ML110980754 | 30 March 2011 | and ISFSI, Millstone, Units 1, 2 & 3 and ISFSI, North Anna, Units 1 & 2 and ISFSI, Surry, Units 1 & 2 and ISFSI, Submission of Annual Financial Report and Nuclear Liability Insurance Endorsements | High winds Cyber Security Incorporated by reference Pandemic |
ML110900670 | 30 March 2011 | Relief Request RR-04-11 Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 | Weld Overlay Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency |
TAC:ME5962 | 30 March 2011 | ||
ML110960361 | 30 March 2011 | ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval | Boric Acid Non-Destructive Examination Hydrostatic VT-2 Liquid penetrant |
TAC:ME5998 | 30 March 2011 | ||
TAC:ME6007 | 30 March 2011 | ||
ML110900375 | 29 March 2011 | Decommissioning Funding Status Report | |
TAC:ME5501 | 28 March 2011 | ||
ML110680080 | 24 March 2011 | Issuance of Relief Request lR-3-14 -- Use of Risk-Informed Inservice Inspection Program Plan | Internal Flooding Probabilistic Risk Assessment Incorporated by reference |
ML110820207 | 23 March 2011 | Senior Reactor and Reactor Operator Initial License Examinations-Millstone Unit 3 | |
ML110700507 | 16 March 2011 | Request for Additional Information Regarding Pressure Testing Requirements for Service Water System Buried Piping Systems | |
ML110660110 | 10 March 2011 | Notification of Project Manager Assignment | |
ML110700585 | 10 March 2011 | Request for Additional Information Relief Request RR-04-05 Use of Alternative Pressure Testing Requirements for Service Water System Buried Piping Segments | |
ML110740442 | 10 March 2011 | Unit 1 & 2, Requests for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue, Severe Weather Response Procedures | Fitness for Duty High winds |
ML110630359 | 7 March 2011 | Request for Additional Information Related to License Amendment Request for Approval of Cyber Security Plan | Cyber Security |
IR 05000336/2010001 | 4 March 2011 | Annual Assessment Letter for Millstone Power Station Unit 2 and Unit 3 (Report 05000336/2010001 and 05000423/2010001) | |
ML110610365 | 2 March 2011 | Acceptance Review: MPS3 SG Temporary ARC | |
ML110540393 | 2 March 2011 | Closeout of Generic Letter 2008-01,Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray System | |
ML110610207 | 1 March 2011 | Relief Request RR-04-07: Response to Request for Additional Information Regarding Proposed Alternative for Examination Criteria of Weld Overlays | Weld Overlay |
ML110390664 | 28 February 2011 | Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit No. 3 | |
ML110600734 | 28 February 2011 | Submittal of Fitness-For-Duty Program, Annual Performance Data Report for 2010 | Fitness for Duty |
ML110550478 | 24 February 2011 | Acceptance Review of Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue, 10 CFR 26 | Fitness for Duty Exemption Request |
Press Release-I-11-003, NRC Begins Special Inspection at Millstone Unit 2 Nuclear Plant | 22 February 2011 | Press Release-I-11-003: NRC Begins Special Inspection at Millstone Unit 2 Nuclear Plant | |
ML110450178 | 14 February 2011 | Nuclear Property Insurance Coverage | |
TAC:ME4475 | 14 February 2011 | ||
ML110270149 | 14 February 2011 | Request for Additional Information Regarding Examination Criteria for Weld Overlays | Weld Overlay |
ML110450583 | 10 February 2011 | Units 1 & 2 - Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue | Safe Shutdown Fitness for Duty High winds Enforcement Discretion Exemption Request Minimum staff Fire Watch |
ML110341619 | 8 February 2011 | D. Heacock Ltr. Change in NRC Staff Project Manager for Millstone Power Station Unit 1 | |
ML113350205 | 4 February 2011 | Draft Written Exam (Folder 2) | Boric Acid High winds Shutdown Margin Ultimate heat sink Reserve Station Service Transformer Continuous fire watch Fire Watch Power change |
ML113500249 | 3 February 2011 | Draft - Outlines (Folder 2) | Shutdown Margin Time to boil Job Performance Measure Fire Watch Downpower |
ML113500251 | 3 February 2011 | Draft Operating Exam (Sections a, B, and C) (Folder 2) | Safe Shutdown Boric Acid Shutdown Margin Time to boil Locked High Radiation Area Job Performance Measure Earthquake Pressure Boundary Leakage Downpower Unidentified leakage |
ML110310682 | 1 February 2011 | Revised Notice of Forthcoming Public Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Millstone Power Station Licensing Activities | |
IR 05000336/2011403 | 1 February 2011 | Final Significance Determination for a Security-Related Green Finding (NRC Inspection Report Nos. 05000336/2011403; 05000423/2011403) - Millstone Nuclear Power Station | Affidavit |
ML110400087 | 25 January 2011 | Submittal of a Copy of the Final Report for the Millstone Plume and Post Plume Biennial Exercise, Conducted on October 19-20, 2010, After Action Report/Improvement Plan | |
TAC:ME3809 | 20 January 2011 | ||
ML110250259 | 20 January 2011 | Request for Additional Information Regarding Relief Requests for Limited Coverage Examinations Performed in the Second 10-Year Inspection Interval | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML110280208 | 20 January 2011 | License Amendment Request to Revise Technical Specification (TS) 6.8.4.g, Steam Generator (SG) Program, and TS 6.9.1.7, Steam Generator Tube Inspection Report for Temporary Alternate Repair Criteria (H*) | Shutdown Margin High Radiation Area Nondestructive Examination Coast down |
ML110180091 | 19 January 2011 | Notice of Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Millstone Power Station Licensing Activities | |
ML103640257 | 18 January 2011 | Issuance of Relief Request RR-04-08 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition | Boric Acid VT-2 Incorporated by reference |
TAC:ME4476 | 18 January 2011 | ||
ML103550446 | 18 January 2011 | Issuance of Relief Request RR-04-06 Regarding Use of Performance Demonstration Initiative Qualified Procedures, Personnel and Equipment | Incorporated by reference |
TAC:ME4474 | 18 January 2011 | ||
ML110140357 | 14 January 2011 | NRC Investigation Report No. 1-2010-024 and 1-2010-028; Millstone Power Station | |
ML110140343 | 14 January 2011 | Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates | Generic Fundamentals Examination |
ML103480762 | 12 January 2011 | November 8, 2010 Summary of Teleconference W/ DNC to Discuss Generic Letter 2004-02 Supplemental Response Request for Additional Information | |
ML110070175 | 11 January 2011 | Request for Technical Assistance on Request for Exemption Form Certain Requirements of 10 CFR 73.55 for Millstone Power Station, Unit 1 | |
ML110070530 | 6 January 2011 | Response to NRC Inspection Reports 05000336-10-008 and 05000423-10-011, Dated January 6, 2011 | |
ML110070642 | 6 January 2011 | NRC Office of Investigations Case No. 1-2009-052 |