Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-16-0010, Duke Energy - Submittal of Onsite Property Insurance Coverage31 March 2016Duke Energy - Submittal of Onsite Property Insurance Coverage
RA-16-0015, Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums31 March 2016Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
TAC:MF719530 March 2016
ML16091A00630 March 2016NRR E-mail Capture - Shearon Harris Nuclear Power Plant - Request for Additional Information Related to LAR - Main Steam Safety Valve Lift Setting Tolerance Change
ML16056A06325 March 2016OEDO-16-00078 - Response Letter to Michael Mulligan 2.206 for Runaway Main Stream Safety Valve (MSSV) Tech Spec Lift Setting Failures at Indian Point Since 2009
ML16076A43416 March 2016NRR E-mail Capture - Harris/Robinson Acceptance Review Draft Supplemental Information Request - LAR to Adopt Methodology Reports DPC-NF-2010 Revision 3 and DPC-NE-2011-P Revision 2 (MF7337, MF7338)Incorporated by reference
ML16074A31214 March 2016NRR E-mail Capture - Accepted for Review of License Amendment Request to Change in Corporate Form Duke Energy Progress from Inc to LLC (CAC #MF7342, MF7343, MF7344 and MF7345)
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16034A52411 March 2016Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities
ML16049A6308 March 2016Issuance of Amendments Revising Technical Specifications for Methodology Report DPC-NE-2005-P Revision 5, Thermal-Hydraulic Statistical Core Design MethodologyShutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
IR 05000400/20150062 March 2016Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2015006Spent Fuel Pool Instrumentation
ML16040A23129 February 2016Request for Withholding Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit 2
HNP-16-017, Transmittal of Summary of a 10 CFR 50.54(q) Evaluation29 February 2016Transmittal of Summary of a 10 CFR 50.54(q) Evaluation
ML16054A10823 February 2016Single Positive Test Form Collected on 03/04/2015
ML16054A10323 February 2016Single Positive Test Form Collected on 02/04/2015
ML16054A11423 February 2016Single Positive Test Form Collected on 10/09/2015
ML16054A10423 February 2016Single Positive Test Form Collected on 02/03/2015
ML16054A11123 February 2016Single Positive Test Form Collected on 03/31/2015
HNP-16-014, Submittal of Annual Report in Accordance with Technical Specification 6.9.1.223 February 2016Submittal of Annual Report in Accordance with Technical Specification 6.9.1.2
ML16054A10223 February 2016Single Positive Test Form Collected on 01/09/2015
ML16054A10123 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
ML16054A11023 February 2016Single Positive Test Form Collected on 03/23/2015
ML16054A10923 February 2016Single Positive Test Form Collected on 03/23/2015
ML16054A12123 February 2016Annual Fatigue Report Form for 2015
ML16054A10723 February 2016Single Positive Test Form Collected on 02/24/2015
ML16054A10523 February 2016Single Positive Test Form Collected on 02/24/2015
ML16054A11223 February 2016Single Positive Test Form Collected on 08/12/2015
ML16054A11323 February 2016Single Positive Test Form Collected on 08/25/2015
ML16056A01419 February 2016Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance
ML16054A54319 February 2016Notification of Licensed Operator Initial Examination 05000400/2016301
ML15364A54418 February 2016Staff Review of High Frequency Confirmation Associated with Reevaluated Seismic Hazard Implementating Near-Term Task Force Recommendation 2.1 Seismic for Specific LicenseesSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
HNP-16-008, Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement16 February 2016Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement
RA-16-0009, Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 215 February 2016Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 2Health Physics Network
Earthquake
ML16035A48012 February 2016Jsc Meeting Summary Attachment
ML16028A1978 February 2016Request for Additional Information Regarding License Amendment Request for a Temporary Change to Technical Specifications for the 'A' Emergency Service Water Pump ReplacementSafe Shutdown
Mission time
Internal Flooding
Large early release frequency
Maintenance Rule Program
HNP-16-011, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled Program5 February 2016Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled ProgramSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Offsite Circuit
Fire Protection Program
ML16027A1433 February 2016Review of the Steam Generator Tube Inservice Inspection Report for Refueling Outage 19
RA-16-0003, Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report...3 February 2016Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report...Shutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
ML16053A0931 February 2016Certificate of Liability Insurance
CAC:MF71121 February 2016
CAC:MF73421 February 2016
ML16012A1321 February 2016Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit No. 2 and Shearon Harris Nuclear Power Plant, Unit 1
RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress1 February 2016License Amendment Request, Change in Corporate Form of Duke Energy Progress
RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 51 February 2016Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5
ML16032A40528 January 2016NRR E-mail Capture - (External_Sender) Common EOF Pre-SubmittalCyber Security
HNP-16-004, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of Nuclear Energy Institute 99-01, Development of Emergency....28 January 2016Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Scheme to One Based on Revision 6 of Nuclear Energy Institute 99-01, Development of Emergency....Safe Shutdown
Boric Acid
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
IR 05000400/201500427 January 2016NRC Integrated Inspection Report 05000400/2015004, October 1, 2015 Through December 31, 2015Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Downpower
ML16025A18325 January 2016Shearon Harris Nuclear Power Plant - US Nuclear Regulatory Commission Security Inspection Report 05000400/2016403
ML16020A36720 January 2016NRR E-mail Capture - Accepted for Review of License Amendment Request to Revises the as-found Lift Setting Tolerance for Main Steam Line Code Safety Valves (Mssvs) in TS 3.7.1.1 at Harris
RA-15-0050, Implementation of a Duke Energy Common Quality Assurance Topical Report19 January 2016Implementation of a Duke Energy Common Quality Assurance Topical Report