ML18075A262

From kanterella
Jump to navigation Jump to search

Transmittal of Draft SE for Proposed Amendment Methodology Reports DPC-NE-3008-P, Rev. 0, Thermal-Hydraulic Models for Transient Analysis, and DPC-NE-3009-P, Rev. 0, Fsar/Ufsar Ch. 15 Transient Analysis Methodology
ML18075A262
Person / Time
Site: Harris, Robinson  Duke Energy icon.png
Issue date: 03/26/2018
From: Dennis Galvin
Plant Licensing Branch II
To: Capps S
Duke Energy Progress
Galvin D
Shared Package
ML18075A272 List:
References
CAC MF8439, CAC MF8440, DPC-NE-3008-P, Rev 0, DPC-NE-3009-P, Rev 0, EPID L-2016-LLA-0012
Download: ML18075A262 (3)


Text

OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 26, 2018 Mr. Steven Capps Senior Vice President Nuclear Corporate 526 South Church Street, EC-07H Charlotte, NC 28202

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2-TRANSMITTAL OF DRAFT SAFETY EVALUATION FOR PROPOSED AMENDMENT RE: METHODOLOGY REPORTS DPC-NE-3008-P, REVISION 0, "THERMAL-HYDRAULIC MODELS FOR TRANSIENT ANALYSIS," AND DPC-NE-3009-P, REVISION 0, "FSAR I UFSAR CHAPTER 15 TRANSIENT ANALYSIS METHODOLOGY" (CAC NOS. MF8439 AND MF8440; EPID L-2016-LLA-0012)

Dear Mr. Capps:

By letter dated November 19, 2015, as superseded by application dated October 3, 2016, and as supplemented by letters dated November 10, 2016, October 9 and 30, 2017, and December 19, 2017, Duke Energy Progress, LLC (Duke Energy) submitted a request, in accordance with Title 1O of the Code of Federal Regulations (1 O CFR), Section 50.90, for Shearon Harris Nuclear Power Plant, Unit 1 (Harris) and H. B. Robinson Steam Electric Plant, Unit 2 (Robinson) to amend its technical specifications to adopt the methodology reports DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis," and DPC-NE-3009-P, Revision 0, "FSAR I UFSAR Chapter 15 Transient Analysis Methodology," for application specific to Harris and Robinson. In its submittal, Duke Energy requested review and approval of these methodologies for plant-specific use only, allowing these methodologies be used at Harris and Robinson to perform the subject analyses in-house.

Enclosed is the draft Safety Evaluation (SE) that the Nuclear Regulatory Commission (NRG) staff has prepared to support the proposed license amendment. The draft SE is being withheld from public disclosure at this time because it contains proprietary information pursuant to 10 CFR 2.390. Proprietary information is identified by text enclosed within double brackets as shown here (( )).

The NRG staff requests that Duke Energy provide comments regarding the proprietary content in the draft SE by close of business on April 5, 2018. The response timeframe was discussed with Mr. Joshua Due of your staff on March 15, 2018. If circumstances result in the need to revise your response date, please let me know.

Enclosure transmitted herewith contains sensitive unclassified information.

When separated from enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLY PROPRIETARY INFORMATION

OFFICIAL USE ONLY PROPRIETARY INFORMATION Since the NRC review is not yet complete, this letter and the enclosure do not convey or represent an NRC staff position regarding the licensee's request. Should the amendment be approved, the NRC staff will prepare a redacted, publicly available, nonproprietary version of the SE.

If you have any questions concerning this letter, please contact me at 301-415-6256 or by email at Dennis.Galvin@nrc.gov.

Sincerely,

,j~~~

Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261 and 50-400

Enclosures:

Draft Proprietary SE cc w/o enclosure: Distribution via Listserv OFFICIAL USE ONLY PROPRIETARY INFORMATION

Package: ML18075A272 Cover Letter: ML18075A262 Propr1etary SE . ML18075A196 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DORL/LPL2-2/BC(A) DORL/LPL2-2/PM NAME DGalvin BClayton BTindell DGalvin DATE 03/16/18 03/16/18 03/20/18 03/26/18