Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML01325025415 November 2001Entergy Nuclear Generation Company, Transfer of Certain Entergy Nuclear Employees to Entergy Nuclear Operations, IncFire Protection Program
ML0707805088 November 2001CR-PNP-2001-04779, T- 112 Cation Regen Tank Found Second Leak
ML07079060310 October 2001Pr 01.4238, Tour Operator Reported That HCU 50-31 Leak Appears Worse - Closure
ML07078049127 September 2001CR-PNP-2001-04238, HCU 50-31 Leak
ML07079059625 September 2001Pr 01.4171, Tour Operator Found Alarm C190-D3 on D# SBO DG Fuel Tank Leakage in Alarm. Panel Indicates Probe #1 Wet Alert Water Detected Alarm
ML07078045320 September 2001CR-PNP-2001-04171, Alarm C190-D3 SBO DG Fuel Tank Leakage in Alarm
ML07079058317 September 2001Pr 01.4048, Received Sdo DG Fuel Tank Leakage Alarm Alert Wet Probes 1
ML07078043910 September 2001CR-PNP-2001-04048, Received SBO DG Fuel Tank Leakage Alarm Alert Wet Probes
ML0122604678 August 2001Revision 2 to EP-IP-201, Emergency Plant Manager, Revision 4 to EP-IP-230 and Revison 6 to EP-IP-440Minimum staff
ML01141029315 May 20012000 Annual Radioactive Effluent and Waste Disposal ReportLoop seal
Offsite Dose Calculation Manual
ML0707804313 May 2001CR-PNP-2001-02275, a SSW Discharge Piping 20 Foot Section of Rubber Lining Peeled Off of Piping Exposing Bare Metal
ML0707905683 May 2001Pr 01.2275, During Visual Exam of 'A' SSW Discharge Piping It Was Discovered That a 20 Foot Section of Rubber Lining Was Peeled Off of the Piping Exposing Bare Metal
ML07079064327 April 2001Pr 01.940, Large Leak Reported in the Vicinity of Aog Building. Fire System Has Broken Pipe Between 12-D-8 and 12-D-9
ML07078052921 April 2001CR-PNP-2001-09403, Fire System Has Broken Pipe Between 12-D-8, 12D-9 in Aog Building
ML01093024930 March 2001Rev 14 to EP-IP-100, Emergency Classification and Notification.Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Preplanned Activity
Earthquake
Fuel cladding
ML0104402947 February 2001Revision 9 to EPIP-200, Revision 3 to EPIP-202, Revision 9 to EPIP-250, Revision 7 to EPIP-252 and Revision 5 to EPIP-520Health Physics Network
ML01030034223 January 20013 for EPIP-100 and Revision 8 for EPIP-400 for PilgrimOperating Basis Earthquake
Preplanned Activity
Earthquake
Fuel cladding