Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML013250254 | 15 November 2001 | Entergy Nuclear Generation Company, Transfer of Certain Entergy Nuclear Employees to Entergy Nuclear Operations, Inc | Fire Protection Program |
ML070780508 | 8 November 2001 | CR-PNP-2001-04779, T- 112 Cation Regen Tank Found Second Leak | |
ML070790603 | 10 October 2001 | Pr 01.4238, Tour Operator Reported That HCU 50-31 Leak Appears Worse - Closure | |
ML070780491 | 27 September 2001 | CR-PNP-2001-04238, HCU 50-31 Leak | |
ML070790596 | 25 September 2001 | Pr 01.4171, Tour Operator Found Alarm C190-D3 on D# SBO DG Fuel Tank Leakage in Alarm. Panel Indicates Probe #1 Wet Alert Water Detected Alarm | |
ML070780453 | 20 September 2001 | CR-PNP-2001-04171, Alarm C190-D3 SBO DG Fuel Tank Leakage in Alarm | |
ML070790583 | 17 September 2001 | Pr 01.4048, Received Sdo DG Fuel Tank Leakage Alarm Alert Wet Probes 1 | |
ML070780439 | 10 September 2001 | CR-PNP-2001-04048, Received SBO DG Fuel Tank Leakage Alarm Alert Wet Probes | |
ML012260467 | 8 August 2001 | Revision 2 to EP-IP-201, Emergency Plant Manager, Revision 4 to EP-IP-230 and Revison 6 to EP-IP-440 | Minimum staff |
ML011410293 | 15 May 2001 | 2000 Annual Radioactive Effluent and Waste Disposal Report | Loop seal Offsite Dose Calculation Manual |
ML070780431 | 3 May 2001 | CR-PNP-2001-02275, a SSW Discharge Piping 20 Foot Section of Rubber Lining Peeled Off of Piping Exposing Bare Metal | |
ML070790568 | 3 May 2001 | Pr 01.2275, During Visual Exam of 'A' SSW Discharge Piping It Was Discovered That a 20 Foot Section of Rubber Lining Was Peeled Off of the Piping Exposing Bare Metal | |
ML070790643 | 27 April 2001 | Pr 01.940, Large Leak Reported in the Vicinity of Aog Building. Fire System Has Broken Pipe Between 12-D-8 and 12-D-9 | |
ML070780529 | 21 April 2001 | CR-PNP-2001-09403, Fire System Has Broken Pipe Between 12-D-8, 12D-9 in Aog Building | |
ML010930249 | 30 March 2001 | Rev 14 to EP-IP-100, Emergency Classification and Notification. | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Preplanned Activity Earthquake Fuel cladding |
ML010440294 | 7 February 2001 | Revision 9 to EPIP-200, Revision 3 to EPIP-202, Revision 9 to EPIP-250, Revision 7 to EPIP-252 and Revision 5 to EPIP-520 | Health Physics Network |
ML010300342 | 23 January 2001 | 3 for EPIP-100 and Revision 8 for EPIP-400 for Pilgrim | Operating Basis Earthquake Preplanned Activity Earthquake Fuel cladding |