Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML112070178 | 31 March 2011 | NRC-DCM Annual Calculation, Enclosure 2 | |
Press Release-III-11-004, NRC Schedules Open House for April 5 to Discuss Monticello Nuclear Power Plant Performance and NRC Oversight | 28 March 2011 | Press Release-III-11-004: NRC Schedules Open House for April 5 to Discuss Monticello Nuclear Power Plant Performance and NRC Oversight | Open House |
ML110871121 | 28 March 2011 | Independent Spent Fuel and Monticello, Decommissioning Funding Status Reports | |
TAC:ME5503 | 28 March 2011 | ||
ML110870258 | 27 March 2011 | Submittal of Summary of Nuclear Property Insurance | |
ML110870280 | 27 March 2011 | Submittal of Guarantee of Payment of Deferred Premiums | |
ML110810760 | 21 March 2011 | Requests Licensee to Docket Certain Information Regarding the Replacement Steam Dryer, and Identifies Issues to Be Audited During April 7 - 8 | |
ML110800037 | 17 March 2011 | Found 2/7/11 Application for Amendment Re. Core Spray Pump Flow Rate Acceptable for Review | |
ML110760666 | 16 March 2011 | Additional Draft RAI Questions Regarding Extended Power Uprate Using the Replacement Stem Dryer | |
ML110740780 | 15 March 2011 | Triennial Fire Protection Baseline Inspection Dates | |
ML110691267 | 10 March 2011 | Notice of Meeting/Open House to Present the Results of NRC End-of-Cycle Assessment Regarding Monticello Nuclear Generating Plant | |
ML110480915 | 9 March 2011 | Letter Regarding Request for Withholding Proprietary Information from Public | |
ML110690952 | 8 March 2011 | NRC Office of Investigations Report No. 3-2010-025 (AMS File No. RIII-2010-A-0022) (Cover Letter Only) | |
ML110600980 | 4 March 2011 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan | Cyber Security |
IR 05000263/2011001 | 4 March 2011 | Annual Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263-11-001) | Power Uprate |
ML110600749 | 28 February 2011 | Units 1 and 2, Fitness for Duty Performance Data for Period Ending December 31, 2010 | Fitness for Duty |
ML12033A179 | 17 February 2011 | Calculation CA 11-004, Finite Element Stress Analysis of Monticello RPV Feedwater Nozzle, Enclosure 6 | Finite Element Analysis Fire Protection Program |
ML12033A180 | 17 February 2011 | Calculation CA 11-020, Finite Element Analysis of RPV Recirculation Inlet Nozzle, Enclosure 7 | Finite Element Analysis Fire Protection Program |
ML12033A181 | 17 February 2011 | Calculation CA 11-005, Revised P-T Curves Calculation, Enclosure 8 | Hydrostatic Finite Element Analysis Fire Protection Program |
ML110470572 | 16 February 2011 | Request Notification of NRC Inspection and Request for Information ISI | Nondestructive Examination |
ML110480054 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades | |
ML110320354 | 15 February 2011 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan | Cyber Security |
ML110460487 | 15 February 2011 | Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades | |
IR 05000263/2010005 | 9 February 2011 | IR 05000263/2010005, 10/01/2010 - 12/31/2010; Monticello Nuclear Generating Plant. Follow Up of Events and Notices of Enforcement Discretion | Safe Shutdown Time of Discovery Hydrostatic Enforcement Discretion Temporary Modification Condition Adverse to Quality Significance Determination Process Job Performance Measure Scram Discharge Volume Deep Dose Equivalent Fire Protection Program Overexposure |
ML110200700 | 8 February 2011 | Request for Relief No. 17 Regarding Examination of Reactor Pressure Vessel Shell Circumferential Welds | Incorporated by reference |
ML110190204 | 8 February 2011 | Request for Withholding for Proprietary Information from Public Disclosure | |
L-MT-11-009, Response to Requests for Additional Information (RAI) for the License Amendment Request to Revise the Minimum Critical Power Ratio Safety Limit in Reactor Core Safety Limit 2.1.1.2 | 8 February 2011 | Response to Requests for Additional Information (RAI) for the License Amendment Request to Revise the Minimum Critical Power Ratio Safety Limit in Reactor Core Safety Limit 2.1.1.2 | Shutdown Margin MELLLA |
TAC:ME5441 | 7 February 2011 | ||
L-MT-11-015, License Amendment Request: Revise Core Spray Pump Flow Rate in Specification 3.5.1, ECCS - Operating | 7 February 2011 | License Amendment Request: Revise Core Spray Pump Flow Rate in Specification 3.5.1, ECCS - Operating | Safe Shutdown Pressure Boundary Leakage |
IR 05000263/2010301 | 28 January 2011 | Er 05000263-10-301(DRS), on 12/06/2010 - 12/22/2010, Monticello Nuclear Generating Plant, Northern States Power Company, Minnesota, Initial License Examination Report | Job Performance Measure |
ML110190581 | 14 January 2011 | Ltr. 01/14/2011 Monticello Re NRC Emergency Preparedness Annual Inspection Report No. 2010501 | |
IR 05000263/2010501 | 14 January 2011 | ||
L-MT-11-003, Request for Formal Interpretation of Regulations | 11 January 2011 | Request for Formal Interpretation of Regulations | Safe Shutdown Time of Discovery |
ML110450403 | 10 January 2011 | NPP - SSP-09/444-C, Revision 0, Gardel BWR - Power Distribution Uncertainties, Enclosures 2 and 3 to L-MT-11-009 | |
ML110110508 | 7 January 2011 | Xcel (Monticello and Prairie Island) Cyber Security Plan LAR - Draft RAI #1 | Cyber Security |