Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
W3F1-2009-0030, Response to Amendment Request NPF-38-276, Core Protection Calculator Power Calibration Adjustment Limit30 June 2009Response to Amendment Request NPF-38-276, Core Protection Calculator Power Calibration Adjustment Limit
ML09182075729 June 2009Non-Disclosure Agreement for a Computer Code of the United States Nuclear Regulatory Commission
ML09177056026 June 2009IR 05000382-09-009, on 08/24/2009, Waterford Steam Electric Station, Unit 3 - Initial Information Request for NRC Triennial Baseline Component Design Bases InspectionProbabilistic Risk Assessment
Temporary Modification
ML09173013225 June 200906/07-11/2009-Report on Trip to the Institute of Electrical and Electronics Engineers Stationary Battery Committee Meeting in Rohnert Park, CAArc flash
ML09183125924 June 2009Attachment 6 to W3F1-2009-0022, HI-2094376, Rev. 0, Licensing Report for Waterford, Unit 3 Spent Fuel Pool Criticality Analysis
ML09173023422 June 2009Acceptance Review Email, License Amendment Request, Revise Technical Specification 2.1.1.1 Departure from Nucleate Boiling Ratio (DNBR) Safety Limit
ML09155069218 June 2009Entergy Louisiana, Llc'S Status of Decommissioning Funding Assurance for Waterford Steam Electric Station, Unit 3
W3F1-2009-0029, Submittal of Annual Report on Westinghouse Electric Co., LLC, Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Cy 200817 June 2009Submittal of Annual Report on Westinghouse Electric Co., LLC, Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Cy 2008
ML09166029515 June 2009Acceptance Review Email, Requests for Relief from ASME Section XI Volumetric Examination Requirements - Second 10-Year ISI Interval
TAC:ME143215 June 2009
ML09160016612 June 2009Notice of Withdrawal of an Amendment Request, Revise Facility Operating License to Add License Condition on the Extension of the Reactor Vessel Inservice Inspection Interval
ML09121037512 June 2009Relief, Request for Alternative W3-ISI-006, from Requirements of ASME Code Section XI, for Second 10-Year Inservice Inspection IntervalProbabilistic Risk Assessment
Incorporated by reference
ML09160015812 June 2009Withdrawal of an Amendment Request
ML09163015112 June 2009Acceptance Review Email, License Amendment Request, Revise Technical Specification 6.9.1.11, Core Operating Limits Report to Add New Analytical Methods to Support Implementation of Westinghouse Next Generation Fuel
ML09173028511 June 2009Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water ReactorsMission time
Coatings
ML09173028311 June 2009Email, Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors
ML0916101819 June 2009Email, Licensee'S Response to Nrr/Dss/Srxb Question Criticality Analysis
ML0913204284 June 2009License Amendment No. 220, Revise Action Statements in Technical Specification 3/4.9.6, Refueling Machine
W3F1-2009-0025, Withdrawal of License Amendment Request License Condition to Support Implementation of Extended In-Service Inspection Interval3 June 2009Withdrawal of License Amendment Request License Condition to Support Implementation of Extended In-Service Inspection Interval
W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit3 June 2009License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety LimitAnticipated operational occurrence
Fuel cladding
W3F1-2009-0026, Request for Relief from ASME Section XI Volumetric Examination Requirements - Second 10-Year Interval1 June 2009Request for Relief from ASME Section XI Volumetric Examination Requirements - Second 10-Year IntervalVT-2
Dissimilar Metal Weld
TAC:ME14261 June 2009
W3F1-2009-0020, Response to NRC Request for Additional Information the 2007 and 2008 (Refueling Outage 15) Steam Generator Tube Inspections1 June 2009Response to NRC Request for Additional Information the 2007 and 2008 (Refueling Outage 15) Steam Generator Tube Inspections
TAC:ME135922 May 2009
W3F1-2009-0017, License Amendment Request NPF-38-281 to Revise Technical Specification 6.9.1.11, Core Operating Limits Report22 May 2009License Amendment Request NPF-38-281 to Revise Technical Specification 6.9.1.11, Core Operating Limits ReportShutdown Margin
Coatings
IR 05000382/200900218 May 2009IR 05000382-09-002, on 01/01/09-4/7/09, Waterford Steam Electric Station, Unit 3; Maintenance Risk Assessments and Emergent Work Control; Plant ModificationsProbabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Severe Accident Management Guideline
Fire Protection Program
TAC:ME142413 May 2009
ML09132005912 May 2009Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207)
TAC:ME119812 May 2009
ML0913104938 May 2009Notification of NRC Initial Operator Licensing Examination 05000382/2009301
ML0908304721 May 2009Issuance of Amendment No. 219, Relocation of Technical Specification 3.7.8 and Addition of Limiting Condition for Operation 3.0.8 to Adopt TSTF-372, Inoperability of SnubbersSafe Shutdown Earthquake
Probabilistic Risk Assessment
Large early release frequency
Earthquake
W3F1-2009-0014, Transmittal of Annual Report of Individual Monitoring - NRC Form 5 for 2008 Per 1OCFR20.220630 April 2009Transmittal of Annual Report of Individual Monitoring - NRC Form 5 for 2008 Per 1OCFR20.2206
W3F1-2009-0016, Annual Radioactive Effluent Release Report - 200830 April 2009Annual Radioactive Effluent Release Report - 2008Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Annual Radiological Effluent Release Report
W3F1-2009-0015, Annual Radiological Environmental Operating Report - 200830 April 2009Annual Radiological Environmental Operating Report - 2008Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions27 April 2009Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour RestrictionsSafe Shutdown
Fitness for Duty
CNRO-2009-00007, Relief Request PWR-PT-001 for ANO, Unit 1's Fourth 10 Year Interval, and for Waterford 3's Third 10-Year Interval21 April 2009Relief Request PWR-PT-001 for ANO, Unit 1's Fourth 10 Year Interval, and for Waterford 3's Third 10-Year Interval
ML09103061217 April 2009Request for Additional Information 2007 and 2008 (Refueling Outage 15) Steam Generator Tube Inspections
ML09103014717 April 2009Request for Additional Information, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage, and Add New TS 3/4 9.12, Spent Fuel (SFP) Pool Boron Concentration
IR 05000382/200900715 April 2009IR 05000382-09-007, on 03/02/2007 - 03/06/2007, Waterford Steam Electric Station, Unit 3, Radiation Safety Team InspectionHigh Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Annual Radiological Effluent Release Report
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G13 April 2009Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML0909603276 April 2009Summary of Public Meeting with Entergy on Waterford Steam Electric Station Unit -3 2008 Performance