Semantic search

Jump to navigation Jump to search
 Issue dateTitleFromTo
NRC Generic Letter 1988-0517 March 1988NRC Generic Letter 1988-005: Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR PlantsMiraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1988-077 April 1988NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.Miraglia F
Office of Nuclear Reactor Regulation
ML20197D60431 May 1988Responds to Generic Ltr 88-05 Re Boric Acid Effect on Carbon Steel Components.Actions to Prevent Recurrence of Boric Acid Corrosion Include Use of Deviation Repts as Directed in VT-2 Procedure for Cases of Pressure Boundary DegradationExelon
Morgan W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Davis A
NRC Generic Letter 1988-12, Removal of Fire Protection Requirements from Technical Specification2 August 1988NRC Generic Letter 1988-012: Removal of Fire Protection Requirements from Technical SpecificationsMiraglia F
Office of Nuclear Reactor Regulation
IR 05000454/198801119 August 1988Safety Insp Repts 50-454/88-11 & 50-455/88-11 on 880701- 0815.Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletin Followup,Operations Summary,Training,Refueling,Surveillance & MaintNRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Hinds J
IR 05000454/19880165 October 1988Safety Insp Repts 50-454/88-16 & 50-455/88-15 on 880816- 0930.Violations Noted.Major Areas Inspected:Previous Insp Findings,Operations Summary,Training & Refueling & Spent Fuel Pit ActivitiesNRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Hinds J
NRC Generic Letter 1991-1717 October 1991NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants.Partlow J
Office of Nuclear Reactor Regulation
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion.5 January 1995Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion.Grimes B
Office of Nuclear Reactor Regulation
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion.5 January 1995Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion.Grimes B K
Office of Nuclear Reactor Regulation
ML20196J49730 July 1997Forwards Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations,Exelon
Hosmer J
Office of Information Resources Management
ML20199C12313 January 1998Safety Evaluation Granting Second 10-yr Inservice Insp Program Plan Relief RequestNRC (Affiliation Not Assigned)
ML20236W12029 July 1998Submits Rev 2 of Relief Request I2R-11, Alternate Rules for Insulation Removal at Bolted Connections in Sys Borated for Purpose of Controlling Reactivity, for NRC ApprovalExelon
Graesser K
Office of Information Resources Management
ML20155C63022 October 1998Forwards Relief Requests I2R-24 Re Alternative for Sequence of Second Interval Examinations of shell-to-weld of Reactor Vessel & I2R-34 Re Alternatives to Insp of Bolted ConnectionsExelon
Graesser K
Office of Information Resources Management
ML20204G38319 March 1999Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11NRC (Affiliation Not Assigned)
ML20205B50926 March 1999SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2NRC (Affiliation Not Assigned)
RS-02-061, Three Mile, Unit 1, Braidwood, Units 1 & 2, Byron, Units 1 & 2 - Exelon/Amergen Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.1 April 2002Three Mile, Unit 1, Braidwood, Units 1 & 2, Byron, Units 1 & 2 - Exelon/Amergen Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Exelon
Jamie Benjamin
Office of Nuclear Reactor Regulation
Document Control Desk
RS-02-091, Exelon/Amergen Sixty-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity.17 May 2002Exelon/Amergen Sixty-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity.Exelon
Jamie Benjamin
Office of Nuclear Reactor Regulation
Document Control Desk
ML02322065920 November 2002RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degration & Reactor Coolant Pressure Boundary Integrity, 60-Day ResponseMahesh Chawla
NRC/NRR/DLPM/LPD3
Exelon
Skolds J
RS-03-007, Exelon/Amergen Response to Request for Additional Information Regarding NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.21 January 2003Exelon/Amergen Response to Request for Additional Information Regarding NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Exelon
AmerGen
Jamie Benjamin
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2003-0025, Regulatory Commitment Change Summary Report1 April 2003Regulatory Commitment Change Summary ReportExelon
Lopriore R
Office of Nuclear Reactor Regulation
Document Control Desk
RS-03-176, Thirty-Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Head Penetrations and Reactor Coolant Pressure Boundary Integrity.22 September 2003Thirty-Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Head Penetrations and Reactor Coolant Pressure Boundary Integrity.Exelon
AmerGen
Jury K
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2004-0004, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12)12 January 2004Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (81 R12)Exelon
Kuczynski S
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2004-0077, Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11)2 July 2004Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11)Exelon
Kuczynski S
Office of Nuclear Reactor Regulation
Document Control Desk
IR 05000454/20050034 May 2005IR 05000454-05-003; IR 05000455-05-003 on 01/01/2005-03/31/2005 for Byron Station, Units 1 and 2; Post Maintenance Testing, Surveillance Testing, Access Control to Radiologically Significant Areas, Event Followup, Other ActivitiesNRC/RGN-III/DRP/RPB3
