Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML110980097 | 31 March 2011 | Submittal of Annual Financial Test for a Parent Company Guarantee | |
ML110880469 | 29 March 2011 | Acceptance Review Results Regarding Relief Request VRR3, VRR4, and VRR5 (ME5749, ME5750, ME5752, ME5781, and ME5782) | |
L-11-102, Submittal of the Decommissioning Reports | 29 March 2011 | Submittal of the Decommissioning Reports | |
TAC:ME6805 | 29 March 2011 | ||
L-11-121, Submittal of Discharge Monitoring Report for February 2011 | 28 March 2011 | Submittal of Discharge Monitoring Report for February 2011 | |
ML110630403 | 23 March 2011 | Relief Request Rl-lSl-1 and Rl-lSl-2 Regarding the Fourth and Third Risk-Informed Inservice Inspection Intervals | Non-Destructive Examination Probabilistic Risk Assessment VT-2 Large early release frequency Exemption Request Dissimilar Metal Weld |
ML111250535 | 23 March 2011 | Rtl# A9.630F, 2010 Annual Environmental Operating Report Non-Radiological, Enclosure B to L-11-041 | Grab sample Zebra Mussel Annual Radiological Environmental Operating Report Veliger Biofouling |
L-11-101, Supplemental Information for Spent Fuel Pool Rerack License Amendment Request | 21 March 2011 | Supplemental Information for Spent Fuel Pool Rerack License Amendment Request | Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake |
ML110800570 | 21 March 2011 | Supplemental Information for Spent Fuel Pool Rerack License Amendment Request | Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake |
L-11-103, Supplement to Spent Fuel Pool Rerack Amendment Request | 18 March 2011 | Supplement to Spent Fuel Pool Rerack Amendment Request | |
ML110800122 | 18 March 2011 | Supplement to Spent Fuel Pool Rerack Amendment Request | |
L-11-084, Retrospective Premium Guarantee | 15 March 2011 | Retrospective Premium Guarantee | |
ML110750478 | 10 March 2011 | E-mail Summary of Clarification Phone Call Regarding the Beaver Valley 2 Spent Fuel Pool Rerack Amendment (ME1079) | Safe Shutdown Earthquake |
L-11-042, Annual Notification of Nuclear Property Insurance Coverage | 7 March 2011 | Annual Notification of Nuclear Property Insurance Coverage | |
ML110630455 | 7 March 2011 | Request for Additional Information Regarding Amendment Application for Approval of the Cyber Security Plan | Cyber Security |
IR 05000334/2010001 | 4 March 2011 | Annual Assessment Letter for Beaver Valley Units 1 and 2, EOC 11 (Report 05000334/2010001 and 05000412/2010001) | |
ML110610286 | 28 February 2011 | Single Positive Test Form for Pre-Access, Collected on 09/11/2010 | |
ML110610332 | 28 February 2011 | CFR Part 26, Subpart I - Managing Fatigue, for Period Ending 2010 | |
ML110610330 | 28 February 2011 | Annual Reporting Form for Drug and Alcohol Tests for Period Ending 2010 | |
ML110610327 | 28 February 2011 | Single Positive Test Form for Pre-Access, Collected on 08/23/2010 | |
ML110610325 | 28 February 2011 | Single Positive Test Form for Pre-Access, Collected on 09/20/2010 | |
ML110610322 | 28 February 2011 | Single Positive Test Form for Pre-Access, Collected on 09/21/2010 | |
ML110610297 | 28 February 2011 | Single Positive Test Form for Cause, Collected on 03/16/2010 | |
ML110610294 | 28 February 2011 | Single Positive Test Form for Pre-Access, Collected on 09/15/2010 | |
ML110610285 | 28 February 2011 | Single Positive Test Form for Random, Collected on 10/21/2010 | |
ML110610281 | 28 February 2011 | Single Positive Test Form for Followup, Collection 07/14/2010 | |
ML110610280 | 28 February 2011 | Single Positive Test Form for Pre-Access, Collected on 09/13/2010 | |
ML110610272 | 28 February 2011 | Single Positive Test Form for Random, Collection on 05/17/2010 | |
ML110610267 | 28 February 2011 | Annual FFD Report, Single Positive Test Form for Pre-Access, Collection on 07/19/2010 | |
