Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
WBL-24-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC) | 30 January 2024 | Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC) | |
PMNS20240088, Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications | 30 January 2024 | Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request to Revise the Watts Bar Nuclear Plant Technical Specifications | |
ML23319A245 | 29 January 2024 | Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML24022A259 | 22 January 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator | |
ML24008A159 | 18 January 2024 | Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan | |
ML24008A246 | 18 January 2024 | Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule | Aging Management Pressure and Temperature Limits Report Tritium Producing Burnable Absorber Rods License Renewal |
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | 17 January 2024 | Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | |
ML24016A076 | 16 January 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications | |
CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | 10 January 2024 | Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | |
CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability | 9 January 2024 | Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability | Time of Discovery Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Incorporated by reference Turbine Missile |
CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) | 8 January 2024 | Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) | Anticipated operational occurrence Qualified Offsite Circuit Surveillance Frequency Control Program Offsite Circuit |
ML23346A138 | 3 January 2024 | Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods | Tritium Producing Burnable Absorber Rods |