Passehl D
Exelon
Crane C
BYRON 2005-0073, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 120 June 2005Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1Exelon
Kuczynski S
Office of Nuclear Reactor Regulation
Document Control Desk
ML0603904243 February 2006IR 05000454-05-011; 05000455-05-011; on 10/01/2005-12/31/2005; Byron Station, Units 1 and 2; Inservice Inspection Activities, Permanent Plant Modification, Emergency Action Level and Emergency Plan ChangesRichard Skokowski
NRC/RGN-III/DRP/RPB3
Exelon
Crane C
BYRON 2006-0027, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval14 February 2006Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection IntervalExelon
Hoots D
Office of Nuclear Reactor Regulation
Document Control Desk
ML0701806095 January 2007Inservice Inspection Summary Report for Inspection Activities from March 26, 2005 to October 16, 2006ExelonOffice of Nuclear Reactor Regulation
IR 05000454/200600512 February 2007IR 05000454-06-005, 05000455-06-005; 10/01/2006-12/31/2006; Byron Station, Units 1 and 2; Identification and Resolution of ProblemsRichard Skokowski
NRC/RGN-III/DRP/RPB3
Exelon
Crane C
ML07212048410 July 2007B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Cover Through Section 3.0 Page 1 of 8ExelonOffice of Nuclear Reactor Regulation
IR 05000454/20070038 August 2007IR 05000454-07-003 and 05000455-07-003; on 03/01/2007 - 06/30/2007; Byron Station, Units 1 and 2; Fire Protection, Inservice Inspection Activities, Operability Evaluations, and Refueling and Outage ActivitiesRichard Skokowski
NRC/RGN-III/DRP/RPB3
Exelon
Crane C
BYRON 2008-0067, Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15)11 July 2008Day Inservice Inspection Report for Interval 3, Period 1, Outage 2 (B1R15)Exelon
Hoots D
Office of Nuclear Reactor Regulation
Document Control Desk
ML09026007522 January 2009Inservice Inspection Report for Interval 3, Period 1, (B2R14), Cover Through Section 2.0Exelon
Hoots D M
Office of Nuclear Reactor Regulation
Document Control Desk
ML1000503575 January 201090-Day Inservice Inspection Report for Interval 3, Period 1, (B1R16)Exelon
Enright D J
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2010-0042, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15)3 August 2010Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15)Exelon
Enright D
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2011-0103, Day Inservice Inspection Report for Interval 3, Period 2, (B1R17)21 July 2011Day Inservice Inspection Report for Interval 3, Period 2, (B1R17)Exelon
Tulon T
Office of Nuclear Reactor Regulation
Document Control Desk
RS-12-221, Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements Manual14 December 2012Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Technical Requirements ManualExelonOffice of Nuclear Material Safety and Safeguards
Office of Nuclear Reactor Regulation
ML13004A06814 December 2012Updated Final Safety Analysis Report, Revision 14, Technical Requirements ManualExelonOffice of Nuclear Material Safety and Safeguards
Office of Nuclear Reactor Regulation
ML13008A0773 January 2013Inservice Inspection Summary Report, for Inspection Activities from April 24, 2011 to October 8, 2012ExelonOffice of Nuclear Reactor Regulation
BYRON 2013-0100, Day Inservice Inspection Report for Interval 3, Period 3, (B2R17)29 July 2013Day Inservice Inspection Report for Interval 3, Period 3, (B2R17)Exelon
Kearney F
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19)24 June 2014Day Inservice Inspection Report for Interval 3, Period 3, (B1R19)Exelon
Kearney F
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18)21 January 201590-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18)Exelon
Kearney F
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2015-0152, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20)29 December 2015Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20)Exelon
Chalmers T
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2016-0076, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19)11 August 2016Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19)Exelon
Kanavos M
Office of Nuclear Reactor Regulation
Document Control Desk
ML16300A03626 October 2016Fourth Ten-Year Interval Inservice Inspection ProgramExelon
Kanavos M
Office of Nuclear Reactor Regulation
Document Control Desk
RS-16-248, Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements Manual15 December 2016Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements ManualExelonOffice of Nuclear Material Safety and Safeguards
Office of Nuclear Reactor Regulation
ML16357A54915 December 2016Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Requirements ManualExelonOffice of Nuclear Material Safety and Safeguards
Office of Nuclear Reactor Regulation
BYRON 2017-0048, Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21)15 June 2017Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (BYR21)Exelon
Kanavos M
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2018-0002, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20)18 January 2018Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3 and Interval 4, Period 1, (B2R20)Exelon
Chalmers T
Office of Nuclear Reactor Regulation
Document Control Desk
BYRON 2020-0008, 2019 Regulatory Commitment Change Summary Report7 February 20202019 Regulatory Commitment Change Summary ReportExelon
Welt H
Office of Nuclear Reactor Regulation
Document Control Desk