TAC:ME5781 | 25 February 2011 | ||
ML110610205 | 25 February 2011 | 10 CFR 50.55a Request (VRR5) Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency | |
L-11-023, Request (VRR5) Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency | 25 February 2011 | Request (VRR5) Regarding Turbine Driven Auxiliary Feedwater Valve Test Frequency | |
ML110470557 | 25 February 2011 | Relief Request Regarding an Alternative Weld Repair Method for Reactor Vessel Head Penetrations J-Groove Welds | Weld Overlay Nondestructive Examination Incorporated by reference |
ML110550181 | 25 February 2011 | Request for Withholding Information from Public Disclosure | |
ML110350162 | 24 February 2011 | License Amendment, Issuance of Amendment Regarding the Revised Steam Generator Inspection Scope Using F* Inspection Methodology | Safe Shutdown Earthquake Nondestructive Examination |
L-11-074, Submittal of Discharge Monitoring Report | 24 February 2011 | Submittal of Discharge Monitoring Report | Grab sample |
TAC:ME5749 | 21 February 2011 | ||
TAC:ME5752 | 21 February 2011 | ||
L-11-020, 10 CFR 50.55a Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency | 21 February 2011 | 10 CFR 50.55a Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency | Stroke time |
L-11-021, Proposed 10 CFR 50.55a Request VRR4 Regarding Pressurizer Safety Valve Test Frequency | 21 February 2011 | Proposed 10 CFR 50.55a Request VRR4 Regarding Pressurizer Safety Valve Test Frequency | Grace period |
L-11-024, Chapters 5 and 7 of Holtec Licensing Report, in Support of License Amendment Request for Unit 2 Spent Fuel Pool Rerack | 18 February 2011 | Chapters 5 and 7 of Holtec Licensing Report, in Support of License Amendment Request for Unit 2 Spent Fuel Pool Rerack | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Finite Element Analysis Earthquake Fuel cladding |
L-11-057, Responses to NRC Staff Request for Additional Information Regarding Unit No. 2 Spent Fuel Pool Rerack Criticality Analyses | 18 February 2011 | Responses to NRC Staff Request for Additional Information Regarding Unit No. 2 Spent Fuel Pool Rerack Criticality Analyses | Fuel cladding |
IR 05000334/2010005 | 14 February 2011 | IR 05000334-10-005, 05000412-10-005, on 10/01/10 - 12/31/10; Beaver Valley Power Station, Units 1 & 2; Outage Activities | Safe Shutdown Boric Acid High winds High Radiation Area Non-Destructive Examination Time to boil Weld Overlay Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination License Renewal Liquid penetrant Scaffolding Operability Assessment |
ML110470404 | 14 February 2011 | Containment Liner Random and Non-Random Examinations Report | |
ML110390133 | 10 February 2011 | Staff Evaluation Regarding the 2009 Steam Generator Inspection Report | |
L-11-025, Response to Request for Additional Information Regarding the Request for Approval of Cyber Security Plan License Amendment Request | 3 February 2011 | Response to Request for Additional Information Regarding the Request for Approval of Cyber Security Plan License Amendment Request | Cyber Security |
L-11-002, Twentieth Refueling Outage Inservice Inspection Report | 31 January 2011 | Twentieth Refueling Outage Inservice Inspection Report | Hydrostatic VT-2 Moisture barrier |
L-11-048, Discharge Monitoring Report (NPDES) Permit No. PA0025615 | 27 January 2011 | Discharge Monitoring Report (NPDES) Permit No. PA0025615 | Grab sample |
L-11-026, Response to Request for Additional Information Regarding Application for License Amendment for Revised Steam Generator Inspection Scope Using F* Methodology | 26 January 2011 | Response to Request for Additional Information Regarding Application for License Amendment for Revised Steam Generator Inspection Scope Using F* Methodology | |
ML13126A045 | 25 January 2011 | RTL A9.621B, Procedure 1/2-ODC-2.02, Rev. 3, ODCM: Gaseous Effluents |