Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000400/201400823 June 2014IR 05000400-14-008, 04/21-25/2014 - 05/5-9/2014, Shearon Harris, NRC Triennial Fire ProtectionSafe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Emergency Lighting
B.5.b
Significance Determination Process
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
TAC:MF429419 June 2014
ML14177A76019 June 2014FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014
HNP-14-043, License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints19 June 2014License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary SetpointsAnticipated operational occurrence
Incorporated by reference
Grace period
ML14169A03015 June 2014Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62
ML14157A05513 June 2014Acceptance of Requested Relief Request I3R-14-Deferral of Reactor Vessel Inspections Inservice Inspection Program-Third 10-Year Interval
RA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations3 June 2014Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations
ML14154A45730 May 2014Notification of Licensed Operator Initial Examination 05000400-14-302
HNP-14-064, NPDES Permit Application Amendment Request29 May 2014NPDES Permit Application Amendment RequestBoric Acid
Hydrostatic
Biofouling
Power Uprate
HNP-14-062, Annual Report of Changes Pursuant to 10 CFR 50.4619 May 2014Annual Report of Changes Pursuant to 10 CFR 50.46
ML14129A3359 May 2014Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Backfit
ML14099A21728 April 2014FRN on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSIHydrostatic
Cyber Security
Preemption Authority
Exemption Request
Fuel cladding
IR 05000400/201400228 April 2014IR 05000400-14-002, Duke Energy Progress, Inc.; on January 1, 2014 - March 31, 2014; Shearon Harris Nuclear Power Plant, Unit 1; Operability Evaluations, Surveillance Testing, and Identification and Resolution of ProblemsSafe Shutdown
Probabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
Local Leak Rate Testing
Stress corrosion cracking
Fire Protection Program
Power change
HNP-14-039, Annual Environmental (Nonradiological) Operating Report25 April 2014Annual Environmental (Nonradiological) Operating ReportZebra Mussel
Biofouling
TAC:MF411325 April 2014
HNP-14-051, Relief Request I3R-14, Deferral of Reactor Vessel Inspections Inservice Inspection Program - Third Ten-Year Interval25 April 2014Relief Request I3R-14, Deferral of Reactor Vessel Inspections Inservice Inspection Program - Third Ten-Year IntervalProbabilistic Risk Assessment
License Renewal
Power Uprate
Measurement Uncertainty Recapture
HNP-14-038, Annual Radiological Environmental Operating Report for 201324 April 2014Annual Radiological Environmental Operating Report for 2013High winds
Grab sample
Offsite Dose Calculation Manual
Missed surveillance
Fukushima Dai-Ichi
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
HNP-14-050, Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process24 April 2014Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement ProcessShutdown Margin
Nondestructive Examination
Operational leakage
Press Release-II-14-023, NRC Schedules Meeting in Holly Springs to Discuss Harris Nuclear Plant Performance23 April 2014Press Release-II-14-023: NRC Schedules Meeting in Holly Springs to Discuss Harris Nuclear Plant PerformanceOpen House
HNP-14-037, Annual Radioactive Effluent Release Report22 April 2014Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Tritium
Power change
ML14106A29016 April 2014Notice of Category 1 Public Meeting Regarding Shearon Harris Nuclear Plant to Discuss NRC Reactor Oversight Process Annual Assessment of 2013 PerformanceOpen House
ML22195A17714 April 2014NSAL-14-2: Westinghouse Loss-of-Coolant Accident Mass and Energy Release Calculation Issue for Steam Generator Tube Material PropertiesUltimate heat sink
ML14093A07511 April 2014Relief Request I3R-13 for Reactor Vessel Closure Head Penetration Nozzle 37 Repair Inservice Inspection Program - Third 10-Year IntervalNondestructive Examination
Incorporated by reference
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld