ML14154A457
ML14154A457 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 05/30/2014 |
From: | Eugene Guthrie Division of Reactor Safety II |
To: | Kapopoulos E Progress Energy Carolinas |
References | |
05-400/14-302 | |
Download: ML14154A457 (5) | |
See also: IR 05000400/2014302
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 30, 2014
Ernest J. Kapopoulos, Jr.
Vice President
Shearon Harris Nuclear Power Plant
5413 Shearon Harris Rd
New Hill, NC 27562-0165
SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000400/2014302
Dear Mr. Kapopoulos:
In a telephone conversation May 7, 2014, between Mr. Scott Rua, Exam Supervisor, and
Mr. David Lanyi, Operations Engineer, arrangements were made for the administration of
licensing examinations at the Shearon Harris Nuclear Plant. The operating test is scheduled to
be administered during the weeks of November 3 and 10, 2014. The written examination is
scheduled to be administered the week of November 17, 2014. The on-site preparatory week is
scheduled for the week of October 6, 2014.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by August 20, 2014. Mr. Lanyi provided the written examination outline to your staff in
April, 2014. The operating test, written examination, and the supporting reference materials
identified in Attachment 3 to ES-201 will be due by September 19, 2014. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
E. Kapopoulos 2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
E. Kapopoulos 3
Thank you for your cooperation in this matter. Mr. Rua has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail:
david.lanyi@nrc.gov ), or me at (404) 997- 4662, (eugene.guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-400
License Nos.: NPF-63
cc: Distribution via Listserv
_ML14154A457_______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS
SIGNATURE Via email EFG
NAME LANYI GUTHRIE
DATE 5/28/2014 5/30/2014 6/ /2014 6/ /2014 6/ /2014 6/ /2014 6/ /2014
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Letter to Ernest J. Kapopoulos from Eugene F. Guthrie dated May 30, 2014
SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000400/2014302
Distribution:
RIDSNRRDIRS
PUBLIC
RidsNrrPMShearonHarris RESOURCE