NRC Generic Letter 1988-05 | 17 March 1988 | NRC Generic Letter 1988-005: Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants | Miraglia F Office of Nuclear Reactor Regulation | |
NRC Generic Letter 1988-07 | 7 April 1988 | NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants. | Miraglia F Office of Nuclear Reactor Regulation | |
ML20197D604 | 31 May 1988 | Responds to Generic Ltr 88-05 Re Boric Acid Effect on Carbon Steel Components.Actions to Prevent Recurrence of Boric Acid Corrosion Include Use of Deviation Repts as Directed in VT-2 Procedure for Cases of Pressure Boundary Degradation | Exelon Morgan W | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) Davis A |
NRC Generic Letter 1988-12, Removal of Fire Protection Requirements from Technical Specification | 2 August 1988 | NRC Generic Letter 1988-012: Removal of Fire Protection Requirements from Technical Specifications | Miraglia F Office of Nuclear Reactor Regulation | |
IR 05000454/1988011 | 19 August 1988 | Safety Insp Repts 50-454/88-11 & 50-455/88-11 on 880701- 0815.Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletin Followup,Operations Summary,Training,Refueling,Surveillance & Maint | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) Hinds J | |
IR 05000454/1988016 | 5 October 1988 | Safety Insp Repts 50-454/88-16 & 50-455/88-15 on 880816- 0930.Violations Noted.Major Areas Inspected:Previous Insp Findings,Operations Summary,Training & Refueling & Spent Fuel Pit Activities | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) Hinds J | |
NRC Generic Letter 1991-17 | 17 October 1991 | NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants. | Partlow J Office of Nuclear Reactor Regulation | |
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion. | 5 January 1995 | Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion. | Grimes B Office of Nuclear Reactor Regulation | |
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion. | 5 January 1995 | Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion. | Grimes B K Office of Nuclear Reactor Regulation | |
ML20196J497 | 30 July 1997 | Forwards Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations, | Exelon Hosmer J | Office of Information Resources Management |
ML20199C123 | 13 January 1998 | Safety Evaluation Granting Second 10-yr Inservice Insp Program Plan Relief Request | NRC (Affiliation Not Assigned) | |
ML20236W120 | 29 July 1998 | Submits Rev 2 of Relief Request I2R-11, Alternate Rules for Insulation Removal at Bolted Connections in Sys Borated for Purpose of Controlling Reactivity, for NRC Approval | Exelon Graesser K | Office of Information Resources Management |
ML20155C630 | 22 October 1998 | Forwards Relief Requests I2R-24 Re Alternative for Sequence of Second Interval Examinations of shell-to-weld of Reactor Vessel & I2R-34 Re Alternatives to Insp of Bolted Connections | Exelon Graesser K | Office of Information Resources Management |
ML20204G383 | 19 March 1999 | Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 | NRC (Affiliation Not Assigned) | |
ML20205B509 | 26 March 1999 | SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 | NRC (Affiliation Not Assigned) | |
RS-02-061, Three Mile, Unit 1, Braidwood, Units 1 & 2, Byron, Units 1 & 2 - Exelon/Amergen Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 1 April 2002 | Three Mile, Unit 1, Braidwood, Units 1 & 2, Byron, Units 1 & 2 - Exelon/Amergen Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Exelon Jamie Benjamin | Office of Nuclear Reactor Regulation Document Control Desk |
RS-02-091, Exelon/Amergen Sixty-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity. | 17 May 2002 | Exelon/Amergen Sixty-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity. | Exelon Jamie Benjamin | Office of Nuclear Reactor Regulation Document Control Desk |
ML023220659 | 20 November 2002 | RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degration & Reactor Coolant Pressure Boundary Integrity, 60-Day Response | Mahesh Chawla NRC/NRR/DLPM/LPD3 | Exelon Skolds J |
RS-03-007, Exelon/Amergen Response to Request for Additional Information Regarding NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 21 January 2003 | Exelon/Amergen Response to Request for Additional Information Regarding NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Exelon AmerGen Jamie Benjamin | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2003-0025, Regulatory Commitment Change Summary Report | 1 April 2003 | Regulatory Commitment Change Summary Report | Exelon Lopriore R | Office of Nuclear Reactor Regulation Document Control Desk |
RS-03-176, Thirty-Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | 22 September 2003 | Thirty-Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Head Penetrations and Reactor Coolant Pressure Boundary Integrity. | Exelon AmerGen Jury K | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2004-0004, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12) | 12 January 2004 | Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12) | Exelon Kuczynski S | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2004-0077, Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11) | 2 July 2004 | Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11) | Exelon Kuczynski S | Office of Nuclear Reactor Regulation Document Control Desk |
IR 05000454/2005003 | 4 May 2005 | IR 05000454-05-003; IR 05000455-05-003 on 01/01/2005-03/31/2005 for Byron Station, Units 1 and 2; Post Maintenance Testing, Surveillance Testing, Access Control to Radiologically Significant Areas, Event Followup, Other Activities | NRC/RGN-III/DRP/RPB3 Passehl D | Exelon Crane C |
