Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-16-0010, Duke Energy - Submittal of Onsite Property Insurance Coverage31 March 2016Duke Energy - Submittal of Onsite Property Insurance Coverage
RA-16-0015, Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums31 March 2016Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
ML16082A39922 March 2016Brunswick Steam Electric Plant, Notification of Inspection and Request for Information
IR 05000325/201640318 March 2016Brunswick Steam Electric Plant, U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000324/2016403 And 05000325/2016403Affidavit
ML16075A44718 March 2016Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations -Publication Date March 29, 2016Cyber Security
Surveillance Frequency Control Program
Exemption Request
Fuel cladding
ML16074A31214 March 2016NRR E-mail Capture - Accepted for Review of License Amendment Request to Change in Corporate Form Duke Energy Progress from Inc to LLC (CAC #MF7342, MF7343, MF7344 and MF7345)
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16034A52411 March 2016Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities
BSEP 16-0018, Proposed Alternative for ASME Code, Section XI Inservice Inspection Requirements (Relief Request ISl-06)10 March 2016Proposed Alternative for ASME Code, Section XI Inservice Inspection Requirements (Relief Request ISl-06)VT-2
CAC:MF74279 March 2016
ML16069A3419 March 2016Notice of Enforcement Discretion (NOED) for Brunswick Steam Electric Plant Unit 2 (CAC No. MF7427, NOED No. 16-2-001)Enforcement Discretion
Offsite Circuit
BSEP 16-0020, Request for Notice of Enforcement Discretion (Noed), Limiting Condition for Operation (LCO) 3.0.3, Per Technical Specification 3.8.1, AC Sources - Operating7 March 2016Request for Notice of Enforcement Discretion (Noed), Limiting Condition for Operation (LCO) 3.0.3, Per Technical Specification 3.8.1, AC Sources - OperatingHigh winds
Internal Flooding
Enforcement Discretion
FLEX
Pandemic
Offsite Circuit
Hourly Fire Watch
ML16061A3012 March 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016Safe Shutdown Earthquake
Cyber Security
Surveillance Frequency Control Program
Process Control Program
Time Critical Operator Action
Exemption Request
Fuel cladding
ML16062A0832 March 2016Annual Assessment Letter for Brunswick Steam Electric PlantSpent Fuel Pool Instrumentation
ML16062A0061 March 2016NRR E-mail Capture - Accepted of License Amendment Request risk-informed Justification for Relocation of Specific Surveillance Frequency Req to a Licensee Controlled Program (CAC #MF7206 and MF7207)
CAC:MF38241 March 2016
ML16041A4351 March 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task ForceSafe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
ML16049A22829 February 2016Correction to Signature for License Amendment Nos. 268 and 296 Regarding Emergency Action Level Scheme UpgradeFire Protection Program
BSEP 16-0007, Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)24 February 2016Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
BSEP 16-0006, Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)24 February 2016Sixth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Operator Manual Action
FLEX
Spent Fuel Pool Instrumentation
ML16054A06923 February 2016Single Positive Test Form Collected on 07/14/2015
ML16054A06723 February 2016Single Positive Test Form Collected on 07/07/2015
ML16054A05523 February 2016Single Positive Test Form Collected on 02/24/2015
ML16054A06523 February 2016Single Positive Test Form Collected on 04/20/2015
ML16054A06223 February 2016Single Positive Test Form Collected on 03/13/2015
ML16054A05323 February 2016Single Positive Test Form Collected on 02/09/2015
ML16054A07023 February 2016Single Positive Test Form Collected on 07/13/2015
ML16054A07123 February 2016Single Positive Test Form Collected on 09/30/2015
ML16054A04823 February 2016Single Positive Test Form Collected on 02/04/2015
ML16054A07223 February 2016Single Positive Test Form Collected on 11/18/2015
ML16054A06623 February 2016Single Positive Test Form Collected on 06/16/2015
ML16054A04523 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
ML16054A06423 February 2016Single Positive Test Form Collected on 04/15/2015
ML16054A05723 February 2016Single Positive Test Form Collected on 02/25/2015
ML16054A04723 February 2016Single Positive Test Form Collected on 01/20/2015
ML16054A05023 February 2016Single Positive Test Form Collected on 01/29/2015
ML16054A05123 February 2016Single Positive Test Form Collected on 02/05/2015
ML16054A05223 February 2016Single Positive Test Form Collected on 02/05/2015
ML16054A05423 February 2016Single Positive Test Form Collected on 02/11/2015
ML16054A04923 February 2016Single Positive Test Form Collected on 02/04/2015
ML16054A04623 February 2016Single Positive Test Form Collected on 01/12/2015
ML16054A06023 February 2016Single Positive Test Form Collected on 03/01/2015
ML16054A07423 February 2016Annual Fatigue Report Form for 2015
ML16056A01419 February 2016Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance
IR 05000324/201530119 February 2016NRC Examination Report 05000325/2015301 and 05000324/2015301, December 17, 2015 and December 15, 2015High Radiation Area
Locked High Radiation Area
Power change
RA-16-0009, Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 215 February 2016Duke Energy - Transmittal of Emergency Plan Implementing ProceduAD-EP-ALL-0802, Revision 2Health Physics Network
Earthquake
ML16019A0299 February 2016Issuance of Amendments Regarding the Adoption of Topical Report ANP-10298P-A, Revision 1Anticipated operational occurrence
Post Accident Monitoring
Minimum Critical Power Ratio
Fuel cladding
Fire Protection Program
CAC:MF58514 February 2016
ML16034A5084 February 2016Audit Report; Brunswick Steam Electric Plant, Units 1 & 2 Nuclear Facility Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 (TAC No. MF5852)
ML16039A2693 February 2016Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna