ML111540089
| ML111540089 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf, Arkansas Nuclear, River Bend, Waterford |
| Issue date: | 06/02/2011 |
| From: | Wang A Plant Licensing Branch IV |
| To: | David Bice, Burmeister B, England L, Rolonda Jackson, Lorfing D, Perino C Entergy Operations |
| Wang, A B, NRR/DORL/LPLIV, 415-1445 | |
| References | |
| TAC ME5449, TAC ME5450, TAC ME5487, TAC ME5526, TAC ME5550 | |
| Download: ML111540089 (1) | |
Text
From:
Wang, Alan Sent:
Thursday, June 02, 2011 4:10 PM To:
BURMEISTER, BARRY M; Perino, Christina; David Lorfing (DLorfin@entergy.com); JACKSON, RITA R; David Bice; ENGLAND, LESLEY A; wsteelm@entergy.com Cc:
Burkhardt, Janet; Lent, Susan; Kalyanam, Kaly
Subject:
2011 Decmmissioning Funding Status Report for Arkansas Nuclear One, Units 1 & 2, Grand Gulf Nuclear Station, River Bend Station, Unit 1 and Waterford 3 Steam Electric Station Attachments:
2011 RAIs only.docx By letter dated March 31, 2011, Entergy Operations, Inc. (Entergy) submitted to the U.S.
Nuclear Regulatory Commission (NRC), on behalf of Entergy Arkansas, Inc., System Entergy Resources, Inc. and South Mississippi Electric Power Association, the 2011 Decommissioning Funding Status (DFS) report Arkansas Nuclear One, Units 1 & 2, Grand Gulf Nuclear Station, River Bend Station, Unit 1 and Waterford 3 Steam Electric Station, as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) (ML110940138). The NRC staff has determined that additional information is needed to complete the review of the Entergy Operations, Inc. 2011 DFS report. The request for additional information (RAI) is attached and was discussed with Mr. Les England of your staff on May 24, 2011, and it was agreed that a response would be provided within 30 days of receipt of this E-mail. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov or Kaly Kalyanam at (301) 415-1480 or via e-mail at Kaly.Kalyanam@nrc.gov.