Forwards Relief Requests I2R-24 Re Alternative for Sequence of Second Interval Examinations of shell-to-weld of Reactor Vessel & I2R-34 Re Alternatives to Insp of Bolted Connections
ML20155C630
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/22/1998
From: Graesser K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BYRON-98-0284, BYRON-98-284, NUDOCS 9811020298
Download: ML20155C630 (10)


Text

-

Cornmonwe.ihh I:dimn Conipany

. II) ton Generating Station 4150 North Gernian ( huri,h Road II) ron. II. 6 t Ol(I9N 6 lel Hib* M i ll l

October 22,1998 1

-1 I

LTR: BYRON-98-0284 i FILE: 2.01.0700 I l

l U.S. Nuclear Regulatory Commission I ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Second 10 Year Inservice Inspection Program Byron Station Relief Requests 12R-24, Revision 0 " Deferral of Volumetric Examinations on the Shell-to-Flange Weld of the Reactor Vessel", and 12R-34, Revision 0 " Alternative Rules for Insulation Removal at Bolted Connections in Systems Borated for the Purpose of Controlling Reactivity."

Byron Station, Units 1 and 2 Facility Operating Licenses Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 l e

Reference:

NRC Letter, " Evaluation of the Second 10 Year Interval Inservice Inspection Program Request for Relief 12R-30 for Braidwood Station,"

dated October 2,1998.

l Attached are two requests for relief from the requirements of the American Society of Nicchanical Engineers Boiler and Pressure Vessel Code (ASN1E Code). '

10CFR50.55a(a)(3)(ii) allows for ASN1E Code reliefif compliance with the specified requirements of the Code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

Relief Request 12R-24, Revision 0, requests exemption from the requirements of ASN1E Code Section XI, Subsection IWB-2420(a). This subsection states "the sequence o/ component examinations established during thefirst inspection interval shall be repeated during each p\

successive interval, to the extent practical,"

.e s r O 991102029898102b

PDR G ADOCK 05000454 ppg PA98byttrs'980284. doc A Unicorn Company

The intent of Relief Rcquest 12R-24 is to provide acceptable alternative for the sequence of the second interval examinations of the shell-to-flange weld of the Reactor Vessel.

10CFR5035a(a)(3)(i) allows for ASME Code relief on the basis that the proposed alternative provides an acceptable level of quality and safety. Relief Request 12R-34, Revision 0, requests exemption from the requirements of ASME Code Section XI, Subsection IWA-5242. This subsection states the following, "For systems boratedfor the purpose ofcontrolling reactivity, insidation shall be removedfrom pressure retaining bolted connectionsfor visual examination VT-2."

The intent of Relief Request 12R-34 is to provide acceptable alternatives to inspection of bolted connections under IWA-5242(a) of ASME Code Section XI,1989 Edition. The relief request is applicable to ASME Class I piping systems that are borated for the purpose of controlling reactivity. Please note, the proposed alternatives and bases are similar to a Braidwood Station j Relief Request 12R-30 recently approved in the referenced letter.

Upon approval of these Relief Requests, Byron Station commits to implementing the requirements  !

delineated in the proposed alternative provisions section of the requests. Any other actions l

described in these relief requests represent intended or planned actions by Byron Station. They are ,

described for the NRC's information and are not regulatory commitments.  !

l Byron Station respectfully requests NRC review by M. .h 1,1999 to take advantage of the relief requests in the next Byron Unit I refuel outage, DIR09. Please address any comments or questions regarding this matter to B.J. Adams at (815) 234-5441, extension 2280.

1 Sincerely, I

f -

K. L. Graesser Site Vice President Byron Nuclear Power Station KLG/JL/cb Attachments cc: NRC Regional Administrator, Rill Senior Resident inspector, Byron Byron Project Manager, NRR I

P;'98by ttrs'980284. doc

', Revision 0

)

l l

BYRON STATION UNITS 1 & 2 SECOND INTERVAL '

ISI PROGRAM PLAN-NRC SUBMITTAL j RELIEF REQUEST 12R-24  ;

(Page1of4) l COMPONENT IDENTIFICATION l Code Class: 1

References:

IWB-2420 (a), IWB-2500, Table IWB-2500-1 Examination Categories: B-A Item Numbers: Bl.30

Description:

Deferral of Volumetric Examinations on the Shell-to-Flange Weld of the Reactor Vessel Component Numbers: Unit 1: 1RC-01-R, WR-7 Unit 2: 2RC-01-R, WR-7 l

CODE REOUIREMENT  ;

1 ASME Section XI,1989 Edition, IWB-2420 (a) states that the sequence of component examinations established during the first inspection interval shall be repeated during the  ;

each successive inspection interval, to the extent practical. l Table IWB-2500-1, Examination Category B-A, Item Bl.30, requires a volumetric examination of essentially 100% of the reactor vessel shell-to-flange weld once each ten-year inspection interval. The requirements are modified by the following conditions.

a) Table IWB-2500-1 allows partial deferral to the end of the interval allowed l (Note 3 referenced).

b) Note (3): "If partial examinations are conducted from flange face, the I remaining volumetric examinations required to be conducted from vessel wall may be performed at or near the end of each inspection interval."

c) Note (4): "The examination of shell-to-flange welds may be performed during l the first and third inspection periods in conjunction with the nozzle l examinations of Examination Category B-D (Program B). At least 50% of the i shell-to-flange welds shall be examined by the end of the first inspection period, and the remainder by the end of the third inspection period."

P398byltrr980234. doc

Revision 0 BYRON STATION UNITS 1 & 2 SECOND INTERVAL ISI PROGRAM PLAN-NRC SUBMITTAL RELIEF REQUEST 12R-24 (Page 2 of 4)

CODE REOUIREMENTS FROM WillCll RELIEF IS REOUESTED Reliefis Requested from the requirements ofIWB-2420(a) to repeat the sequence of examinations as established in the First Inspection Interval and from Table IWB-2500-1, Examination Category B-A, Note (4) to require a volumetric examination from the flange face.

BASIS FOR RELIEF Pursuant to 10 CFR 50.55a(a)(3)(ii), reliefis requested on the basis that the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level quality and safety.

Reliefis requested to defer the entire reactor vessel shell to-flange vessel weld examination to the end of Byron Station's second ten-year inspection interval to coincide with the examinations of other reactor vessel shell and nozzle-to-vessel welds. The automated equipment necessary for the vessel shell and nozzle-to-vessel weld examinations can also be used to satisfy the examination of the shell-to-flange weld.

Mobilizing this automated equipment to perform a partial examination in the first period would constitute an economic and schedule hardship, in the First inspection Interval, this weld was examined twice (in the First Period and again in the Third Period). The first time was a partial examination from the flange face performed manually. The second time was a complete examination from the vessel interior performed with automated equipment. This relief requests that the examination only be perfomied at the end of the inten>al.

Byron Station believes that performing a partial examination of the reactor vessel shell-to flange weld in the first period of the second inspection interval would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety for the following reasons:

a) Personnel Safety: Volumetric examination of these welds from the flange would typically be performed manually, requiring inspection personnel to position themselves under a suspended reactor vessel head. The reactor head is used as shielding for dose reduction. This situation is a potential safety hazard, which can be avoided by deferring the examination of 100% of this weld to the end of the interval. The examination of this weld at the end of the interval would be PA98by hrs \980284. doc

Revision 0 BYRON STATION UNITS 1 & 2 SECOND INTERVAL ISI PROGRAM PLAN-NRC SUBMITTAL RELIEF REQUEST 12R-24 (Page 3 of 4) b) Radiation Exposure: As mentioned above, this inspection is performed in a radiation area and significant shielding (the reactor head) is necessary for dose reduction. During refueling outage B2R07, dose rates at the center of the flange were measured at 1.5 to 2.0 REM per hour. Even with the reactor head as shielding, the dose rates ranged from approximately 0.5 to 1.0 REM per hour.

c) The ccst of scheduling automated equipment to perform an examination that would not meet the requirements of ASME Section XI would be an unnecessary burden on station resources.

From an industry perspective, the deferral of Byron Station's shell-to-flange volumetric examinations to the end of the second inspection interval will not decrease the level of quality and safety because Pressurized Water Reactor (PWR) vessels similar to Byron Station's have been operating for over 20 years with no recorded inservice induced flaws or potential degradation mechanisms. Since each PWR vessel in operation is representative of the operating conditions throughout the industry, continued inspection of these vessels ensures that any potential degradation mechanism will be detected.

Performing all the automated reactor vessel examinations during a single refueling outage improves consistency of the examinations by utilizing the same equipment, personnel, and procedures. Moreover, this improves the reliability and reproducibility of the examinations. Based on lack of any previous indications in the flange-to-shell weld, requiring the inspection of only the flange-to-shell weld during the first period would constitute a safety, exposure, economic and schedule hardship without a compensating increase in quality or safety.

In addition, Byron Station believes that deferral of the examination of the reactor vessel shell-to-flange weld to the end of the second inspection interval will provide an acceptable level of safety and quality for the following reasons:

a) The purpose of Table IWB-2500-1, Examination Category B-A, Note (4) is to permit the licensee to combine the examinations of the flange-to-shell from the flange surface and the vessel-to-nozzle welds, since both examinations could use automated scanning equipment.

