Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML21196A504 | 8 June 2021 | EIS-U.S Nuclear Regulatory Commission June 8, 2021, Meeting Transcript | |
ML21158A075 | 7 June 2021 | Clean (No Talking Points) Slides for the Third Public Meeting on 2.206 Petition Review Process June 8, 2021 | |
ML21047A470 | 8 April 2021 | Harris | Issuance of Amendment No. 185 Regarding Reduction of Reactor Coolant System Minimum Flow Rate and Update to the Core Operating Limits Report References |
ML21047A314 | 2 April 2021 | Harris | Issuance of Amendment No. 184 Regarding Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B |
ML21069A064 | 18 March 2021 | Harris | Alternative to ASME Section XI Code Requirements to Defer Repair of Emergency Service Water System Socket Weld |
ML21027A226 | 17 February 2021 | Saint Lucie | Approval of Alternative to ASME Code, Section XI to Use an Alternative Inservice Inspection Schedule for the Reaction Vessel Closure Head Bolting |
ML21029A335 | 16 February 2021 | Oconee Mcguire Catawba Harris Brunswick Robinson McGuire | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI |
ML20329A402 | 3 February 2021 | Saint Lucie | Approval of Alternative to Use ASME Code Case N-513-4 for Alternative Repair of Intake Cooling Water System |
ML20310A410 | 18 December 2020 | Brunswick | Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior |
ML20300A206 | 9 November 2020 | Oconee Mcguire Catawba Harris Brunswick Robinson McGuire | Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI |
ML20287A551 | 6 November 2020 | Turkey Point | Approval of Alternative to Use ASME Code Section XI IWA-4340 - for Repairs of Component Cooling Water System Piping |
ML20265A356 | 6 October 2020 | Summary of the August 18, 2020, Proposed Changes to the 10 CFR 2.206 Process Category 3 Public Meeting | |
ML20253A181 | 23 September 2020 | Browns Ferry | Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code |
ML20227A190 | 18 August 2020 | Slides for the Public Meeting on 2.206 Petition 08/18/2020 (Rev 5 No Notes) | |
ML20157A139 | 24 June 2020 | Harris | Project Manager Reassignment |
ML20174A272 | 22 June 2020 | Robinson | Project Manager Reassignment |
ML20097F088 | 19 June 2020 | Robinson | Relief Request RA-19-0106 Regarding Proposed Alternative to ASME Code Case N-729-4 Volumetric or Surface Examination Requirements EPID-L-2019-LLR-0065) |
ML20128J253 | 7 May 2020 | Sequoyah | Project Manager Change |
ML20090F893 | 29 April 2020 | Robinson | Relief Request RA-19-0138 Regarding Proposed Alternative to ASME Code, Section XI Volumetric Examination Frequency Requirements |
ML20080G950 | 5 April 2020 | Harris | Relief from the Requirements of the ASME Code |
ML20023B378 | 19 February 2020 | Saint Lucie | Safety Evaluation for Relief Request RR-16, Alternate Repair of 2B Boric Acid Makeup Pump Revision for the Fourth 10-Year Inservice Inspection Interval |
ML20021A013 | 19 February 2020 | Robinson | Request for Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule |
ML19324C545 | 26 November 2019 | Turkey Point | Project Manager Change Letter |
ML19284C719 | 26 November 2019 | Robinson | Project Manager Reassignment |
ML19284A352 | 22 October 2019 | Turkey Point | Project Manager Assignment |
ML19284A360 | 22 October 2019 | Watts Bar | Project Manager Reassignment |
ML19284A434 | 22 October 2019 | Saint Lucie | Project Manager Assignment |
ML19284A349 | 18 October 2019 | Brunswick | Project Manager Assignment |
ML19249C667 | 8 October 2019 | Watts Bar | Revision of Schedule and Level-of-Effort Estimates for Review of License Amendment Requests |
ML19254B533 | 30 September 2019 | Saint Lucie | Safety Evaluation for Relief Request RR#15, Revision 0, Regarding Limited Piping Examinations |
ML19234A013 | 23 September 2019 | Sequoyah | Alternative Request 18-ISI-1 Regarding Examination of Dissimilar Metal Welds in Reactor Vessel Head |
ML19254A620 | 17 September 2019 | Oconee Mcguire Catawba Harris Brunswick Robinson McGuire | Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography |
ML19227A110 | 26 August 2019 | Watts Bar Sequoyah | Alternative Request for the Turbine Driven Auxiliary Feedwater Pumps 10-Year Interval Inservice Testing Program |
ML19205A126 | 29 July 2019 | Watts Bar | Temporary Project Manager Change Letter |
ML19158A395 | 3 July 2019 | Browns Ferry Watts Bar Sequoyah | Verification Letter of the Approval Version of Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ0000002016000041, Rev. 1 |
ML19128A326 | 20 June 2019 | Oconee Mcguire Catawba Harris Brunswick Robinson McGuire | Alternative to Depth Sizing Qualification Examination of Welds |
ML19115A281 | 31 May 2019 | Saint Lucie | Safety Evaluation for Relief Request No. 6 for the Fifth 10 Year Inservice Inspection Interval |
ML19010A212 | 18 March 2019 | Browns Ferry Watts Bar Sequoyah | Final Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation |
ML19016A215 | 28 February 2019 | Browns Ferry | Relief from the Requirements of American Association of Mechanical Engineers Code Section XI Inservice Inspection Program, Request for an Alternative ISI-46 |
ML19018A025 | 26 February 2019 | Harris | Relief Request I3R-18, Regarding Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Inservice Inspection Program for Containment, Third Ten-Year Interval |
ML19009A126 | 15 January 2019 | Saint Lucie Turkey Point | Units 1 and 2, Project Manager Assignments |
ML18310A178 | 31 December 2018 | Browns Ferry Watts Bar Sequoyah | Draft Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ00000016000041 |
ML18323A172 | 31 December 2018 | Browns Ferry | Relief Request No. 1 ISI 29 Regarding Second 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Welds |
ML18303A048 | 4 December 2018 | Harris | Extension of Reactor Pressure Vessel Surveillance Report for Capsule Z |
ML18323A026 | 4 December 2018 | Browns Ferry | Relief Request No. 1-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Reactor Vessel Welds |
ML18283B544 | 20 November 2018 | Harris | Relief from the Requirements of the ASME Code, Section XI, Reactor Vessel Closure Head Penetration Nozzle Repair Technique |
ML18310A329 | 8 November 2018 | Robinson | Project Manager Assignment |
ML18310A182 | 8 November 2018 | Watts Bar | Project Manager Reassignment |
ML18256A098 | 30 October 2018 | Saint Lucie | Safety Evaluation for Relief Request No.5 for the Fifth 10-Year Inservice Inspection Interval |
ML18018A033 | 26 January 2018 | Saint Lucie | Safety Evaluation of Relief Requests for the Fifth 10-Year Inservice Testing Program (EPID L-2017-LLR-0113; L-2017-LLR-0017, L-2017-LLR-0018, L-2017-LLR-0119, L-2017-LLR-0120, L-2017-LLR-0121, and L-2017-LLR-0122) |