Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RNP-RA/09-0103, WCAP-17091-NP, Rev. 0, H*: Alternative Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F).30 June 2009WCAP-17091-NP, Rev. 0, H*: Alternative Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F).Hydrostatic
Finite Element Analysis
Stress corrosion cracking
Operational leakage
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal
TAC:ME155019 June 2009
ML09177030919 June 2009H. B. Robinson, Unit 2 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System InstrumentationAffidavit
RNP-RA/09-0054, Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System Instrumentation19 June 2009Attachments VI & VII to Serial: RNP-RA/09-0054 - Request for Technical Specifications Change to Section 3.3.1 Reactor Protection System InstrumentationAffidavit
ML10194009817 June 2009Map of Wells and Tritium Results
IR 05000261/200950116 June 2009IR 05000261-09-501, on 05/18 - 22/2009, H. B. Robinson Steam Electric Plant, Unit 2; Exercise Evaluation and Baseline Inspection
IR 05000261/200940215 June 2009IR 05000261-09-402, on 05/22/2009, for H. B. Robinson, Unit 2Affidavit
TAC:ME82251 June 2009
ML09149031429 May 2009Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the CompanyLicense Renewal
Power change
ML09149048828 May 2009Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency
RNP-RA/09-0040, Radiological Environmental Operating Report - 200813 May 2009Radiological Environmental Operating Report - 2008Grab sample
Offsite Dose Calculation Manual
Missed surveillance
Annual Radiological Environmental Operating Report
IR 05000261/20090028 May 2009IR 05000261-09-002; on 01/01/2009-03/31/2009; Carolina Power & Light Company;, H. B. Robinson Steam Electric Plant, Unit 2, NRC Integrated Inspection Report Errata
ML0912801538 May 2009Reactor and Senior Reactor Operator Initial Examinations - H.B. Robinson Nuclear Plant 05000261-09-301
ML0912708617 May 2009Notice of Category 1 Public Meeting with Carolina Power & Light and Florida Power Corp., Regarding Brunswick Performance and Organizational Alignment within the CompanyLicense Renewal
ML0910302437 May 2009Issuance of Amendment Regarding Elimination of Work Hour Controls to Support Compliance with Revised Part 26 of Title 10 of Code of Federal Regulations
ML0912706526 May 2009Summary of Category 1 Public Meeting Discussed NRC Reactor Oversight Process Annual Assessment of H. B. Robinson, Unit 2
ML09120074530 April 2009IR 05000261-09-002; Carolina Power & Light Company; 01/01/2009 - 03/31/2009; H. B. Robinson Steam Electric Plant, Unit 2, NRC Integrated Inspection ReportBoric Acid
Offsite Dose Calculation Manual
Fire Barrier
Met Tower
Temporary Modification
Significance Determination Process
Job Performance Measure
Annual Radioactive Effluent Release Report
Foreign Material Exclusion
Process Control Program
Operability Determination
Hemyc
Maintenance Rule Program
Fire Watch
Operational leakage
ML09117034530 April 2009Request for Relief from ASME Code, Section XI, Subsection IWE Requirements for Containment InspectionsCoatings
Incorporated by reference
Moisture barrier
RA-09-004, Submittal of Evidence of Guarantee of Payment of Deferred Premiums23 April 2009Submittal of Evidence of Guarantee of Payment of Deferred PremiumsAffidavit
RNP-RA/09-0034, Annual Radioactive Effluent Release Report22 April 2009Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Tritium
Exclusive Use
Press Release-II-09-024, NRC Schedules Meeting to Discuss 2008 Performance of Robinson Nuclear Power Plant22 April 2009Press Release-II-09-024: NRC Schedules Meeting to Discuss 2008 Performance of Robinson Nuclear Power PlantOpen House
RNP-RA/09-0024, Transmittal of Technical Specifications Bases Revisions16 April 2009Transmittal of Technical Specifications Bases RevisionsSafe Shutdown
High Radiation Area
Hydrostatic
RNP-RA/09-0035, Report of Changes to or Errors Discovered in an Acceptable Loss-of-coolant Accident Evaluation Model Application for the Emergency Core Cooling System16 April 2009Report of Changes to or Errors Discovered in an Acceptable Loss-of-coolant Accident Evaluation Model Application for the Emergency Core Cooling System
L-88-009, Status Update for NRC Bulletin 88-09, Thimble Tube Thinning in Westinghouse Reactors.13 April 2009Status Update for NRC Bulletin 88-09, Thimble Tube Thinning in Westinghouse Reactors.
ML0909605936 April 2009Notice of Meeting with Carolina Power & Light Company to Discuss the NRC Reactor Oversight Process Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2Open House