Ps98byttrst 980281 doc

Revision 0 BYRON STATION UNITS 1 & 2 SECOND INTERVAL ISI PROGRA 5 PLAN-NRC SUBMITTAL RELIEF REQUEST 12R-24 i (Pt je 4 of 4) 1 l

b) Both of Byron Station's reactor vessel shell to-llange welds were 100%

volumetrically examined during the Third Period of the First Inspection Interval. The 100% coverage obtained by this examination was independent of  ;

the First Period volumetric examination from the flange face. No indications or relevant conditions were discovered that required successive inspections in accordance with Paragraph IWB-2420 (b). No inservice repairs or replacements by welding have ever been performed on any of the reactor vessel i welds at Byron Station.

l c) The performance of these examinations in the First Inspection Interval is such that no more than ten years will transpire until the Second Inspection Interval l examinations except as allowed by IWA-2430. This provides a reasonable assurance of operational readiness.

PROPOSED ALTERNATE EXAMINATION Byron Station will perform the required shell-to-flange weld volumetric examination concurrent with the reactor vessel ten-year examinations at or near the end of the Second Inservice Inspection Interval. Scheduling will be such that no more than 10 l years expires between successive examinations, except where the length of an interval I is adjusted in accordance with IWA-2430.

PERIOD FOR WlilCII RELIEF IS REOUESTED Relief is requested for the Second Inservice Inspection Interval.

P:98byItrs 980281 dcs

, Revision 0 BYRON STATION UNITS 1 & 2 SECOND INTERVAL ISI PROGRAM Pl.AN-NRC SUBMITTAL RELIEF REQUEST 12R-34 (Page1of4)

COMPONENT IDENTIFlCATI,0N Code Class: 1

References:

IWA-5242(a)

Examination Category: B-P Examination item Numbers: B15.70 and B15.71

Description:

Alternative Requirements for Insulation Removal at Bolted Connections in Systems Borated for the Purpose of Controlling Reactivity Component Number: Valve Numbers (22 Total _Each Unit) 1(2)S18948A-D 1(2)RC8002A-D 1(2)Sl8949A-D 1(2)RC8003 A-D 1(2)RC8001 A D 1(2)RH8701 A-B

Reference:

1) " Materials Handbook for Nuclear Plant Pressure Boundary Applications," EPRI TR-109668-SI, WO4382-01, Final Report, Revision 0, December 1997 (EPRI Proprietary)

ASME CODE REOUIREMEN.T IWA 5242(a), states "For systems borated for the purpose of controlling reactivity, insulation shall be removed from pressure retaining bolted connections for visual examination VT-2" ASME CODE REOUIREMENTS FROM WillCil REl,IEF IS REOUESTED Reliefis requested for the IWA 5242(a) requirement to remove insulation on all bolted connections in systems borated for the purpose of controlling reactivity.

HASIS FOR REl.lEF Pursuant to 10 CFR 50.55a(a)(3)(i), reliefis requested on the basis that the proposed alternative would provide an acceptable level of quality and safety Specifically, reliefis requested from the requirement to remove insulation for the Class I components listed above for VT-2 on the frequency specified in Tables IWB 2500, Category B-P, (each refueling outage). The following supports a reduced inspection frequency:

Pp98bytt#980284. doe

~

Revision 0 BYRON STATION UNITS 1 & 2 SECOND INTERVAL ISI PROGRAM PLAN-NRC SUBMITTAI, RELIEF REQUEST 12R-34 (Page 2 of 4)

1. ASME Code Section XI paragraph IWA-5242(a) requires the removal ofinsulation from pressure retaining bolted connections for VT-2 visual examinations when the system is borated for the purpose of controlling reactivity. Paragraph IWA-5242(a) requires this for all bolting, regardless of material type, when the system is borated for the purpose of controlling reactivity. For all materials of construction, when the system is not borated for the purpose of controlling reactivity, insulation removal is not required by paragraph IWA-5242(a) for VT-2 visual examinations.

I Comed believes that by the ASME Code only requiring insulation removal for borated systems, the intent of this requirement is to address early detection of boric acid wastage of the bolting materials. In either borated or non-borated systems, ifleakage results in wetting of the bolting material, the required VT-2 visual examinations would not be effective at detection ofincipient stress corrosion cracking ifit occurs; only the volumetric )

examinations ofIWB-2500 Categories B-G-1 would be etTective. For this reason, if the botting material of construction is resistant to boric acid wastage, there is no reduction in margin of safety if the required VT-2 visual examinations are perfonned without insulation removal cach refueling the same way as is performed for other Class I non-borated systems. The proposed alternative provision ofinspecting these components on a once per year 10-year interval basis will provide sufficient assurance that these highly corrosion resistant components have not degraded.

2. For the valves listed above both the stud / bolt material and closure nut material utilize SA-453 Grade 660 Class B. Also known as alloy A-286, the nominal composition of this ferrous alloy is 25Ni-15Cr-2Ti Al. According to Reference 1, the "high chromium content of alloy A-286 gives it similar resistance to general corrosion in boric acid as possessed by stainless steel, which is essentially immune to the wastage or crosion-corrosion problems."

