Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09261005925 September 2009G20090292/LTR-09-0210/EDATS: SECY-2009-0248 - Mary Lampert Letter 2.206 Petition Addressed to Chairman Jaczko Dated May 14, 2009, in Regards to Pilgrim/Refuling Outage 2009Double blade guide
Foreign Material Exclusion
ML09237054911 September 2009Relief Request (PRR)19, Install a Weld Overlay on Jet Pump Instrumentation Nozzle Weld RPV-N9A-1- Pilgrim Nuclear Power StationNon-Destructive Examination
Weld Overlay
Hydrostatic
Incorporated by reference
Finite Element Analysis
Liquid penetrant
Dissimilar Metal Weld
TAC:ME22219 September 2009
ML0924702014 September 2009Requalification Program Inspection (Pilgrim Nuclear Power Station)
ML0924401171 September 2009Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station
TAC:ME189731 August 2009
ML09245059224 August 2009Submittal of Refueling Outage (RFO) -17 In-Service Inspection (ISI) Owners Activity Report (OAR)-1
ENOC-09-00025, Entergy Nuclear Operations, Inc., Update Regarding Status and Request for Threshold Determination Under 10 CFR 50.8018 August 2009Entergy Nuclear Operations, Inc., Update Regarding Status and Request for Threshold Determination Under 10 CFR 50.80
ML09232012413 August 2009Stress Analysis Reports for Reactor Pressure Vessel (RPV) Jet Pump Instrumentation Nozzle Weld, RPV-N9A-1 Overlay Repair (Pilgrim Relief Request (PRR) -19)Weld Overlay
Finite Element Analysis
Stress corrosion cracking
Dissimilar Metal Weld
ML09231014412 August 2009Response to RIS 2009-11, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
ML09233023110 August 2009Rev. 0 to 0900530.306, Pilgrim, ASME Code, Section III Evaluation of N9A Jet Pump Instrument Nozzle with Weld Overlay Repair.Weld Overlay
Hydrostatic
Finite Element Analysis
Stress corrosion cracking
License Renewal
Dissimilar Metal Weld
ML0922400795 August 2009Notification Regarding Refueling Outage (RFO) -17 In-Service Inspection (ISI) Owners Activity Report (OAR)-1
ML0921706403 August 2009the States of New York, Connecticut, and Massachusetts V. USNRC and Entergy Nuclear Operations Inc., 08-3903ag(L) - Federal Respondents Brief (Entergy)Probabilistic Risk Assessment
Incorporated by reference
Safeguards Contingency Plan
License Renewal
Earthquake
Turbine Missile
Fuel cladding
ML09152015424 July 2009Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses for Big Rock Point, James A. FitzPatrick Nuclear Power Plant, Indian Point, Palisades, Pilgrim, and Vermont Yankee
ML09205037824 July 2009Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses
NRC-2009-0336, Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses24 July 2009Order Extending the Effectiveness of the Approval of the Indirect Transfer of Facility Operating Licenses
ML09211068423 July 2009Relief Request (PRR)-19, Jet Pump Instrumentation Nozzle Weld, RPV-N9A-1 Repair Plan - Change in Commitment Schedule to Submit Stress Analysis ReportWeld Overlay
Dissimilar Metal Weld
IR 05000293/200900320 July 2009IR 05000293-09-003; 04/01/2009 - 06/30/2009; Pilgrim Nuclear Power Station; Refueling and Other Outage ActivitiesSafe Shutdown
High Radiation Area
Mission time
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Weld Overlay
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Double blade guide
Local Leak Rate Testing
Foreign Material Exclusion
Integrated leak rate test
Operability Determination
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Fire Protection Program
Scaffolding
Power change
Thermography
TAC:ME151510 July 2009
TAC:ME151710 July 2009
ML0918800176 July 2009Pilgrim - NRC Staff'S Reply to Pilgrim Watch'S Brief in Response to CLI-09-11Probabilistic Risk Assessment
ML0919504506 July 2009Pilgrim Watch'S Brief in Response to NRC Staff'S Initial Brief in Response to CLI-09-11 (Requesting Additional Briefing)Chernobyl
ML0919504516 July 2009Entergy'S Reply to Pilgrim Watch'S Brief in Response to CLI-09-11Chernobyl
ML0919504526 July 2009Pilgrim Watch Brief in Response to Entergy'S Response to CLI-09-11(Requesting Additional Briefing)