NRC 2016-0011, Core Operating Limits Report (COLR) Cycle 37 (U1C37)29 March 2016Core Operating Limits Report (COLR) Cycle 37 (U1C37)Shutdown Margin
L-2016-062, NextEra Energy Nuclear Property Insurance - 10 CFR 50.54(w)(3)28 March 2016NextEra Energy Nuclear Property Insurance - 10 CFR 50.54(w)(3)
ML16088A20428 March 2016Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template)Decommissioning Funding Plan
ML16088A20528 March 2016Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
ML16085A14124 March 2016E-Mail: NextEra Energy Point Beach Nuclear Power Plant, Units 1 and 2 - Request for Information for Upcoming NRC Triennial Heat Sink Performance Inspection Report 05000266/2016002; 05000301/2016002 (Jjc)Ultimate heat sink
Temporary Modification
Flow Induced Vibration
NRC 2016-0010, Submittal of 10 CFR 50.46 Annual Report22 March 2016Submittal of 10 CFR 50.46 Annual Report
ML16063A05822 March 2016Approval of Relief Request 2-RR-11; Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld InspectionVT-2
Liquid penetrant
DM weld
ML16082A03021 March 2016NRR E-mail Capture - LIC-109 Acceptance Review - Point Beach Units 1 and 2 - License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program - MF7352/7353
NRC 2016-0007, Open Phase Condition Initiative Commitment Change14 March 2016Open Phase Condition Initiative Commitment ChangeOpen Phase Condition
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
NRC-2016-0009, License Amendment Request 2821 Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief Valves10 March 2016License Amendment Request 2821 Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-operated Relief ValvesSurveillance Frequency Control Program
CAC:MF744010 March 2016
ML16035A5099 March 2016Correction of Typographical Error in Safety Evaluation Associated with License Amendment Nos. 238 and 242
IR 05000266/20150062 March 2016Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Inspection Report 05000266/2015006 and 05000301/2015006)Spent Fuel Pool Instrumentation
NRC 2016-0008, Response to Request for Additional Information on NFPA 805 License Amendment Request 27122 February 2016Response to Request for Additional Information on NFPA 805 License Amendment Request 271
CAC:MF237222 February 2016
ML16053A27222 February 2016NRR E-mail Capture - LIC-109 Acceptance Review - Point Beach Nuclear Plant Units 1 and 2 - License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation - MF7261/7262
NRC 2016-0001, Screening and High Confidence Low Probability of Failure (HCLPF) Results for Inaccessible and Late Addition Components16 February 2016Screening and High Confidence Low Probability of Failure (HCLPF) Results for Inaccessible and Late Addition ComponentsFukushima Dai-Ichi
ML16021A16116 February 2016Request for Withholding Information from Public Disclosure for Point Beach Nuclear Plant, Unit 2Dissimilar Metal Weld
ML16046A01215 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
CAC:MF735212 February 2016
NRC 2016-0002, License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program12 February 2016License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing ProgramSafe Shutdown
Unanalyzed Condition
Cyber Security
Fire Protection Program
NRC 2016-0006, License Amendment Request 277. Revision to Staff Augmentation Times in the Emergency Plan, Supplemental Response to Request for Additional Information No. 5 -Correction to Table 5.19 February 2016License Amendment Request 277. Revision to Staff Augmentation Times in the Emergency Plan, Supplemental Response to Request for Additional Information No. 5 -Correction to Table 5.1
ML16040A1809 February 2016Annual Fatigue Report Form for 2015
CAC:MF63529 February 2016
ML16039A2693 February 2016Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna
IR 05000266/20155013 February 2016Ltr. 02/03/16 Point Beach Nuclear Plant, Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report No. 05000266/2015501; 05000301/2015501. (Gph)
IR 05000266/201500427 January 2016NRC Integrated Inspection Report 05000266/2015004; 05000301/2015004, October 1, 2015 Through December 31, 2015Safe Shutdown
Boric Acid
Non-Destructive Examination
Mission time
Water Inventory Control
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Operability Determination
Through Wall Leak
Fire Protection Program
Operability Assessment
NRC 2016-0003, License Amendment Request 277, Revision to Staff Augmentation Times in the Plant Emergency Plan, Supplemental Response to Request for Additional Information No. 526 January 2016License Amendment Request 277, Revision to Staff Augmentation Times in the Plant Emergency Plan, Supplemental Response to Request for Additional Information No. 5
NRC 2016-0004, Refueling Outage U2R34 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations26 January 2016Refueling Outage U2R34 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations
ML16025A04125 January 2016Ltr. 01/25/16 Point Beach Nuclear Plant, Unit 1 - Notification of NRC Inspection and Request for Information (Txb)Boric Acid
Non-Destructive Examination
Dissimilar Metal Weld
Scaffolding
ML16022A00420 January 2016NRR E-mail Capture - Request for Additional Information - Point Beach Nuclear Plant, Units 1 and 2 - NFPA 805 LAR - MF2372 and MF2373
NRC 2015-0075, License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation15 January 2016License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building VentilationProbabilistic Risk Assessment
TAC:MF726115 January 2016
ML16042A1757 January 2016Certificate of Liability Insurance
ML15358A1916 January 2016Branch Chief Reassignment for Plant Licensing Branch III-1