Referece 1 determines that for A-286 material, stress corrosion cracking is only a concern if bolting material is loaded to 100 ksi or higher. For the valves listed above, review of the installation procedures shows that none of the bolting is loaded to more than 65 ksi.

Therefore, etress corrosion cracking is not a concern. Also, Reference I states that a review of available NRC Public Documentation revealed no reports of failures of alloy A-286 used for external reactor vessel bolting service in D&W units over a service period of greater that 20 years.

3. The valves listed above are among the highest radiation level components in the Borated Bolting Inspection Program. Insulation removal combined with scaffolding erection and inspection time are expected to contribute significantly (approximately 1.5 person-rem) to the overall dose received. As discussed above, there is no significant increase in plant safety to be gained by performing VT-2 inspection of these materials on an every refueling outage frequency.

PJ.98byttrs 980284 doe

.- _ .-_ .. - - -- . - - - - - - . - - - - - . - - - . - - _ _ - _ _ ~ - _ _ - ,

Revision 0 I

)

IWRON STATION UNITS 1 & 2 SECOND INTERVAL ISI PROGRAM PLAN-NRC SUHMITTAL RELIEF REQUEST 12R-34 (Page 3 of 4)

I The following Byron Station bolting examination commitments and material control programs in l conjunction with the Proposed Alternative Provisions provide an acceptable level of safety and quality for bolted connections in systems borated for the purpose of controlling reactivity.

In response to NRC Generic Letter 88-05, Byron Station has established a program for Engineering to inspect all boric acid leaks discovered in the containment building and to evaluate the impact of those leaks on carbon steel or low alloy steel components. Any evidence ofleakage, including dry boric acid crystals or residue, is inspected and evaluated regardless of whether the leak was discovered at power or during an outage. Issues such as the following are considered in the inspection and evaluation:

l 1) Evidence of corrosion or metal degradation l 2) Effect the leak may have on the pressure boundary l 3) Possibility of boric acid traveling along the inside ofinsulation on piping, and

4) Possibility of dripping or spraying on other components.

l Based on this evaluation, Byron Engineering initiates appropriate corrective actions to prevent reoccurrence of the leak and to repair, if necessary, any degraded materials or components.

l In summary, for systems borated for the purpose of controlling reactivity, when the bolting l material is SA-453 Grade 660 and therefore immune to boric acid corrosion, Comed requests relief from the requirement of ASME Code Section XI paragraph IWA-5242(a) that insulation shall be removed from pressure retaining bolted connections for VT-2 visual examination.

Volumetric examinations as applicable to IWB-2500 Categories B-G 1 will continue to be performed.

1 PROPOSED AI, TERNATE PROVISIONS For ASME Code Class I systems borated for the purpose of controlling reactivity, a system insenice leakage test shall be performed in accordance with the frequency required in table IWB-2500 (each refueling outage), without the removal ofinsulation from the bolted connections. The requirements for insenice leak tests shall be augmented with a minimum 4-hour hold time at system normal operating pressure prior to the VT-2 visual examination to allow for leakage propagation from the insulation. If evidence ofleakage is detected on the above listed valves, the insulation shall be removed and the evaluations for corrective measures performed in accordance with IWA-5250 (as modified for Byron by Relief Request 12R-12).

l l

l i

f f

j P.'98byttrs 980284. doe l

1 Revision 0 BYRON STATION UNITS 1 & 2 SECOND INTERVAL ISI PROGRAM PL,AN-NRC SUBMITTAL RELIEF REQUEST 12R-34 (Page 4 of 4)

For the valves listed above, the insulation shall be removed from the bolted connections and a VT-2 examination shall be conducted, with the system depressurized on a once per 10-year interval frequency. These examinations shall be distributed throughout the inspection interval. If evidence ofleakage is detected evaluations for corrective measures performed will be performed in accordance with IWA-5250 (as modified for Byron by Relief Request 12R-12). These inspections shall be implemented through application of the Byron Station predefined surveillance program to l assure they are performed within the prescribed time periods.  !

j The referenced, Class 1 valves, are included in the scope of Byron ASME Code Relief Request 12R-11, Revision 2, currently in review with the NRC, which stipulates an inspection frequency of .

I every refuel cycle with the system depressurized for Class 1 valves. The 10-year frequency of this relief request (12R-34) supercedes 12R-11 for these valves only.

Regardless of whether a component is scheduled for examination or not, any evidence ofleakage will result in evaluations for corrective measures in accordance with IWA-5250 (as modified for Byron Station by Relief Request 12R-12).

4 PERIOD FOR WillCil RELIEF IS REOUESTED Reliefis requested for the second ten-year inspection interval of the Inservice Inspection Program for Byron Unit I and Unit 2.

Pe98by ttri 980284. doe