Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11180136229 June 2011E-mail, Request for Additional Information, Round 2, Nrr/De/Eicb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
ML11179063928 June 2011Summary of Meeting with Entergy Operations Inc
GNRO-2011/00045, Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System28 June 2011Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System
ML11174021323 June 2011Email, Request for Additional Information, Round 6, License Amendment Request for Power Range Neutron Monitoring System
ML11175146323 June 2011Notification of NRC Initial Operator Licensing Examination 05000416/2011301
GNRO-2011/00052, Request for Additional Information Re Extended Power Uprate23 June 2011Request for Additional Information Re Extended Power Uprate
GNRO-2011/00036, (Ggns), Unit 1, Emergency Response Data System (ERDS) Changes23 June 2011(Ggns), Unit 1, Emergency Response Data System (ERDS) Changes
ML11173074622 June 2011Email, Request for Additional Information, Nrr/Dss/Scvb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
CNRO-2011-00003, Unit 1, Updated Schedule of Submittal of Future License Renewal Applications22 June 2011Unit 1, Updated Schedule of Submittal of Future License Renewal Applications
GNRO-2011/00050, Request for Additional Information Regarding Extended Power Uprate, License No. NPF-2921 June 2011Request for Additional Information Regarding Extended Power Uprate, License No. NPF-29
ML11139054321 June 2011Request for Withholding Information from Public Disclosure, 5/11/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00037
ML11172004220 June 2011Licensee Response Regarding Request for Additional Information on Training for Prnms (TAC No. 4679)
TAC:ME657820 June 2011
Press Release-IV-11-029, NRC Names New Resident Inspector at Grand Gulf Nuclear Station20 June 2011Press Release-IV-11-029: NRC Names New Resident Inspector at Grand Gulf Nuclear StationNew Resident Inspector
ML11174A22820 June 2011G20110477/LTR-11-0368/EDATS: SECY-2011-0376 - E-Mail. Thomas Saporito 2.206 Enforcement Petition for Entergy Palisades, Vermont Yankee & J. Wayne Leonard
GNRO-2011/00046, Response to Request for Additional Information Regarding Extended Power Uprate15 June 2011Response to Request for Additional Information Regarding Extended Power Uprate
ML11362A43414 June 2011Enclosure 2: Grand Gulf Nuclear Station License Renewal Application - NOAA Response
GNRO-2011/00044, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System13 June 2011Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring SystemJob Performance Measure
IR 05000416/20110028 June 2011Errata for Grand Gulf - Integrated IR 05000416-11-002, Grand Gulf, Page 34
GNRO-2011/00043, Request for Additional Information Regarding Extended Power Uprate8 June 2011Request for Additional Information Regarding Extended Power UprateSafe Shutdown
Reactor Vessel Water Level
GNRO-2011/00041, Response to NRC Bulletin 2011-01, Mitigating Strategies8 June 2011Response to NRC Bulletin 2011-01, Mitigating StrategiesB.5.b Mitigating Strategies
TAC:ME64368 June 2011
ML1115704056 June 2011Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness
ML1115304396 June 2011(Redacted) Request for Additional Information from Nrr/De/Emcb Steam Dryer, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 MwtLiquid penetrant
ML1113906562 June 2011Request for Withholding Information from Public Disclosure, 5/11/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00038
ML1113905962 June 2011Request for Withholding Information from Public Disclosure, 4/28/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00032
ML1115401072 June 2011Request for Additional Information 2011 Decommissioning Funding Status Report
TAC:ME54492 June 2011
ML1115400892 June 2011Email, Request for Additional Information 2011 Decommissioning Funding Status Report
ML1115204581 June 2011Email, Request for Additional Information, Nrr/Dra/Aadb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
ML11139052531 May 2011Request for Withholding Information from Public Disclosure, 4/21/2011 Affidavit Executed by E. Schrull, GEH, for Attachment 1 to GNRO-2011/00025
GNRO-2011/00042, Responses to NRC Requests for Additional Information Re License Amendment Request for Power Range Neutron Monitoring System31 May 2011Responses to NRC Requests for Additional Information Re License Amendment Request for Power Range Neutron Monitoring SystemAnticipated operational occurrence
Safe Shutdown Earthquake
Earthquake
GNRO-2011/00039, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System26 May 2011Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring SystemAnticipated operational occurrence
Incorporated by reference
ML11140029920 May 2011E-mail, Request for Additional Information, Nrr/Dci/Emcb Review, Round 2, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
GNRO-2011/00038, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System16 May 2011Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System
IR 05000416/201100813 May 2011NRC Temporary Instruction 2515/183 Inspection Report 05000416/2011008Safe Shutdown Earthquake
B.5.b
Severe Accident Management Guideline
Earthquake
Fire Protection Program
Scaffolding
ML11132049312 May 2011E-mail, Request for Additional Information, Round 5, License Amendment Request for Power Range Neutron Monitoring System
GNRO-2011/00037, Request for Additional Information Regarding Extended Power Uprate11 May 2011Request for Additional Information Regarding Extended Power Uprate
ML11130046210 May 2011IR 05000416-11-002; on 01/21/2011 03/27/2011; Grand Gulf Nuclear Station, Integrated Resident and Regional Report; Fire Protection, Maintenance Effectiveness, Radiological Hazard Assessment and Exposure Controls, and Event Follow-UpSafe Shutdown
High Radiation Area
Half scram
Mission time
Internal Flooding
Temporary Modification
Emergency Lighting
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
B.5.b Mitigating Strategies
Earthquake
Maintenance Rule Program
Biofouling
Fire Protection Program
Hourly Fire Watch
Scaffolding
Substantial potential for overexposure
Substantial potential for an overexposure
Power change
ML11130015610 May 2011Email, Request for Additional Information, Nrr/Dss/Scvb Review, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 MwtSafe Shutdown
ML1109805389 May 2011Cyber Security Plan Implementation ScheduleCyber Security
GNRO-2011/00035, Response to Request for Additional Information Regarding Extended Power Uprate5 May 2011Response to Request for Additional Information Regarding Extended Power UprateSafe Shutdown
Battery sizing
ML12019A0163 May 2011Drawing LRA-E-001 (LRA-E-001), Rev. 0, Grand Gulf Nuclear Station Offsite Power Recovery Diagram. Sheet 1
GNRO-2011/00034, Request for Additional Information Regarding Extended Power Uprate3 May 2011Request for Additional Information Regarding Extended Power Uprate
GNRO-2011/00032, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System3 May 2011Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System
ML1110102282 May 2011Closeout of Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
CNRO-2011-00004, Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G29 April 2011Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
GNRO-2011/00029, Annual Report of Individual Monitoring - Form NRC 5 for 2010 Per 10CFR20.220629 April 2011Annual Report of Individual Monitoring - Form NRC 5 for 2010 Per 10CFR20.2206
GNRO-2011/00031, 2010 Annual Radiological Environmental Operating Report28 April 20112010 Annual Radiological Environmental Operating ReportOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
GNRO-2011/00030, Annual Radioactive Effluent Release Report (ARERR)28 April 2011Annual Radioactive Effluent Release Report (ARERR)Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report