ML21190A052 | 24 June 2021 | Technical Requirements Manual | Shutdown Margin Ultimate heat sink Water Inventory Control Post Accident Monitoring |
ML21196A181 | 24 June 2021 | Technical Requirements Manual | Shutdown Margin Ultimate heat sink Water Inventory Control Post Accident Monitoring |
ML21165A194 | 16 June 2021 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation | Coronavirus |
ML21165A288 | 16 June 2021 | Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) | Coronavirus |
ML21153A137 | 15 June 2021 | Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times | Internal Flooding Probabilistic Risk Assessment FLEX Turbine Missile |
ML21190A170 | 11 June 2021 | NRR E-mail Capture - NRC Notification to the State of Pennsylvania Regarding a Susquehanna Steam Electric Station, Unit 2 Amendment - Unit 1 Transformer Replacement | |
PLA-7947, 10 CFR 50.46 Annual Report (PLA-7947) | 10 June 2021 | 10 CFR 50.46 Annual Report (PLA-7947) | |
Press Release-I-21-005, NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants | 1 June 2021 | Press Release-I-21-005: NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants | |
ML21140A314 | 20 May 2021 | Notice of Public Meeting - Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Power Plants (Bv, CC, FP, Gn, Hc, Lm, NMP, Pb, SAL, & Sq) | |
ML21126A125 | 14 May 2021 | Project Manager Assignment to Audrey L. Klett Effective May 24, 2021 | |
ML21133A370 | 13 May 2021 | Control Point Hazard | |
IR 05000387/2021001 | 5 May 2021 | Integrated Inspection Report 05000387/2021001 and 05000388/2021001 | Stroke time Commercial Grade Dedication Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Test box Significance Determination Process Operability Determination License Renewal Coronavirus COVID-19 Fire Protection Program Power change Coast down |
ML21124A202 | 4 May 2021 | NRR E-mail Capture - Acceptance Review for Susquehanna TSTF-505 | |
ML21078A111 | 30 April 2021 | Letter to Susquehanna Nuclear Regarding Initial and Updated Decommissioning Funding Plans for the Susquehanna Steam Electric Station Independent Spent Fuel Storage Installation | Decommissioning Funding Plan Authorized possession limits License Renewal |
ML21078A112 | 30 April 2021 | Letter to Allegheny Electric Cooperative Regarding Initial and Updated Decommissioning Funding Plans for the Susquehanna Steam Electric Station Independent Spent Fuel Storage Installation | Decommissioning Funding Plan Authorized possession limits License Renewal |
PLA-7925, Radiation Exposure Information and Reporting System, PLA-7925 | 28 April 2021 | Radiation Exposure Information and Reporting System, PLA-7925 | |
PLA-7928, Annual Radiological Environmental Operating Report | 26 April 2021 | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Tritium Stolen |
PLA-7927, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-7927 | 26 April 2021 | Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-7927 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML21054A303 | 22 April 2021 | Memo to File: Final Ea/Fonsi of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Susquehanna | Decommissioning Funding Plan |
ML21054A304 | 22 April 2021 | Final Environmental Assessments and Findings of No Significant Impact of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Susquehanna | Decommissioning Funding Plan Authorized possession limits |
ML21095A304 | 19 April 2021 | Relief Request 4RR-02 Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds | Incorporated by reference |
PLA-7936, Response to NRC Regulatory Issue Summary 2021-01, PLA-7936 | 15 April 2021 | Response to NRC Regulatory Issue Summary 2021-01, PLA-7936 | |
PLA-7926, 2020 Annual Environmental Operating Report (Nonradiological) PLA-7926 | 9 April 2021 | 2020 Annual Environmental Operating Report (Nonradiological) PLA-7926 | Zebra Mussel Biofouling |
PLA-7897, Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. | 8 April 2021 | Proprosed Amendment to Licenses NPF-14 and NPF-22: License Amendment Request to Revise Technical Specification to Adopt Risk Informed Completion Times TSTF-505, Rev 2, Provide Risk Informed Extended Completion. | Hot Short Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Mission time Fire Barrier Anticipated operational occurrence Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake FLEX Fukushima Dai-Ichi Tornado Missile Protection Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Large early release frequency B.5.b Mitigating Strategies Earthquake Turbine Missile Offsite Circuit Fire Protection Program |
PLA-7924, Nuclear Property Insurance Program PLA-7924 | 1 April 2021 | Nuclear Property Insurance Program PLA-7924 |