Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000454/20230042 February 2024Integrated Inspection Report 05000454/2023004 and 05000455/2023004
ML24029A17430 January 2024Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion
ML24009A05524 January 2024Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications
ML24022A27223 January 2024Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011License Renewal
ML24018A17719 January 2024Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw
ML24018A03617 January 2024Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618
PMNS20231393, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.28 January 2024Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.2
ML24003A1818 January 2024Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024
ML23362A0042 January 2024Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections