Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-10-115, Response to Request for Additional Information Related to Generic Letter 2004-0228 September 2010Response to Request for Additional Information Related to Generic Letter 2004-02Loop seal
Mission time
Coatings
Thermoset
Moisture barrier
IR 05000412/201030124 September 2010Er 05000412/2010301; August 16 - September 7, 2010; Beaver Valley Power Station, Unit 2; Initial Operator Licensing Examination Report
L-10-276, Discharge Monitoring Report (NPDES) Permit No. PA002561523 September 2010Discharge Monitoring Report (NPDES) Permit No. PA0025615Grab sample
Zebra Mussel
ML10264054421 September 2010Acceptance Review: FENOC Delta Mururoa Blu SuitMururoa
ML10251078014 September 2010Notice of Forthcoming Meeting with First Energy Nuclear Operating Company, Beaver Valley Power Station, Unit No. 2 & Holtec, Inc., to Discuss the Licensee'S Responses, Dated August 9, 2010
ML1026504337 September 2010Final Qa/Related Forms (Folder 1)Job Performance Measure
ML1024406391 September 2010Mid-Cycle Performance Review and Inspection Plan 2010 - Beaver Valley Units 1 and 2Dissimilar Metal Weld
L-10-249, Proposed 10 CFR 50.55a Requests (VRR2) Associated with American Society of Mechanical Engineers (ASME) Operations and Maintenance (OM) Code Case OMN-1230 August 2010Proposed 10 CFR 50.55a Requests (VRR2) Associated with American Society of Mechanical Engineers (ASME) Operations and Maintenance (OM) Code Case OMN-12
TAC:ME464330 August 2010
L-10-254, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA002561526 August 2010Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615Grab sample
ML10237072025 August 2010Email: Acceptance Review Results Regarding Service Water Pump Testing Relief Requests (ME4385 and ME4393)
IR 05000334/201040324 August 2010IR 05000334-10-403, & IR 05000412-10-403, on 08/02/2010 - 08/05/2010, for Beaver Valley Power Station, Units 1 and 2, Security; Access Control. (Letter Only)Significance Determination Process
ML10231006420 August 2010Withdrawal of the Cyber Security Plan License Amendment Request (TAC Nos. ME2867 and ME2868)Cyber Security
ML10265045919 August 2010Post Exam Comments Resolution References (Folder 1)Time of Discovery
ML10265044519 August 2010Post Exam Comments and Technical References (Folder 1)Time of Discovery
ML10229011517 August 2010U.S. Dept of Homeland Security/Final Report for the April 20, 2010, Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise for the Beaver Valley Power Station/Letter
L-10-237, Supplemental Information in Support of 10 CFR 50.55a Request for Alternative Weld Repair Method for Reactor Vessel Head Penetration J-Groove Welds13 August 2010Supplemental Information in Support of 10 CFR 50.55a Request for Alternative Weld Repair Method for Reactor Vessel Head Penetration J-Groove Welds
L-10-235, Response to Request for Additional Information for License Amendment Request No. 08-027 Re Spent Fuel Pool Rerack9 August 2010Response to Request for Additional Information for License Amendment Request No. 08-027 Re Spent Fuel Pool RerackTime to boil
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
L-10-038, Report of Facility Changes, Tests and Experiments9 August 2010Report of Facility Changes, Tests and Experiments
TAC:ME41766 August 2010
ML1021500396 August 2010Supplemental Information Needed for Acceptance of Requested Licensing Action: Alternative Weld Repair Method for Reactor Vessel Head Penetration J-Groove Welds Relief RequestNondestructive Examination
ML1021803016 August 2010Operator Licensing Examination Approval: Beaver Valley Power Station Unit 2
ML1025103165 August 2010Final Operating Exam (Sections a, B, and C) (Folder 3)Safe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Locked High Radiation Area
Job Performance Measure
Continuous fire watch
Fire Protection Program
Hourly Fire Watch
Early Warning Fire Detection
Unidentified leakage
ML1025102355 August 2010Handouts to Applicants (Folder 3)
ML1025102175 August 2010Final Written Examination with Answer Key (401-5 Format) (Folder 3)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Grab sample
Locked High Radiation Area
Continuous fire watch
Scaffolding
ML1025101965 August 2010Final Outlines (Folder 3)Shutdown Margin
ML1021702005 August 2010Acceptance Review Email Cyber Security Plan License Amendment (ME4383 and ME4384)Cyber Security
TAC:ME43835 August 2010
ML1116800495 August 2010Final Operating Exam (Section C Additional Information) (Folder 3)
ML1116800285 August 2010ES-401-6, Written Examination Quality Checklist
IR 05000334/20100063 August 2010IR 05000334-10-006, 05000412-10-006 on 6/07/2010 - 6/24/2010 for Beaver Valley Power Station, Units 1 & 2, Engineering Specialist Plant Modifications InspectionLoop seal
Weak link
L-10-202, Request for Authorization for Use of Delta Protection Mururoa Blu Single-Use Respiratory Protection Suits2 August 2010Request for Authorization for Use of Delta Protection Mururoa Blu Single-Use Respiratory Protection SuitsMururoa
TAC:ME45902 August 2010
ML10263007129 July 2010FEMA - Submittal of Final Report for Radiological Emergency Preparedness Exercise for Beaver Valley Power Station, Held on April 20, 2010
L-10-226, Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations28 July 2010Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
L-10-228, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for June 201027 July 2010Discharge Monitoring Report (NPDES) Permit No. PA0025615 for June 2010Grab sample
TAC:ME438522 July 2010
L-10-194, CFR 50.55a Requests Associated with Service Water Pump Testing22 July 2010CFR 50.55a Requests Associated with Service Water Pump Testing
IR 05000334/201000319 July 2010IR 05000334-10-003, 05000412-10-003, on 04/01/2010 - 06/30/2010; Beaver Valley Power Station, Units 1 & 2; Routine Integrated Report and EA-08-319Internal Flooding
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
Biofouling
ML10193001614 July 2010Request for Consent to Extinguish Parental Guaranty
ML1018803267 July 2010Alternative NDE Requirements for Asame Class 1 and 2 Piping Components Relief Request
ML1025201753 July 2010NRC Comments on Draft Licensee-Developed Exam (Written & Operating Tests) (Folder 2)
ML1016004081 July 2010Issuance of Amendment Regarding Automated Statistical Treatment of Uncertainty Method Implementation for Large Break Loss of Coolant Accident Analysis