Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PLA-7694, Nuclear Property Insurance Program (PLA-7694)29 March 2018Nuclear Property Insurance Program (PLA-7694)
PLA-7695, Guarantee of Payment of Deferred Premiums - 10 CFR 140-21 PLA-769529 March 2018Guarantee of Payment of Deferred Premiums - 10 CFR 140-21 PLA-7695
ML18087A00221 March 2018Crane Nuclear, Inc. - Final Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in StemCondition Adverse to Quality
IR 05000387/201700412 March 2018Revised Integrated Inspection Report 05000387/2017004 and 05000388/2017004High Radiation Area
Fire Barrier
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Operability Determination
Siren
IR 05000387/20184105 March 2018Baseline Security Inspection Report 05000387-2018410 and 05000388-2018410 (Cover Letter)Affidavit
ML18060A2841 March 2018Operator Licensing Examination Approval
IR 05000387/20180101 March 2018Design Bases Assurance Inspection (Programs) Report 05000387/2018010 and 05000388/2018010Reactor Vessel Water Level
ML18059A02728 February 2018Single Positive Test Form Collected on 02/28/2017
ML18059A03028 February 2018Single Positive Test Form Collected on 03/02/2017
ML18059A02628 February 2018Single Positive Test Form Collected on 02/13/2017
ML18059A02528 February 2018Single Positive Test Form Collected on 03/02/2017
ML18059A02428 February 2018Single Positive Test Form Collected on 03/02/2017
ML18059A02228 February 2018Single Positive Test Form Collected on 07/14/2017
ML18059A02128 February 2018Single Positive Test Form Collected on 02/27/2017
ML18059A02028 February 2018Single Positive Test Form Collected on 01/30/2017
ML18059A01828 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ML18059A00228 February 2018Annual Fatigue Report Form for 2017
IR 05000387/201700628 February 2018Annual Assessment Letter for Susquehanna Units 1 and 2 (Report 05000387-2017006 and 05000388-2017006 Report 05000387-2017402 and 05000388-2017402 Report 05000387-2017501 and 05000388-2017501)Fitness for Duty
Cyber Security
ML18072A10028 February 2018Revision 11 to Technical Specifications Bases ManualSafe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Qualified Offsite Circuit
Surveillance Frequency Control Program
Scram Discharge Volume
Offsite Circuit
ML18072A09928 February 2018Technical Specification Bases ManualSafe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Qualified Offsite Circuit
Surveillance Frequency Control Program
Scram Discharge Volume
Offsite Circuit
ML18059A03128 February 2018Single Positive Test Form Collected on 03/06/2017
ML18059A81228 February 2018Single Positive Test Form Collected on 02/28/2017
ML18059A81128 February 2018Single Positive Test Form Collected on 01/03/2017
ML18059A81028 February 2018Single Positive Test Form Collected on 07/10/2017
ML18059A80928 February 2018Single Positive Test Form Collected on 02/28/2017
ML18059A80828 February 2018Single Positive Test Form Collected on 02/23/2017
ML18059A80728 February 2018Single Positive Test Form Collected on 02/28/2017
ML18059A80628 February 2018Single Positive Test Form Collected on 03/06/2017
ML18059A80528 February 2018Single Positive Test Form Collected on 03/02/2017
ML18059A03728 February 2018Single Positive Test Form Collected on 02/28/2017
ML18059A03628 February 2018Single Positive Test Form Collected on 01/03/2017
ML18059A03528 February 2018Single Positive Test Form Collected on 07/10/2017
ML18059A03428 February 2018Single Positive Test Form Collected on 02/28/2017
ML18059A03328 February 2018Single Positive Test Form Collected on 02/23/2017
ML18059A03228 February 2018Single Positive Test Form Collected on 02/28/2017
ML18053A77421 February 2018Tenth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. Without Enclosure 2FLEX
Spent Fuel Pool Instrumentation
CAC:MF088821 February 2018
ML18109A32921 February 2018Final Qa/Related Forms (Folder 1)Job Performance Measure
CAC:U0195021 February 2018
ML18086B02516 February 2018Facility Cover Letter - Ri - March 2018 - GFE
PLA-7673, Proposed Amendment to Licenses NPF-14 and NPF-22: Response to Request for Additional Information and Supplement to Application to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-767316 February 2018Proposed Amendment to Licenses NPF-14 and NPF-22: Response to Request for Additional Information and Supplement to Application to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7673Reactor Vessel Water Level
Water Inventory Control
05000388/LER-2017-0102 February 2018Condition Prohibited by Technical Specifications Due to Drift of Reactor Pressure Switches
LER 17-010-00 for Susquehanna, Unit 2 Regarding Condition Prohibited by Technical Specifications Due to Drift of Reactor Pressure Switches
ML18033A0121 February 2018Integrated Inspection Report 05000387/2017004 and 05000388/2017004High Radiation Area
Coatings
Functionality Assessment
Condition Adverse to Quality
Job Performance Measure
Foreign Material Exclusion
Operability Determination
Siren
ML18078A53631 January 2018Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update)
ML18026A07926 January 2018ER-Operating License Stage - Landscaping Plan - Figure 3.1-4
ML18026A14226 January 2018Plant Design Drawing Reactor Building Unit #1 Area 27 Plan of Elev. 645'-0 - Drawing M-27-1, Rev. 7
ML18026A20026 January 2018Map of Susquehanna Ses Vicinity - Figure 2.1
ML18026A17726 January 2018Diesel Generator Structural Steel El 677'-0 El 710'-9 - Attachment 2 to Pld - 1164
ML18026A17626 January 2018Diesel Generator Building Floor Plan El. 710'-9 Areas 43644 - Drawing C-904
ML18026A17226 January 2018Plant Site Construction Phase - Plate 17