BYRON 2005-0073, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1 | 20 June 2005 | Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1 | Exelon Kuczynski S | Office of Nuclear Reactor Regulation Document Control Desk |
ML060390424 | 3 February 2006 | IR 05000454-05-011; 05000455-05-011; on 10/01/2005-12/31/2005; Byron Station, Units 1 and 2; Inservice Inspection Activities, Permanent Plant Modification, Emergency Action Level and Emergency Plan Changes | Richard Skokowski NRC/RGN-III/DRP/RPB3 | Exelon Crane C |
BYRON 2006-0027, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval | 14 February 2006 | Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval | Exelon Hoots D | Office of Nuclear Reactor Regulation Document Control Desk |
ML070180609 | 5 January 2007 | Inservice Inspection Summary Report for Inspection Activities from March 26, 2005 to October 16, 2006 | Exelon | Office of Nuclear Reactor Regulation |
IR 05000454/2006005 | 12 February 2007 | IR 05000454-06-005, 05000455-06-005; 10/01/2006-12/31/2006; Byron Station, Units 1 and 2; Identification and Resolution of Problems | Richard Skokowski NRC/RGN-III/DRP/RPB3 | Exelon Crane C |
ML072120484 | 10 July 2007 | B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Cover Through Section 3.0 Page 1 of 8 | Exelon | Office of Nuclear Reactor Regulation |
IR 05000454/2007003 | 8 August 2007 | IR 05000454-07-003 and 05000455-07-003; on 03/01/2007 - 06/30/2007; Byron Station, Units 1 and 2; Fire Protection, Inservice Inspection Activities, Operability Evaluations, and Refueling and Outage Activities | Richard Skokowski NRC/RGN-III/DRP/RPB3 | Exelon Crane C |
BYRON 2008-0067, Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15) | 11 July 2008 | Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15) | Exelon Hoots D | Office of Nuclear Reactor Regulation Document Control Desk |
ML090260075 | 22 January 2009 | Inservice Inspection Report for Interval 3, Period 1, (B2R14), Cover Through Section 2.0 | Exelon Hoots D M | Office of Nuclear Reactor Regulation Document Control Desk |
ML100050357 | 5 January 2010 | 90-Day Inservice Inspection Report for Interval 3, Period 1, (B1R16) | Exelon Enright D J | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2010-0042, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15) | 3 August 2010 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15) | Exelon Enright D | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2011-0103, Day Inservice Inspection Report for Interval 3, Period 2, (B1R17) | 21 July 2011 | Day Inservice Inspection Report for Interval 3, Period 2, (B1R17) | Exelon Tulon T | Office of Nuclear Reactor Regulation Document Control Desk |
RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual | 14 December 2012 | Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual | Exelon | Office of Nuclear Material Safety and Safeguards Office of Nuclear Reactor Regulation |
ML13004A068 | 14 December 2012 | Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual | Exelon | Office of Nuclear Material Safety and Safeguards Office of Nuclear Reactor Regulation |
ML13008A077 | 3 January 2013 | Inservice Inspection Summary Report, for Inspection Activities from April 24, 2011 to October 8, 2012 | Exelon | Office of Nuclear Reactor Regulation |
BYRON 2013-0100, Day Inservice Inspection Report for Interval 3, Period 3, (B2R17) | 29 July 2013 | Day Inservice Inspection Report for Interval 3, Period 3, (B2R17) | Exelon Kearney F | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19) | 24 June 2014 | Day Inservice Inspection Report for Interval 3, Period 3, (B1R19) | Exelon Kearney F | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18) | 21 January 2015 | 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18) | Exelon Kearney F | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2015-0152, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20) | 29 December 2015 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20) | Exelon Chalmers T | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2016-0076, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19) | 11 August 2016 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19) | Exelon Kanavos M | Office of Nuclear Reactor Regulation Document Control Desk |
ML16300A036 | 26 October 2016 | Fourth Ten-Year Interval Inservice Inspection Program | Exelon Kanavos M | Office of Nuclear Reactor Regulation Document Control Desk |
RS-16-248, Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual | 15 December 2016 | Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual | Exelon | Office of Nuclear Material Safety and Safeguards Office of Nuclear Reactor Regulation |
ML16357A549 | 15 December 2016 | Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual | Exelon | Office of Nuclear Material Safety and Safeguards Office of Nuclear Reactor Regulation |
BYRON 2017-0048, Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21) | 15 June 2017 | Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21) | Exelon Kanavos M | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2018-0002, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20) | 18 January 2018 | Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20) | Exelon Chalmers T | Office of Nuclear Reactor Regulation Document Control Desk |
BYRON 2020-0008, 2019 Regulatory Commitment Change Summary Report | 7 February 2020 | 2019 Regulatory Commitment Change Summary Report | Exelon Welt H | Office of Nuclear Reactor Regulation Document Control Desk |