UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 15, 2011 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DATES

Dear Mr. OConnor:

On March 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) notified you of the results of its end-of-cycle performance review of the Monticello Nuclear Generating Plant. In addition, the NRC provided an inspection plan for inspections scheduled through June 30, 2012. As a result of discussions with Mr. D. Neve of your staff and the staff of the Dresden Nuclear Power Station, we have determined that the dates listed for Inspection Procedure (IP) 71111.05T, Fire Protection (Triennial), were incorrect. The correct dates for this inspection are:

On-site weeks: June 13 - 17, 2011 June 27 - July 1, 2011 July 11 - July 15, 2011 These dates are consistent with those outlined in our letter dated September 24, 2010.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Ronald A. Langstaff at (630) 829-9747 with any questions you may have regarding this letter.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via ListServ

Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DATES

Dear Mr. OConnor:

On March 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) notified you of the results of its end-of-cycle performance review of the Monticello Nuclear Generating Plant. In addition, the NRC provided an inspection plan for inspections scheduled through June 30, 2012. As a result of discussions with Mr.

D. Neve of your staff and the staff of the Dresden Nuclear Power Station, we have determined that the dates listed for Inspection Procedure (IP) 71111.05T, Fire Protection (Triennial), were incorrect. The correct dates for this inspection are:

On-site weeks: June 13 - 17, 2011 June 27 - July 1, 2011 July 11 - July 15, 2011 These dates are consistent with those outlined in our letter dated September 24, 2010.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Ronald A. Langstaff at (630) 829-9747 with any questions you may have regarding this letter.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via ListServ DISTRIBUTION LIST:

See next page DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 03__11 Monticello Fire Protection Inspection Dates RAL.docx 9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy OFFICE RIII RIII NAME RLangstaff:ls KRiemer RDaley DATE 03/10/11 03/10/11 03/15/11 OFFICIAL RECORD COPY

Letter to Mr. Timothy J. OConnor from Mr. Robert C. Daley dated March 15, 2011.