Issue date | Title | Topic | |
---|---|---|---|
ML18082A055 | 29 March 2018 | Letter - Withdrawal of an Amendment Request to Adopt TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times -RITSTF Initiative 4b (CAC Nos. MF3240 and MF3241; EPID L-2013-LLA-0001) | Probabilistic Risk Assessment Large early release frequency |
DCL-18-023, 2018 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant | 26 March 2018 | 2018 Annual Statement of Insurance for Pacific Gas and Electric Company'S Diablo Canyon Power Plant and Humboldt Bay Power Plant | |
DCL-18-021, Core Operating Limits Report for Unit 2 Cycle 21 | 22 March 2018 | Core Operating Limits Report for Unit 2 Cycle 21 | Shutdown Margin Coast down |
IR 05000275/2018301 | 20 March 2018 | NRC Examination Report 05000275/2018301; 05000323/2018301 | |
DCL-18-016, Withdrawal of License Amendment Request 13-02 Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505. Revision 1. Provide Risk-Informed Extended Completion Times - Times RITSTF Initiative 48 | 7 March 2018 | Withdrawal of License Amendment Request 13-02 Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505. Revision 1. Provide Risk-Informed Extended Completion Times - Times RITSTF Initiative 48 | Probabilistic Risk Assessment |
DCL-09-079, Request to Withdraw the Diablo Canyon Power Plant License Renewal Application | 7 March 2018 | Request to Withdraw the Diablo Canyon Power Plant License Renewal Application | License Renewal |
Press Release-18-008, NRC Issues Annual Assessments for Nation'S Nuclear Plants | 5 March 2018 | Press Release-18-008: NRC Issues Annual Assessments for Nation'S Nuclear Plants | |
IR 05000275/2017006 | 1 March 2018 | Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017006 and 05000323/2017006) | Open Phase Condition |
ML18061A041 | 1 March 2018 | Notification of NRC Design Bases Assurance Inspection (Programs) and (05000275/2018010 05000323/2018010) and Initial Request for Information | Commercial Grade Dedication |
ML18064A356 | 27 February 2018 | DC 2018-01 Post Examination Analysis | |
ML18053A874 | 22 February 2018 | Single Positive Test Form Collected on 08/08/2017 | |
ML18053A864 | 22 February 2018 | Annual Fatigue Report Form for 2017 | |
ML18053A865 | 22 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
ML18053A866 | 22 February 2018 | Single Positive Test Form Collected on 03/01/2017 | |
ML18053A867 | 22 February 2018 | Single Positive Test Form Collected on 03/06/2017 | |
ML18053A868 | 22 February 2018 | Single Positive Test Form Collected on 03/09/2017 | |
ML18053A869 | 22 February 2018 | Single Positive Test Form Collected on 03/20/2017 | |
ML18053A870 | 22 February 2018 | Single Positive Test Form Collected on 03/21/2017 | |
ML18053A871 | 22 February 2018 | Single Positive Test Form Collected on 04/03/2017 | |
ML18053A872 | 22 February 2018 | Single Positive Test Form Collected on 04/11/2017 | |
ML18053A873 | 22 February 2018 | Single Positive Test Form Collected on 04/11/2017 | |
ML18053A875 | 22 February 2018 | Single Positive Test Form Collected on 11/07/2017 | |
ML18081A964 | 9 February 2018 | DC 2018-01 Public Forms | |
ML18064A357 | 9 February 2018 | DC-2018-01 Draft Written Examination | Boric Acid Shutdown Margin Time Critical Operator Action Earthquake Fuel cladding Offsite Circuit Power change |
ML18064A355 | 9 February 2018 | DC 2018-01 Final Written Examination | Shutdown Margin Time Critical Operator Action Earthquake Fuel cladding Offsite Circuit Power change Downpower |
ML18064A354 | 9 February 2018 | DC 2018-01 Final Outlines | Post Accident Monitoring Time Critical Operator Action Offsite Circuit |
ML18064A353 | 9 February 2018 | DC 2018-01 Final Operating Test | Boric Acid High Radiation Area Grab sample Post Accident Monitoring Operating Basis Earthquake Job Performance Measure Time Critical Operator Action Earthquake Deep Dose Equivalent EVT-1 Offsite Circuit Downpower Coast down |
ML18064A352 | 9 February 2018 | DC 2018-01 Draft Written Examination Comments | Power change |
ML18064A351 | 9 February 2018 | DC 2018-01 Draft Outlines | Post Accident Monitoring Time Critical Operator Action Offsite Circuit |
ML18064A350 | 9 February 2018 | DC 2018-01 Draft Outline Comments | |
ML18064A349 | 9 February 2018 | DC 2018-01 Draft Operating Test | Boric Acid High Radiation Area Grab sample Post Accident Monitoring Operating Basis Earthquake Job Performance Measure Time Critical Operator Action Earthquake Deep Dose Equivalent EVT-1 Offsite Circuit Downpower Coast down |
ML18064A348 | 9 February 2018 | DC 2018-01 Draft Operating Test Comments | |
IR 05000275/2017004 | 6 February 2018 | NRC Integrated Inspection Report 05000275/2017004 and 05000323/2017004 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Downpower Siren |
DCL-18-004, Submittal of Errata for the Mitigating Strategies Assessment (MSA) for Flooding Report | 1 February 2018 | Submittal of Errata for the Mitigating Strategies Assessment (MSA) for Flooding Report | |
ML18023A715 | 26 January 2018 | Residual Heat Removal Suction Weld Joint Flaw Evaluation (CAC No. MG0140; EPID L-2017-LRO-0026) | |
IR 05000275/2017007 | 24 January 2018 | DCPP - Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/ Multi Unit Dose Assessment Plans - Inspection Report (05000275/2017007 and 050003 | FLEX Spent Fuel Pool Instrumentation |
IR 05000275/2017040 | 23 January 2018 | NRC Supplemental Inspection Report and Assessment Follow-Up Letter; 05000275/2017040 and 05000323/2017040 | |
ML18019A016 | 19 January 2018 | NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 | |
ML18022A044 | 18 January 2018 | Fourth Joint Status Report (DC Cir.)(Case No. 16-1004) 1-18-18 | |
IR 05000275/2017501 | 17 January 2018 | NRC Emergency Preparedness Annual Inspection Report 05000275/2017501 and 05000323/2017501 | |
ML18005A422 | 10 January 2018 | Correction to Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation | |
ML18009A985 | 8 January 2018 | Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 | Generic Fundamentals Examination |