Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA-16-0010, Duke Energy - Submittal of Onsite Property Insurance Coverage | 31 March 2016 | Duke Energy - Submittal of Onsite Property Insurance Coverage | |
RA-16-0015, Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 31 March 2016 | Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
TAC:MF7195 | 30 March 2016 | ||
ML16091A006 | 30 March 2016 | NRR E-mail Capture - Shearon Harris Nuclear Power Plant - Request for Additional Information Related to LAR - Main Steam Safety Valve Lift Setting Tolerance Change | |
ML16056A063 | 25 March 2016 | OEDO-16-00078 - Response Letter to Michael Mulligan 2.206 for Runaway Main Stream Safety Valve (MSSV) Tech Spec Lift Setting Failures at Indian Point Since 2009 | |
ML16076A434 | 16 March 2016 | NRR E-mail Capture - Harris/Robinson Acceptance Review Draft Supplemental Information Request - LAR to Adopt Methodology Reports DPC-NF-2010 Revision 3 and DPC-NE-2011-P Revision 2 (MF7337, MF7338) | Incorporated by reference |
ML16074A312 | 14 March 2016 | NRR E-mail Capture - Accepted for Review of License Amendment Request to Change in Corporate Form Duke Energy Progress from Inc to LLC (CAC #MF7342, MF7343, MF7344 and MF7345) | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16034A524 | 11 March 2016 | Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities | |
ML16049A630 | 8 March 2016 | Issuance of Amendments Revising Technical Specifications for Methodology Report DPC-NE-2005-P Revision 5, Thermal-Hydraulic Statistical Core Design Methodology | Shutdown Margin Anticipated operational occurrence Post Accident Monitoring Nondestructive Examination |
IR 05000400/2015006 | 2 March 2016 | Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2015006 | Spent Fuel Pool Instrumentation |
ML16040A231 | 29 February 2016 | Request for Withholding Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit 2 | |
HNP-16-017, Transmittal of Summary of a 10 CFR 50.54(q) Evaluation | 29 February 2016 | Transmittal of Summary of a 10 CFR 50.54(q) Evaluation | |
ML16054A108 | 23 February 2016 | Single Positive Test Form Collected on 03/04/2015 | |
ML16054A103 | 23 February 2016 | Single Positive Test Form Collected on 02/04/2015 | |
ML16054A114 | 23 February 2016 | Single Positive Test Form Collected on 10/09/2015 | |
ML16054A104 | 23 February 2016 | Single Positive Test Form Collected on 02/03/2015 | |
ML16054A111 | 23 February 2016 | Single Positive Test Form Collected on 03/31/2015 | |
HNP-16-014, Submittal of Annual Report in Accordance with Technical Specification 6.9.1.2 | 23 February 2016 | Submittal of Annual Report in Accordance with Technical Specification 6.9.1.2 | |
ML16054A102 | 23 February 2016 | Single Positive Test Form Collected on 01/09/2015 | |
ML16054A101 | 23 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
ML16054A110 | 23 February 2016 | Single Positive Test Form Collected on 03/23/2015 | |
ML16054A109 | 23 February 2016 | Single Positive Test Form Collected on 03/23/2015 | |
ML16054A121 | 23 February 2016 | Annual Fatigue Report Form for 2015 | |
ML16054A107 | 23 February 2016 | Single Positive Test Form Collected on 02/24/2015 | |
ML16054A105 | 23 February 2016 | Single Positive Test Form Collected on 02/24/2015 | |
ML16054A112 | 23 February 2016 | Single Positive Test Form Collected on 08/12/2015 | |
ML16054A113 | 23 February 2016 | Single Positive Test Form Collected on 08/25/2015 | |
ML16056A014 | 19 February 2016 | Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance | |
ML16054A543 | 19 February 2016 | Notification of Licensed Operator Initial Examination 05000400/2016301 | |
ML15364A544 | 18 February 2016 | Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific Licensees | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
HNP-16-008, Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement | 16 February 2016 | Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement | |
RA-16-0009, Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 2 | 15 February 2016 | Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 2 | Health Physics Network Earthquake |
ML16035A480 | 12 February 2016 | Jsc Meeting Summary Attachment | |
ML16028A197 | 8 February 2016 | Request for Additional Information Regarding License Amendment Request for a Temporary Change to Technical Specifications for the 'A' Emergency Service Water Pump Replacement | Safe Shutdown Mission time Internal Flooding Large early release frequency Maintenance Rule Program |
HNP-16-011, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled Program | 5 February 2016 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled Program | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Internal Flooding Probabilistic Risk Assessment Fukushima Dai-Ichi Surveillance Frequency Control Program Offsite Circuit Fire Protection Program |
ML16027A143 | 3 February 2016 | Review of the Steam Generator Tube Inservice Inspection Report for Refueling Outage 19 | |
RA-16-0003, Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report... | 3 February 2016 | Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report... | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Nondestructive Examination Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ML16053A093 | 1 February 2016 | Certificate of Liability Insurance | |
CAC:MF7112 | 1 February 2016 | ||
CAC:MF7342 | 1 February 2016 | ||
ML16012A132 | 1 February 2016 | Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit No. 2 and Shearon Harris Nuclear Power Plant, Unit 1 | |
RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress | 1 February 2016 | License Amendment Request, Change in Corporate Form of Duke Energy Progress | |
RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 | 1 February 2016 | Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 | |
ML16032A405 | 28 January 2016 | NRR E-mail Capture - (External_Sender) Common EOF Pre-Submittal | Cyber Security |
HNP-16-004, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of Nuclear Energy Institute 99-01, Development of Emergency.... | 28 January 2016 | Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of Nuclear Energy Institute 99-01, Development of Emergency.... | Safe Shutdown Boric Acid Time of Discovery High winds Reactor Vessel Water Level Packing leak Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
IR 05000400/2015004 | 27 January 2016 | NRC Integrated Inspection Report 05000400/2015004, October 1, 2015 Through December 31, 2015 | Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Downpower |
ML16025A183 | 25 January 2016 | Shearon Harris Nuclear Power Plant - US Nuclear Regulatory Commission Security Inspection Report 05000400/2016403 | |
ML16020A367 | 20 January 2016 | NRR E-mail Capture - Accepted for Review of License Amendment Request to Revises the as-found Lift Setting Tolerance for Main Steam Line Code Safety Valves (Mssvs) in TS 3.7.1.1 at Harris | |
RA-15-0050, Implementation of a Duke Energy Common Quality Assurance Topical Report | 19 January 2016 | Implementation of a Duke Energy Common Quality Assurance Topical Report |