPL Group requested that that its Parent Company Guaranty (PCG) for the Duane Arnold Energy Center (DAEC) be terminated, because current financial assurance for DAEC is sufficient without further reliance upon a $93,000,000 Parent Company Guaranty.

NextEra Energy Duane Arnold, LLC submitted a [2010 Annual] Decommissioning Funding Status Report in a letter dated March 25, 2010 (ADAMS Accession No. ML100970069), as supplemented by a letter from Florida Power & Light Company dated May 25, 2010 (ADAMS Accession No. ML101470054).

The NRC staff has reviewed the letters of March 25, April 7, and May 25,2010, and finds no objection to the cancellation of the PCG at the end of the 120 day notice period specified in Appendix A to Title 10 of the Code of Federal Regulations Part 30. The March 25, 2010, submittal included a revised site-specific cost estimate using SAFSTOR which demonstrated that the PCG is no longer necessary to provide decommissioning funding assurance.

However, changing economic environments, along with NRC staff reviews of future Decommissioning Funding Assurance Reports, may require the reintroduction of a FPL Group Parent Company Guaranty for Duane Arnold Energy Center, or another method provided in the regulations.

G. St. Pierre -2 If you have any questions regarding this letter, please contact me at 301-415-3079.

Sincerely, Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc:

Mr. Christopher R. Costanzo Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 Mr. Larry Nicholson Director of Licensing Florida Power & Light Company 700 Universe Boulevard P.O. Box 14000 Juno Beach, FL 33408-0420 Additional Distribution via Listserv

G. S1. Pierre -2 If you have any questions regarding this letter, please contact me at 301-415-3079.

Sincerely, IRAJ Karl Feintuch, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331 cc:

Mr. Christopher R. Costanzo Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 Mr. Larry Nicholson Director of Licensing Florida Power & Light Company 700 Universe Boulevard P.O. Box 14000 Juno Beach, FL 33408-0420 Additional Distribution via Listserv DISTRIBUTION:

PUBLIC LPL3-1 r/f RidsNrrDorlDpr Resource RidsNrrDorlLpl3-1 Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLABTully Resource RidsOgcRp Resource RidsNrrDirsltsb Resource RidsRgn3MailCenter Resource ASimmons, NRR RidsNrrPMDuaneArnold Resource MDusaniwskyj, NRR ADAMS ACCESSION NO.: ML101620393 NRRlLPL3-11 NRRlLPL3-11 OFFICE NRRlPFAB/BC OGC *NLO NRRlLPL3-11 BC PM LA BTuily CRegan NAME KFeintuch SUUal RPascarelli fTHarris for /BRichter for DATE 08/09/10 08/10/10 08/11/10 08/13/10 08/22/10 OFFICIAL RECORD COPY