Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18082A05529 March 2018Letter - Withdrawal of an Amendment Request to Adopt TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times -RITSTF Initiative 4b (CAC Nos. MF3240 and MF3241; EPID L-2013-LLA-0001)Probabilistic Risk Assessment
Large early release frequency
DCL-18-023, 2018 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant26 March 20182018 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant
DCL-18-021, Core Operating Limits Report for Unit 2 Cycle 2122 March 2018Core Operating Limits Report for Unit 2 Cycle 21Shutdown Margin
Coast down
IR 05000275/201830120 March 2018NRC Examination Report 05000275/2018301; 05000323/2018301
DCL-18-016, Withdrawal of License Amendment Request 13-02 Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505. Revision 1. Provide Risk-Informed Extended Completion Times - Times RITSTF Initiative 487 March 2018Withdrawal of License Amendment Request 13-02 Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505. Revision 1. Provide Risk-Informed Extended Completion Times - Times RITSTF Initiative 48Probabilistic Risk Assessment
DCL-09-079, Request to Withdraw the Diablo Canyon Power Plant License Renewal Application7 March 2018Request to Withdraw the Diablo Canyon Power Plant License Renewal ApplicationLicense Renewal
Press Release-18-008, NRC Issues Annual Assessments for Nation'S Nuclear Plants5 March 2018Press Release-18-008: NRC Issues Annual Assessments for Nation'S Nuclear Plants
IR 05000275/20170061 March 2018Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017006 and 05000323/2017006)Open Phase Condition
ML18061A0411 March 2018Notification of NRC Design Bases Assurance Inspection (Programs) and (05000275/2018010 05000323/2018010) and Initial Request for InformationCommercial Grade Dedication
ML18064A35627 February 2018DC 2018-01 Post Examination Analysis
ML18053A87422 February 2018Single Positive Test Form Collected on 08/08/2017
ML18053A86422 February 2018Annual Fatigue Report Form for 2017
ML18053A86522 February 2018Annual Report Form for Drug and Alcohol Tests for 2017
ML18053A86622 February 2018Single Positive Test Form Collected on 03/01/2017
ML18053A86722 February 2018Single Positive Test Form Collected on 03/06/2017
ML18053A86822 February 2018Single Positive Test Form Collected on 03/09/2017
ML18053A86922 February 2018Single Positive Test Form Collected on 03/20/2017
ML18053A87022 February 2018Single Positive Test Form Collected on 03/21/2017
ML18053A87122 February 2018Single Positive Test Form Collected on 04/03/2017
ML18053A87222 February 2018Single Positive Test Form Collected on 04/11/2017
ML18053A87322 February 2018Single Positive Test Form Collected on 04/11/2017
ML18053A87522 February 2018Single Positive Test Form Collected on 11/07/2017
ML18081A9649 February 2018DC 2018-01 Public Forms
ML18064A3579 February 2018DC-2018-01 Draft Written ExaminationBoric Acid
Shutdown Margin
Time Critical Operator Action
Earthquake
Fuel cladding
Offsite Circuit
Power change
ML18064A3559 February 2018DC 2018-01 Final Written ExaminationShutdown Margin
Time Critical Operator Action
Earthquake
Fuel cladding
Offsite Circuit
Power change
Downpower
ML18064A3549 February 2018DC 2018-01 Final OutlinesPost Accident Monitoring
Time Critical Operator Action
Offsite Circuit
ML18064A3539 February 2018DC 2018-01 Final Operating TestBoric Acid
High Radiation Area
Grab sample
Post Accident Monitoring
Operating Basis Earthquake
Job Performance Measure
Time Critical Operator Action
Earthquake
Deep Dose Equivalent
EVT-1
Offsite Circuit
Downpower
Coast down
ML18064A3529 February 2018DC 2018-01 Draft Written Examination CommentsPower change
ML18064A3519 February 2018DC 2018-01 Draft OutlinesPost Accident Monitoring
Time Critical Operator Action
Offsite Circuit
ML18064A3509 February 2018DC 2018-01 Draft Outline Comments
ML18064A3499 February 2018DC 2018-01 Draft Operating TestBoric Acid
High Radiation Area
Grab sample
Post Accident Monitoring
Operating Basis Earthquake
Job Performance Measure
Time Critical Operator Action
Earthquake
Deep Dose Equivalent
EVT-1
Offsite Circuit
Downpower
Coast down
ML18064A3489 February 2018DC 2018-01 Draft Operating Test Comments
IR 05000275/20170046 February 2018NRC Integrated Inspection Report 05000275/2017004 and 05000323/2017004Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Downpower
Siren
DCL-18-004, Submittal of Errata for the Mitigating Strategies Assessment (MSA) for Flooding Report1 February 2018Submittal of Errata for the Mitigating Strategies Assessment (MSA) for Flooding Report
ML18023A71526 January 2018Residual Heat Removal Suction Weld Joint Flaw Evaluation (CAC No. MG0140; EPID L-2017-LRO-0026)
IR 05000275/201700724 January 2018DCPP - Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/ Multi Unit Dose Assessment Plans - Inspection Report (05000275/2017007 and 050003FLEX
Spent Fuel Pool Instrumentation
IR 05000275/201704023 January 2018NRC Supplemental Inspection Report and Assessment Follow-Up Letter; 05000275/2017040 and 05000323/2017040
ML18019A01619 January 2018NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301
ML18022A04418 January 2018Fourth Joint Status Report (DC Cir.)(Case No. 16-1004) 1-18-18
IR 05000275/201750117 January 2018NRC Emergency Preparedness Annual Inspection Report 05000275/2017501 and 05000323/2017501
ML18005A42210 January 2018Correction to Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation
ML18009A9858 January 2018Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018Generic Fundamentals Examination