Letter Sequence Other |
|---|
|
|
MONTHYEARCNL-16-136, Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ00000020160000412016-09-20020 September 2016 Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041 Project stage: Request ML16265A3172016-09-21021 September 2016 NRR E-mail Capture - (External_Sender) 09/23/2016 Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Post-Submittal Walk-Through - Slides Project stage: Request ML16299A0672016-10-25025 October 2016 NRR E-mail Capture - Accepted for Review - TVA Topical Report Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 Project stage: Other ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 Project stage: Meeting ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status Project stage: Request CNL-17-120, Status Regarding the Improved Flood Mitigation System Project2017-09-29029 September 2017 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 Project stage: Meeting ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) Project stage: RAI CNL-18-048, Status Regarding the Improved Flood Mitigation System Project2018-04-0202 April 2018 Status Regarding the Improved Flood Mitigation System Project Project stage: Request CNL-18-044, Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation2018-04-19019 April 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation Project stage: Response to RAI CNL-18-081, Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 12018-06-22022 June 2018 Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1 Project stage: Request CNL-18-122, Status Regarding the Improved Flood Mitigation System Project2018-09-28028 September 2018 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML18310A1782018-12-31031 December 2018 Draft Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ00000016000041 Project stage: Draft Approval CNL-19-013, Comments on the Draft Safety Evaluation for Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation2019-01-11011 January 2019 Comments on the Draft Safety Evaluation for Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation Project stage: Draft Other ML19010A2122019-03-18018 March 2019 Final Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation Project stage: Approval CNL-19-029, Status Regarding the Improved Flood Mitigation System Project2019-03-29029 March 2019 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML19158A3952019-07-0303 July 2019 Verification Letter of the Approval Version of Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ0000002016000041, Rev. 1 Project stage: Other CNL-19-094, Status Regarding the Improved Flood Mitigation System Project2019-09-30030 September 2019 Status Regarding the Improved Flood Mitigation System Project Project stage: Other 2018-02-23
[Table View] |
Text
July 3, 2019 Mr. Joseph W. Shea Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A Chattanooga, TN 37402-2801
SUBJECT:
VERIFICATION LETTER OF THE APPROVAL VERSION OF TENNESSEE VALLEY AUTHORITY TOPICAL REPORT TVA OVERALL BASIN PROBABLE MAXIMUM PRECIPITATION AND LOCAL INTENSE PRECIPITATION ANALYSIS CALCULATION CDQ0000002016000041, REVISION 1 (EPID L-2016-TOP-0011)
Dear Mr. Shea:
By letter dated May 21, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19155A047), Tennessee Valley Authority (TVA, the applicant) submitted an approval (-A) version of the subject Topical Report (TR), TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1, to the U.S. Nuclear Regulatory Commission (NRC) staff.
TVA has done so in accordance with our request to publish approval proprietary and non-proprietary versions of this TR, as detailed in the transmittal letter dated March 12, 2019, of the NRC staffs final safety evaluation (ADAMS Accession No. ML19010A212) for this TR.
The NRC staff has completed its review of the approval version of the TR. The NRC staff verified that TVA has met the requirements and determined that the submitted -A versions are acceptable for referencing in licensing applications for nuclear power plants to the extent specified and under the limitations and conditions delineated in the accepted versions of this TR.
J. Shea If you have any questions, please contact Andrew Hon at 301-415-8480.
Sincerely,
/RA/
Undine Shoop, Branch Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, 50-391 RESOLUTION OF COMMENTS BY THE OFFICE OF NUCLEAR REACTOR REGULATION ON DRAFT SAFETY EVALUATION FOR TENNESSEE VALLEY AUTHORITY TOPICAL REPORT, TVA OVERALL BASIN PROBABLE MAXIMUM PRECIPITATION AND LOCAL INTENSE PRECIPITATION ANALYSIS CALCULATION CDQ0000002016000041, REVISION 1 This attachment provides the U.S. Nuclear Regulatory Commission (NRC) staffs review and disposition of the comments from Tennessee Valley Authority (TVA) on the draft safety evaluation(SE) for TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ0000002016000041, Revision 1.
Page Line Proposed Change / Comment NRC Resolution of Proposed Change/Comment 1
21 Recommend deletion of major as used to refer to TVA dams. The term is not well defined.
The NRC staff understood the concern. The sentence in question was modified accordingly in the final SE.
2 60 Suggest inserting upstream to describe the watersheds depicted in Figure 2.
Figure 2 does not include portions of the watersheds contributing to backwater effects downstream of the nuclear plants.
The NRC staff understood the concern. The sentence in question was modified accordingly in the final SE.
ML19158A395
- by email OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRO/DLSE/RHM/BC*
NRR/DORL/LPL2-2/BC NAME AHon BClayton (JBurkhardt for) DBarnhurst UShoop DATE 06/07/19 06/25/19 06/10/19 07/03/19