Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NL-21-0307, Report on Status of Decommissioning Funding31 March 2021Report on Status of Decommissioning Funding
NL-21-0278, Completion of License Renewal Activities Prior to Entering26 March 2021Completion of License Renewal Activities Prior to Entering
NL-21-0065, License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative Controls25 March 2021License Amendment Request to Revise Technical Specification 5.7, High Radiation Area, Administrative ControlsHigh Radiation Area
Fuel cladding
PMNS20210227, Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding a Proposed Quality Assurance (QA) Licensing Action for the SNC Fleet25 March 2021Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding a Proposed Quality Assurance (QA) Licensing Action for the SNC Fleet
ML21083A28724 March 2021Pre-Submittal Meeting - Quality Assurance Topical Report Revision to Allow Application of Remote Assessment Techniques During Exigent ConditionsPandemic
Coronavirus
Grace period
NL-21-0020, Final Supplemental Response to NRC Generic Letter 2004-0223 March 2021Final Supplemental Response to NRC Generic Letter 2004-02
NL-21-0289, Edwin I Hatch Nuclear Plant Units 1 and 2, Joseph M. Farley Nuclear Plant Units 1 and 2, Vogtle Electric Generating Plant Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 202122 March 2021Edwin I Hatch Nuclear Plant Units 1 and 2, Joseph M. Farley Nuclear Plant Units 1 and 2, Vogtle Electric Generating Plant Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 2021
NL-21-0290, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)22 March 2021Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)
ML21063A32812 March 2021Public Mtg Summary March 4, 2021 with Southern Nuclear Operating Company, Inc., a Proposed LAR to Change the TS Related to Heat Flux Hot Channel Factor for Joseph M. Farley Nuclear Plant, Units 1 & 2, and Vogtle Electric Generating Plant, U
IR 05000348/20200063 March 2021Annual Assessment Letter for Joseph M. Farley Nuclear Plant - Report 05000348/2020006 and 05000364/2020006Fitness for Duty
Exemption Request
Power-Operated Valves
COVID-19
NL-21-0019, Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2 March 2021Response to Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Earthquake
Power Operated Valves
ML21059C11528 February 2021Single Positive Test Form Collected on 07/20/2020
ML21057A01826 February 2021Pre-Submittal Meeting Revise Technical Specification 3.2.1 Heat Flux Hot Channel Factor (Fq(Z)) (EPID L-2021-LRM-0023) (Slides)
ML21056A14925 February 2021Single Positive Test Form Collected on 10/06/2020
ML21056A12825 February 2021Annual Report Form for Drug and Alcohol Tests for 2020
ML21056A14725 February 2021Single Positive Test Form Collected on 10/06/2020
ML21056A14825 February 2021Single Positive Test Form Collected on 10/06/2020
ML21056A15025 February 2021Single Positive Test Form Collected on 10/07/2020
ML21056A15125 February 2021Single Positive Test Form Collected on 10/08/2020
ML21056A15725 February 2021Single Positive Test Form Collected on 12/08/2020
ML21056A15625 February 2021Single Positive Test Form Collected on 12/04/2020
ML21056A15525 February 2021Single Positive Test Form Collected on 11/30/2020
ML21056A15425 February 2021Single Positive Test Form Collected on 11/05/2020
ML21056A15325 February 2021Single Positive Test Form Collected on 10/26/2020
ML21056A15225 February 2021Single Positive Test Form Collected on 10/13/2020
ML20342A01824 February 2021Audit Plan for Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization PositionsCOVID-19
ML21047A26219 February 2021Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Change the Core Power Distribution Monitoring SystemShutdown Margin
PMNS20210198, Meeting with Southern Nuclear Operating Company (SNC) to Discuss Planned License Amendment Requests for Joseph M. Farley Nuclear Plant, Units 1 and 2; Vogtle Electric Generating Plant, Units 1 and 218 February 2021Meeting with Southern Nuclear Operating Company (SNC) to Discuss Planned License Amendment Requests for Joseph M. Farley Nuclear Plant, Units 1 and 2; Vogtle Electric Generating Plant, Units 1 and 2
ML21049A07417 February 2021Document Request for Farley Nuclear Plant- Radiation Protection Inspection - Inspection Report 2021-02Process Control Program
NL-21-0061, Inservice Inspection Program Owner'S Activity Report for Outage 2R2712 February 2021Inservice Inspection Program Owner'S Activity Report for Outage 2R27Through-Wall Leak
Through Wall Leak
IR 05000348/202000411 February 2021Integrated Inspection Report 05000348/2020004 and 05000364/2020004 and Independent Spent Fuel Storage Installation Report 07200042/2020003Boric Acid
High Radiation Area
Operator Manual Action
Temporary Modification
VT-2
Functionality Assessment
Annual Radioactive Effluent Release Report
Open Phase Condition
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Downpower
Measurement Uncertainty Recapture
ML21036A1175 February 2021SNC Slides - Pre-Submittal Meeting on February 16, 2021 - Beacon LAR
PMNS20210106, Pre-Submittal Meeting for Farley and Vogtle Regarding the Proposed Best Estimate Analyzer for Core Operations Nuclear (Beacon) Technical Specification Monitor (Tsm) License Amendment Request (LAR)5 February 2021Pre-Submittal Meeting for Farley and Vogtle Regarding the Proposed Best Estimate Analyzer for Core Operations Nuclear (Beacon) Technical Specification Monitor (Tsm) License Amendment Request (LAR)
ML21048A11819 January 2021(50-348, 50-364), Annual Fatigue Form for 2020
IR 05000348/202001014 January 2021Design Basis Assurance Inspection (Programs) Inspection Report 05000348/2020010 and 05000364/2020010Large early release frequency
Time Critical Operator Action
Coronavirus
COVID-19
Very Low Safety Significance Issue Resolution
ML21012A32412 January 2021NRR E-mail Capture - Request for Additional Information - Farley, 1 and 2 - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsInternal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
NL-20-1369, & Vogtle Electric Generating Plant Units 1 and 2 - Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis12 January 2021& Vogtle Electric Generating Plant Units 1 and 2 - Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis
ML21019A39311 January 20211 GFE Annual Letter for Fy 2021Generic Fundamentals Examination
COVID-19