Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
W3F1-2009-0030, Response to Amendment Request NPF-38-276, Core Protection Calculator Power Calibration Adjustment Limit | 30 June 2009 | Response to Amendment Request NPF-38-276, Core Protection Calculator Power Calibration Adjustment Limit | |
ML091820757 | 29 June 2009 | Non-Disclosure Agreement for a Computer Code of the United States Nuclear Regulatory Commission | |
ML091770560 | 26 June 2009 | IR 05000382-09-009, on 08/24/2009, Waterford Steam Electric Station, Unit 3 - Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection | Probabilistic Risk Assessment Temporary Modification |
ML091730132 | 25 June 2009 | 06/07-11/2009-Report on Trip to the Institute of Electrical and Electronics Engineers Stationary Battery Committee Meeting in Rohnert Park, CA | Arc flash |
ML091831259 | 24 June 2009 | Attachment 6 to W3F1-2009-0022, HI-2094376, Rev. 0, Licensing Report for Waterford, Unit 3 Spent Fuel Pool Criticality Analysis | |
ML091730234 | 22 June 2009 | Acceptance Review Email, License Amendment Request, Revise Technical Specification 2.1.1.1 Departure from Nucleate Boiling Ratio (DNBR) Safety Limit | |
ML091550692 | 18 June 2009 | Entergy Louisiana, Llc'S Status of Decommissioning Funding Assurance for Waterford Steam Electric Station, Unit 3 | |
W3F1-2009-0029, Submittal of Annual Report on Westinghouse Electric Co., LLC, Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Cy 2008 | 17 June 2009 | Submittal of Annual Report on Westinghouse Electric Co., LLC, Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Cy 2008 | |
ML091660295 | 15 June 2009 | Acceptance Review Email, Requests for Relief from ASME Section XI Volumetric Examination Requirements - Second 10-Year ISI Interval | |
TAC:ME1432 | 15 June 2009 | ||
ML091600166 | 12 June 2009 | Notice of Withdrawal of an Amendment Request, Revise Facility Operating License to Add License Condition on the Extension of the Reactor Vessel Inservice Inspection Interval | |
ML091210375 | 12 June 2009 | Relief, Request for Alternative W3-ISI-006, from Requirements of ASME Code Section XI, for Second 10-Year Inservice Inspection Interval | Probabilistic Risk Assessment Incorporated by reference |
ML091600158 | 12 June 2009 | Withdrawal of an Amendment Request | |
ML091630151 | 12 June 2009 | Acceptance Review Email, License Amendment Request, Revise Technical Specification 6.9.1.11, Core Operating Limits Report to Add New Analytical Methods to Support Implementation of Westinghouse Next Generation Fuel | |
ML091730285 | 11 June 2009 | Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors | Mission time Coatings |
ML091730283 | 11 June 2009 | Email, Draft Request for Additional Information Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized Water Reactors | |
ML091610181 | 9 June 2009 | Email, Licensee'S Response to Nrr/Dss/Srxb Question Criticality Analysis | |
ML091320428 | 4 June 2009 | License Amendment No. 220, Revise Action Statements in Technical Specification 3/4.9.6, Refueling Machine | |
W3F1-2009-0025, Withdrawal of License Amendment Request License Condition to Support Implementation of Extended In-Service Inspection Interval | 3 June 2009 | Withdrawal of License Amendment Request License Condition to Support Implementation of Extended In-Service Inspection Interval | |
W3F1-2009-0021, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit | 3 June 2009 | License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit | Anticipated operational occurrence Fuel cladding |
W3F1-2009-0026, Request for Relief from ASME Section XI Volumetric Examination Requirements - Second 10-Year Interval | 1 June 2009 | Request for Relief from ASME Section XI Volumetric Examination Requirements - Second 10-Year Interval | VT-2 Dissimilar Metal Weld |
TAC:ME1426 | 1 June 2009 | ||
W3F1-2009-0020, Response to NRC Request for Additional Information the 2007 and 2008 (Refueling Outage 15) Steam Generator Tube Inspections | 1 June 2009 | Response to NRC Request for Additional Information the 2007 and 2008 (Refueling Outage 15) Steam Generator Tube Inspections | |
TAC:ME1359 | 22 May 2009 | ||
W3F1-2009-0017, License Amendment Request NPF-38-281 to Revise Technical Specification 6.9.1.11, Core Operating Limits Report | 22 May 2009 | License Amendment Request NPF-38-281 to Revise Technical Specification 6.9.1.11, Core Operating Limits Report | Shutdown Margin Coatings |
IR 05000382/2009002 | 18 May 2009 | IR 05000382-09-002, on 01/01/09-4/7/09, Waterford Steam Electric Station, Unit 3; Maintenance Risk Assessments and Emergent Work Control; Plant Modifications | Probabilistic Risk Assessment Temporary Modification Condition Adverse to Quality Significance Determination Process Severe Accident Management Guideline Fire Protection Program |
TAC:ME1424 | 13 May 2009 | ||
ML091320059 | 12 May 2009 | Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) | |
TAC:ME1198 | 12 May 2009 | ||
ML091310493 | 8 May 2009 | Notification of NRC Initial Operator Licensing Examination 05000382/2009301 | |
ML090830472 | 1 May 2009 | Issuance of Amendment No. 219, Relocation of Technical Specification 3.7.8 and Addition of Limiting Condition for Operation 3.0.8 to Adopt TSTF-372, Inoperability of Snubbers | Safe Shutdown Earthquake Probabilistic Risk Assessment Large early release frequency Earthquake |
W3F1-2009-0014, Transmittal of Annual Report of Individual Monitoring - NRC Form 5 for 2008 Per 1OCFR20.2206 | 30 April 2009 | Transmittal of Annual Report of Individual Monitoring - NRC Form 5 for 2008 Per 1OCFR20.2206 | |
W3F1-2009-0016, Annual Radioactive Effluent Release Report - 2008 | 30 April 2009 | Annual Radioactive Effluent Release Report - 2008 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report |
W3F1-2009-0015, Annual Radiological Environmental Operating Report - 2008 | 30 April 2009 | Annual Radiological Environmental Operating Report - 2008 | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions | 27 April 2009 | Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions | Safe Shutdown Fitness for Duty |
CNRO-2009-00007, Relief Request PWR-PT-001 for ANO, Unit 1's Fourth 10 Year Interval, and for Waterford 3's Third 10-Year Interval | 21 April 2009 | Relief Request PWR-PT-001 for ANO, Unit 1's Fourth 10 Year Interval, and for Waterford 3's Third 10-Year Interval | |
ML091030612 | 17 April 2009 | Request for Additional Information 2007 and 2008 (Refueling Outage 15) Steam Generator Tube Inspections | |
ML091030147 | 17 April 2009 | Request for Additional Information, License Amendment Request to Modify Technical Specification Section 5.6, Fuel Storage, and Add New TS 3/4 9.12, Spent Fuel (SFP) Pool Boron Concentration | |
IR 05000382/2009007 | 15 April 2009 | IR 05000382-09-007, on 03/02/2007 - 03/06/2007, Waterford Steam Electric Station, Unit 3, Radiation Safety Team Inspection | High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report |
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | 13 April 2009 | Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
ML090960327 | 6 April 2009 | Summary of Public Meeting with Entergy on Waterford Steam Electric Station Unit -3 2008 Performance |