ML092240079

From kanterella
Jump to navigation Jump to search
Notification Regarding Refueling Outage (RFO) -17 In-Service Inspection (ISI) Owners Activity Report (OAR)-1
ML092240079
Person / Time
Site: Pilgrim
Issue date: 08/05/2009
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML092240079 (2)


Text

S' Entergy- Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Assessment August 5, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Notification of Submittal of Pilgrim Refueling Outage (RFO) -17 In-Service Inspection (ISI) Owners Activity Report (OAR)-1 LETTER NUMBER: 2.09.045

Dear Sir or Madam:

The Pilgrim Nuclear Power Station (Entergy) is in the Fourth In-Service Inspection (ISI) Interval and is subject to the 1998/2000 Addenda of the American Society of Mechanical Engineers (ASME) Code of Record.

The Entergy In-Service Inspection Program incorporates NRC-approved Code Case N-532-4 which requires Entergy to submit to the NRC the ISI Owners Activity Report (OAR-i) for Refueling Outage (RFO)-17 by August 17, 2009 (90-days Post-RFO).

This report is not ready for submittal because difficulties were encountered with the transfer of component data from a retired component part database into a newly installed system for traceability of component information related to the repair and replacement activities.

Therefore, Entergy hereby notifies the NRC that the report will be submitted by November 15, 2009. This 90 day extension would allow Entergy to correct the traceability issues in order to execute the NIS-1 and NIS-2 Forms to complete the report. This extension was discussed with the Entergy NRR Project Manager prior to this submittal.

There are no new commitments made in this letter.

-A 0Q7

Entergy Nuclear Operations, Inc. Letter Number: 2.09.045 Pilgrim Nuclear Power Station Page 2 If you have any questions regarding the information contained in this letter, please contact Pilgrim Licensing Manager, Joseph R. Lynch at (508) 830-8403.

Sincerely, Stephen J. Bethay Director, Nuclear Safety Assessment WGL/dl cc: Mr. James S. Kim, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. NRC, Region 1 475 Allendale Road King of Prussia, PA 19406 Senior ResidernWspector Pilgrim Nuclear Power Station