Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18075A262 | 26 March 2018 | Transmittal of Draft SE for Proposed Amendment Methodology Reports DPC-NE-3008-P, Rev. 0, Thermal-Hydraulic Models for Transient Analysis, and DPC-NE-3009-P, Rev. 0, Fsar/Ufsar Ch. 15 Transient Analysis Methodology | |
ML18074A020 | 20 March 2018 | Fpra FAQ 16-0011 Closure Memo | Probabilistic Risk Assessment Thermoset Cable Tray Ignition |
ML18064A133 | 19 March 2018 | Summary of February 27, 2018, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1, Regarding Emergency Plan Emergency Action Level Scheme Changes (L-2017-LRM-00 | |
ML18073A352 | 15 March 2018 | FAQ 18-0017 Conditional Trip Probability for Modeling Operator Discretion | |
ML18073A358 | 15 March 2018 | NRC Staff Comments FAQ 18-0015 | |
ML18073A355 | 15 March 2018 | FAQ 18-0014 - Time to Detection Is Zero for Manual Non-Suppression Probability | |
ML18068A246 | 9 March 2018 | Reassignment of U.S. Nuclear Regulatory Commission Acting Branch Chief | |
ML18071A368 | 9 March 2018 | NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1- Acceptance of Application to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Reactors | |
ML18065A433 | 1 March 2018 | 301 Written Exam Approval Letter | |
ML18059A088 | 28 February 2018 | EOC Assessment Letter | Fitness for Duty Cyber Security |
RA-18-0002, H. 8. Robinson, Unit 2, Crystal River, Unit 3, Submittal of Onsite Property Insurance Coverage | 27 February 2018 | H. 8. Robinson, Unit 2, Crystal River, Unit 3, Submittal of Onsite Property Insurance Coverage | |
RA-18-0003, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 27 February 2018 | CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
ML18058A417 | 27 February 2018 | Duke - Submittal of Evidence of 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
ML18058A655 | 27 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
ML18058A656 | 27 February 2018 | Single Positive Test Form Collected on 03/06/2017 | |
ML18058A657 | 27 February 2018 | Single Positive Test Form Collected on 04/06/2017 | |
ML18058A658 | 27 February 2018 | Single Positive Test Form Collected on 10/26/2017 | |
ML18058A660 | 27 February 2018 | Single Positive Test Form Collected on 11/13/2017 | |
ML18058A661 | 27 February 2018 | Annual Fatigue Report Form for 2017 | |
RA-18-000, Duke - Submittal of Evidence of 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 27 February 2018 | Duke - Submittal of Evidence of 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
RA-18-0003, Duke - Submittal of Evidence of 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 27 February 2018 | Duke - Submittal of Evidence of 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
ML18058B224 | 26 February 2018 | Emailed Radiation Safety RFI | High Radiation Area Locked High Radiation Area Process Control Program |
HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.2 | 19 February 2018 | Annual Report in Accordance with Technical Specification 6.9.1.2 | |
HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses | 16 February 2018 | Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses | |
HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 1 | 14 February 2018 | Cycle 21 Core Operating Limits Report, Revision 1 | Shutdown Margin |
ML18046A331 | 9 February 2018 | RFI 2018002 ADAMS Package | Boric Acid Non-Destructive Examination Nondestructive Examination Incorporated by reference Flow Accelerated Corrosion Liquid penetrant |
HNP-18-017, CFR 50.54(q) Evaluations | 5 February 2018 | CFR 50.54(q) Evaluations | Safe Shutdown Cyber Security Emergency Lighting FLEX Severe Accident Management Guideline Safeguards Contingency Plan Exemption Request Earthquake Minimum staff Siren |
RA-18-0005, Transmittal of Cyber Security Plan, Revisions 0 and 1 | 2 February 2018 | Transmittal of Cyber Security Plan, Revisions 0 and 1 | Cyber Security |
HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. | 1 February 2018 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. | Safe Shutdown High winds Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment Incorporated by reference Thermoset Large early release frequency License Renewal Manual Operator Action |
IR 05000400/2017004 | 23 January 2018 | NRC Integrated Inspection Report 05000400/2017004 | Internal Flooding Functionality Assessment Operability Determination Fire Protection Program Downpower |
HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements | 22 January 2018 | Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements | |
HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses | 18 January 2018 | Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Fuel cladding Affidavit |
HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations | 11 January 2018 | License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations | Safe Shutdown High winds Tornado Missile Probabilistic Risk Assessment Incorporated by reference Tornado-Generated Missile Tornado Missile Protection Large early release frequency Tornado Missile Risk Evaluator |
ML18016A687 | 10 January 2018 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2018 | Generic Fundamentals Examination |
ML18005A548 | 8 January 2018 | Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996; EPID L-2017-LLA-0303) | |
HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors | 4 January 2018 | Submittal of 14-Day Special Report for Accident Radiation Monitors | |
ML18002A542 | 2 January 2018 | Emergency Preparedness Inspection and Request for Information |