Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16088A205 | 28 March 2016 | Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
ML16088A204 | 28 March 2016 | Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) | Decommissioning Funding Plan |
ML16082A542 | 25 March 2016 | Backfit Review Panel Recommendation Regarding Exelon Appeal of Backfit Affecting Braidwood and Byron Stations Regarding Compliance with 10 CFR 50.34(b), GDC 15, GDC 21, GDC 29, and the Licensing Basis | Anticipated operational occurrence Backfit |
RIS 2016-02, Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators | 23 March 2016 | Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators | Backfit |
RS-16-067, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | 22 March 2016 | Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | Boric Acid |
TAC:MF7370 | 22 March 2016 | ||
ML16077A156 | 22 March 2016 | Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards | |
ML16074A323 | 21 March 2016 | Forthcoming Meeting with Exelon Nuclear | |
ML16075A329 | 16 March 2016 | OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations | Anticipated operational occurrence Enforcement Discretion Probabilistic Risk Assessment Significance Determination Process Open Phase Condition Risk-Informed Steering Committee Fuel cladding Generic Issues Program Backfit |
ML16096A161 | 15 March 2016 | Backfit Review Panel Meeting Minutes - March 15, 2016 | Backfit |
ML16070A362 | 15 March 2016 | 03/07/2016 Summary of Public Meeting Between U.S. Nuclear Regulatory Commission Staff and Exelon Generation Company, LLC to Discuss an Appeal of a Compliance Backfit | Backfit |
RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | 15 March 2016 | Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | Boric Acid |
RS-16-061, Braidwood, Units 1 and 2 - Transmittal of Exelon Nuclear Radiological Emergency Plan Revision | 14 March 2016 | Braidwood, Units 1 and 2 - Transmittal of Exelon Nuclear Radiological Emergency Plan Revision | |
RS-16-061, EP-AA-1001, Addendum 3, Revision 1, Emergency Action Levels for Braidwood Station. | 14 March 2016 | EP-AA-1001, Addendum 3, Revision 1, Emergency Action Levels for Braidwood Station. | Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Nuclear Accident Reporting System Earthquake Fuel cladding Pressure Boundary Leakage |
ML16074A415 | 14 March 2016 | Transmittal of Exelon Nuclear Radiological Emergency Plan Revision | |
ML16070A364 | 10 March 2016 | Transcript re Public Meeting to Discuss Exelon Generating Company LLC's Appeal of Compliance Backfit Affecting Braidwood and Byron Generating Stations Held on March 7, 2016 Pages 1-80 | Backfit |
IR 05000456/2016403 | 10 March 2016 | NRC Security Baseline Inspection Report 05000456/2016403; 05000457/2016403 (Cover Letter Only) | |
ML16062A422 | 2 March 2016 | Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal | Anticipated operational occurrence Backfit Power Uprate |
ML16070A027 | 2 March 2016 | NRR E-mail Capture - Preliminary Additional RAIs Related to the Request for Exemption Regarding MSIV Bypass Valves | |
IR 05000456/2015006 | 2 March 2016 | Annual Assessment Letter for Braidwood Station Units 1 and 2 (Inspection Report 05000456/2015006 and 05000457/2015006) | Spent Fuel Pool Instrumentation |
RS-16-008, Response to NRC Regulatory Issue Summary 2015-16, Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees. | 29 February 2016 | Response to NRC Regulatory Issue Summary 2015-16, Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees. | Water Inventory Control Cyber Security Surveillance Frequency Control Program TORMIS Exemption Request |
RS-16-050, Submittal of Exelon Fitness for Duty Performance Data Reports-Annual 2015 | 26 February 2016 | Submittal of Exelon Fitness for Duty Performance Data Reports-Annual 2015 | Fitness for Duty |
RS-16-020, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 26 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX Spent Fuel Pool Instrumentation |
ML16057A790 | 26 February 2016 | Annual Fatigue Report Form for 2015 | |
CAC:MF7239 | 25 February 2016 | ||
ML16032A393 | 25 February 2016 | Use of Encryption Software for Electronic Transmission of Safeguards Information | |
ML16057A099 | 24 February 2016 | NRR E-mail Capture - (External_Sender) Fwd: 1 of 2: Final Report: Five Year Post-construction Monitoring of the Unionid Community Near Braidwood Station Kankakee River Discharge | |
CAC:MF7403 | 23 February 2016 | ||
RS-16-034, License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding | 23 February 2016 | License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding | Shutdown Margin Exemption Request Fuel cladding |
ML16014A691 | 22 February 2016 | Request for Additional Information Related to the License Amendment Request to Increase the Ultimate Heat Sink Temperature Limit (CAC Nos. MF4671 and MF4672) | Ultimate heat sink |
ML16053A509 | 22 February 2016 | NRR E-mail Capture - Exelon Fleet - Proposed Alternative to Use Code Case N-513-4 (CAC Nos. MF7301-MF7322) | |
ML16056A014 | 19 February 2016 | Marsh USA, Inc. - 2016 Nuclear Liability Certificates of Insurance | |
ML16039A338 | 18 February 2016 | Request for Withholding Information from Public Disclosure for Byron Station, Unit Nos. 1 and 2, and Braidwood Station, Units 1 and 2 | |
TAC:MF6715 | 18 February 2016 | ||
RA-16-012, Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants | 17 February 2016 | Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants | |
RS-16-049, Supplemental Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. | 12 February 2016 | Supplemental Information Regarding Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink. | Ultimate heat sink |
ML16040A218 | 11 February 2016 | January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing Managers | Probabilistic Risk Assessment |
RS-16-045, Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | 11 February 2016 | Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds | Boric Acid Liquid penetrant |
ML16042A243 | 11 February 2016 | Regulatory Commitment Change Summary Report | Surveillance Frequency Control Program Scaffolding |
CAC:MF7162 | 11 February 2016 | ||
ML16035A176 | 11 February 2016 | Summary of January 7, 2016, Meeting with Exelon Generation Company, LLC on It'S Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response (CAC Nos. MF7162 - MF7183) | |
ML16041A144 | 10 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
RA-16-007, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90 | 8 February 2016 | Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90 | Safe Shutdown Fitness for Duty Shutdown Margin Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination License Renewal Maintenance Rule Program Fire Protection Program Power Uprate |
RS-16-040, Report on Status of Decommissioning Funding | 4 February 2016 | Report on Status of Decommissioning Funding | Decommissioning Funding Plan |
IR 05000456/2015501 | 3 February 2016 | NRC Emergency Preparedness Annual Inspection Report No. 05000456/2015501; 05000457/2015501 | |
IR 05000456/2015004 | 2 February 2016 | NRC Integrated Inspection Report 05000456/2015004; 05000457/2015004 | Boric Acid Packing leak Ultimate heat sink Non-Destructive Examination Water Inventory Control Internal Flooding Temporary Modification FLEX Significance Determination Process Through Wall Leak Through-Wall Leakage Fire Protection Program |
RS-16-039, Response to Request for Additional Information Regarding the Request for Exemption from 10 CFR 50.55a, Codes and Standards, Paragraph (h)(2), Protection Systems. | 29 January 2016 | Response to Request for Additional Information Regarding the Request for Exemption from 10 CFR 50.55a, Codes and Standards, Paragraph (h)(2), Protection Systems. | Surveillance Frequency Control Program Exemption Request |
ML16028A349 | 28 January 2016 | Single Positive Test Form Collected on 09/28/2015 | |
ML16028A353 | 28 January 2016 | Single Positive Test Form Collected on 09/29/2015 | |
ML16028A347 | 28 January 2016 | Single Positive Test Form Collected on 09/22/2015 |