Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
DCL-17-022, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 231 March 2017Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2License Renewal
Fuel cladding
Fire Watch
Scaffolding
ML17089A57630 March 2017NRR E-mail Capture - Acceptance Review - Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2, Diablo Canyon Power Plant, Unit 2 (CAC Nos. MF9386 Through MF9390)
DCL-17-021, Withdrawal of License Amendment Request 16-03, Application to Adopt NEI 94-01 Revision 2-A. Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J30 March 2017Withdrawal of License Amendment Request 16-03, Application to Adopt NEI 94-01 Revision 2-A. Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J
DCL-17-030, 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP)29 March 20172016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP)
IR 05000275/201540529 March 2017NRC Security Inspection Report 05000275/2015405 and 05000323/2015405 (Letter)
ML17102A52427 March 2017OEDO-16-00436 - David Lochbaum, Union of Concerned Scientists, Letter with Comments 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
IR 05000275/201740320 March 2017NRC Security Inspection Report 05000275/2017403 and 05000323/2017403Affidavit
ML17031A25915 March 2017OEDO-16-00436 - Licensee'S Letter - David Lochbaum, Union of Concerned Scientist Letter 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9
ML17031A26615 March 2017OEDO-16-00436 - Proposed Directors Decision - David Lochbaum Union of Concerned Scientists, Letter 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9
ML17031A26415 March 2017OEDO-16-00436 - Petitioner Letter - David Lochbaum Union of Concerned Scientists, Letter 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9
ML17037D2679 March 2017Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternate Depth Sizing Criteria for the Fourth Inservice InspectionIncorporated by reference
DM weld
DCL-17-017, ASME Section XI Inservice Inspection Relief Requests NDE-RPV 10 Year 2R198 March 2017ASME Section XI Inservice Inspection Relief Requests NDE-RPV 10 Year 2R19
CAC:MF93868 March 2017
ML17039A8932 March 2017Letter to Those on the Attached List - Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Batch 1)
DCL-17-016, Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Implementing Procedures Update1 March 2017Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Implementing Procedures Update
IR 05000275/20164021 March 2017Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Nuclear Regulatory Commission Physical Security Inspection Report Number 05000275/2016402 and 05000323/2016402) - Letter Only
IR 05000275/20160061 March 2017Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016006 and 05000323/2016006)Significance Determination Process
Spent Fuel Pool Instrumentation
IR 05000275/201601028 February 2017NRC Denial of Pacific Gas and Electric Company Appeal of Diablo Canyon Power Plant - Final Significance Determination of a White Finding; NRC Inspection Report 05000275/2016010 and 05000323/2016010Probabilistic Risk Assessment
Significance Determination Process
DCL-2017-511, Submittal of 2016 Annual Discharge Self-Monitoring Report28 February 2017Submittal of 2016 Annual Discharge Self-Monitoring ReportGrab sample
ML17011A20528 February 2017SRM-M150521A - Petitioner Letter Friends of the Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
ML17011A20628 February 2017SRM-M150521A-2 - Licensee Letter Friends of Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14 (CAC Nos. MF6443 and MF6444Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
ML17011A20428 February 2017SRM-M150521A - Proposed Director'S Decision Friends of Earth 2.206 Petition Based on Commission Memorandum and Order CLI-15-14Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Operability Assessment
ML17018A34123 February 2017Issuance of Amendments Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System,Surveillance Frequency Control Program
ML17047A54416 February 2017Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedures UpdateFuel cladding
ML17046A21415 February 2017Single Positive Test Form Collected on 10/06/2016
ML17046A21515 February 2017Single Positive Test Form Collected on 10/31/2016
ML17046A21615 February 2017Single Positive Test Form Collected on 11/22/2016
ML17046A20915 February 2017Annual Report Form for Drug and Alcohol Tests for 2016
ML17046A21215 February 2017Single Positive Test Form Collected on 04/26/2016
ML17046A21715 February 2017Single Positive Test Form Collected on 12/19/2016
ML17046A20815 February 2017Annual Fatigue Report Form for 2016
ML17046A21315 February 2017Single Positive Test Form Collected on 04/18/2016
ML17046A21015 February 2017Single Positive Test Form Collected on 03/22/2016
ML17046A21115 February 2017Single Positive Test Form Collected on 3/31/2016
ML17046A21915 February 2017Single Positive Test Form Collected on 12/20/2016
ML17276B0958 February 2017FOIA/PA-2017-0395, Request for Feb 2008 Secy Paper Related to PG&E Diablo Canyon ISFSI Docket 72-26-ISFSI
IR 05000275/20160048 February 2017NRC Integrated Inspection Report 05000275/2016004 and 05000323/2016004 and Exercise of Enforcement DiscretionInternal Flooding
Enforcement Discretion
Temporary Modification
Cyber Security
Functionality Assessment
Finite Element Analysis
Significance Determination Process
Operability Determination
Fire Protection Program
Operability Assessment
Siren
ML17039B0808 February 2017Response to Notice of Violation - (NRC Inspection Report 05000275/2016010 and 05000323/2016010)
ML17037D1236 February 2017Notification of Inspection (NRC Inspection Report 05000275/2017002; 05000323/2017002) and Request for Information
ML17031A38531 January 2017NRR E-mail Capture - Issuance of License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2
ML16314B65731 January 2017Undated Testimony of Roland Finston Concerning Contentions 4A, 4C, and 4D
DCL-2017-501, Diablo Power Plant - 2016 Annual Sea Turtle Report27 January 2017Diablo Power Plant - 2016 Annual Sea Turtle Report
DCL-17-009, Appeal of Final Significance Determination Process Findings EA-16-16826 January 2017Appeal of Final Significance Determination Process Findings EA-16-168Significance Determination Process
Overtravel
Preliminary White Finding
DCL-17-010, Reply to a Notice of Violation; EA-16-16826 January 2017Reply to a Notice of Violation; EA-16-168Significance Determination Process
ML17025A29824 January 2017NRR E-mail Capture - (External_Sender) Issuance of License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2
ML17024A27223 January 2017Joint Status Report (DC Cir. Case No. 16-1004) 01/23/2017
DCL-2017-500, Discharge Monitoring Report for Fourth Quarter 201620 January 2017Discharge Monitoring Report for Fourth Quarter 2016
ML17026A41420 January 2017C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling
ML17031A13519 January 2017FEMA - Submittal of Final After Action Report for the Plume Phase Exercise (Ppx) Held in the Counties of San Luis Obispo and Santa Barbara on November 2, 2016, for the Diablo Canyon Power Plant (DCPP)