Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML091811030 | 30 June 2009 | Startup Report for the Installation of Areva Np, Inc. Advanced Mark-BW(A) Fuel Assemblies in Braidwood Unit 1 Cycle 15 | |
IR 05000456/2009402 | 25 June 2009 | IR 05000456-09-402, 05000457-09-402, on 01/20/2009 - 01/22/2009, Exelon Nuclear Corporate, 05/18/2009 - 05/22/2009, Braidwood Nuclear Power Station, Routine Security Baseline Inspection, Cover Ltr. Only | Affidavit |
ML100321537 | 25 June 2009 | 2009 Braidwood Station Initial Examination Outline Submittal | |
RS-09-071, Units 1 and 2 - License Amendment Request to Revise Technical Specifications (TS) for Permanent Alternate Repair Criteria | 24 June 2009 | Units 1 and 2 - License Amendment Request to Revise Technical Specifications (TS) for Permanent Alternate Repair Criteria | Safe Shutdown Earthquake Nondestructive Examination |
ML091310627 | 19 June 2009 | Request for Additional Information Related to Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification | |
TAC:ME0489 | 18 June 2009 | ||
TAC:ME0497 | 18 June 2009 | ||
ML091600240 | 18 June 2009 | Company, Llc'S Status of Decommissioning Funding Assurance | |
ML091600194 | 18 June 2009 | Company, Llc'S Status of Decommissioning Funding Assurance | |
ML091690295 | 17 June 2009 | Email Braidwood End of Cycle Meeting with A. Gerstung | |
ML091390174 | 10 June 2009 | Company - Branch Chief Reassignment | |
ML091490142 | 9 June 2009 | Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes | |
RS-09-070, Comment (12) of Darin M. Benyak, on Behalf of Exelon Generation Company, LLC, on ANPR 171, Variable Annual Fee Structure for Power Reactors | 3 June 2009 | Comment (12) of Darin M. Benyak, on Behalf of Exelon Generation Company, LLC, on ANPR 171, Variable Annual Fee Structure for Power Reactors | Exemption Request |
TAC:ME1613 | 31 May 2009 | ||
ML091770546 | 31 May 2009 | WCAP-17072-NP, Revision 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model D5), Attachment 9 | Hydrostatic Finite Element Analysis |
RS-09-062, Stations, Units 1 & 2 - Response to Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents | 29 May 2009 | Stations, Units 1 & 2 - Response to Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents | Safe Shutdown Operating Basis Earthquake Earthquake |
ML091480561 | 27 May 2009 | Summary of the Public Meeting to Discuss the Braidwood Station, Units 1 and 2, End-of-Cycle Plant Performance Assessment | |
ML091690657 | 27 May 2009 | Email Correspondence Between S. Orth USNRC R3 and W. Alderson on 5/27/09 Braidwood End of Cycle Meeting | |
ML091690661 | 27 May 2009 | Email Correspondence Between S. Orth USNRC R3 and A. Gerstung on 5/27/09 Braidwood End of Cycle Meeting | |
ML091460796 | 21 May 2009 | EOC Public Meeting Slides from Meeting 5/21/09 | |
ML091460800 | 21 May 2009 | EOC Licensee Presentation Slides from 5/21/09 Meeting | |
ML091390368 | 21 May 2009 | Correction Pages to Amendment Nos. 158 and 163 | |
TAC:ME1029 | 15 May 2009 | ||
RS-09-061, Response to Request for Additional Information Re Spring 2008 Refueling Outage Steam Generator Tube Inspections | 15 May 2009 | Response to Request for Additional Information Re Spring 2008 Refueling Outage Steam Generator Tube Inspections | |
ML091350188 | 14 May 2009 | 2008 Annual Radiological Environmental Operating Report, Submitted in Accordance with Technical Specification 5.6.2 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
Press Release-III-09-016, NRC to Hold Public Meetings to Discuss Performance Assessment for Braidwood Nuclear Power Plant | 13 May 2009 | Press Release-III-09-016: NRC to Hold Public Meetings to Discuss Performance Assessment for Braidwood Nuclear Power Plant | |
ML091380285 | 13 May 2009 | Upcoming Inspections of the Braidwood Station Independent Spent Fuel Storage Installation | |
IR 05000456/2009002 | 13 May 2009 | IR 05000456-09-002, 05000457-09-002; on 01/01/2009 - 03/31/2009; Braidwood Station, Units 1 & 2. Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications; Followup of Events | Non-Destructive Examination Offsite Dose Calculation Manual Past operability Temporary Modification Significance Determination Process Annual Radioactive Effluent Release Report Operability Determination Fire Protection Program |
ML091260242 | 11 May 2009 | RAI Related to risk-informed Relief Request 13R-01 | Dissimilar Metal Weld |
RS-14-029, Transmittal of Application for an Incidental Take Permit for Threatened or Endangered Species and Conservation Plan | 11 May 2009 | Transmittal of Application for an Incidental Take Permit for Threatened or Endangered Species and Conservation Plan | |
ML14030A278 | 11 May 2009 | Transmittal of Application for an Incidental Take Permit for Threatened or Endangered Species and Conservation Plan | |
ML091060776 | 11 May 2009 | Issuance of License Amendments Emergency Diesel Generator Start Time Surveillance Requirements | Safe Shutdown Anticipated operational occurrence Fire Protection Program |
TAC:ME1066 | 8 May 2009 | ||
ML090710330 | 30 April 2009 | Corp., Request for Withholding Information from Public Disclosure | |
ML091330372 | 30 April 2009 | 2008 Radioactive Effluent Release Report Submitted in Accordance with 10 CFR 50.36a | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
RS-09-052, Submittal of Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans | 27 April 2009 | Submittal of Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans | |
ML091520643 | 21 April 2009 | Tritium Groundwater Sample Results from American Radiation Services, Inc. for Braidwood 1st Quarter, March 10 and 11, 2009 | |
ML091060613 | 15 April 2009 | Application Accepted - Braidwood/Byron LAR to Change Fire Prot Prog for Ucsr (ME0971-74) | Fire Protection Program |
ML091060460 | 15 April 2009 | Application Accepted - Braidwood Relief Request I2R-50 Re. ISI Exam Coverage | |
ML090960135 | 15 April 2009 | Request for Additional Information Related to Generic Letter 2004-02 | |
RS-09-051, Annual 10 CFR 50 .46 Report of the Emergency Core Cooling System Evaluation Model Changes and Errors | 9 April 2009 | Annual 10 CFR 50 .46 Report of the Emergency Core Cooling System Evaluation Model Changes and Errors | |
ML090970911 | 7 April 2009 | Core Operating Limits Report, Unit 1, Cycle 15 | Shutdown Margin |
ML090980411 | 3 April 2009 | Notice of Public Meeting with Exelon Generation Company, LLC, to Discuss NRC End-of-Cycle Assessment of Braidwood Station Units 1 and 2 Performances for the 2008 Calendar Year | |
ML090980155 | 3 April 2009 | EOC Meeting Letter to Licensee for Meeting 5/21/09 | |
ML090890593 | 2 April 2009 | RAI, 2008 Steam Generator Tube Inservice Inspections | |
ML090920256 | 1 April 2009 | Annual Property Insurance Status Report |