MONTHYEARCNL-16-136, Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ00000020160000412016-09-20020 September 2016 Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041 Project stage: Request ML16265A3172016-09-21021 September 2016 NRR E-mail Capture - (External_Sender) 09/23/2016 Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Post-Submittal Walk-Through - Slides Project stage: Request ML16299A0672016-10-25025 October 2016 NRR E-mail Capture - Accepted for Review - TVA Topical Report Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis CAC Nos. MF8391, MF8392, MF8393, MF8394, MF8395, MF8396 and MF8397 Project stage: Other ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 Project stage: Meeting ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status Project stage: Request CNL-17-120, Status Regarding the Improved Flood Mitigation System Project2017-09-29029 September 2017 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 Project stage: Meeting ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) Project stage: RAI CNL-18-048, Status Regarding the Improved Flood Mitigation System Project2018-04-0202 April 2018 Status Regarding the Improved Flood Mitigation System Project Project stage: Request CNL-18-044, Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation2018-04-19019 April 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation Project stage: Response to RAI CNL-18-081, Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 12018-06-22022 June 2018 Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1 Project stage: Request CNL-18-122, Status Regarding the Improved Flood Mitigation System Project2018-09-28028 September 2018 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML18310A1782018-12-31031 December 2018 Draft Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ00000016000041 Project stage: Draft Approval CNL-19-013, Comments on the Draft Safety Evaluation for Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation2019-01-11011 January 2019 Comments on the Draft Safety Evaluation for Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation Project stage: Draft Other ML19010A2122019-03-18018 March 2019 Final Safety Evaluation for Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation Project stage: Approval CNL-19-029, Status Regarding the Improved Flood Mitigation System Project2019-03-29029 March 2019 Status Regarding the Improved Flood Mitigation System Project Project stage: Request ML19158A3952019-07-0303 July 2019 Verification Letter of the Approval Version of Tennessee Valley Authority Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation CDQ0000002016000041, Rev. 1 Project stage: Other CNL-19-094, Status Regarding the Improved Flood Mitigation System Project2019-09-30030 September 2019 Status Regarding the Improved Flood Mitigation System Project Project stage: Other 2018-02-23
[Table View] |
Text
OFFICIAL USE ONLY - MAY CONTAIN PROPRIETARY INFORMATION OFFICIAL USE ONLY - MAY CONTAIN PROPRIETARY INFORMATION December 31, 2018 Mr. Joseph W. Shea Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A Chattanooga, Tennessee 37402-2801
SUBJECT:
DRAFT SAFETY EVALUATION FOR TENNESSEE VALLEY AUTHORITY TOPICAL REPORT TVA OVERALL BASIN PROBABLE MAXIMUM PRECIPITATION AND LOCAL INTENSE PRECIPITATION ANALYSIS CALCULATION CDQ0000002016000041 (EPID L-2016-TOP-0011)
Dear Mr. Shea:
By letter dated September 20, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16264A454) and supplemented by a letter dated April 19, 2018 (ADAMS Accession No. ML18117A225), Tennessee Valley Authority (TVA, the applicant) submitted a Topical Report (TR), TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041 for review. TVA revised the TR and submitted it on June 22, 2018 (ADAMS Accession No. ML18192A510). The results described in this draft safety evaluation (SE) pertain to Revision 1 of the TR.
Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have determined that the enclosed draft SE may contain proprietary information. If you believe that any information in the enclosure is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. Ten working days are provided for you to comment on the proprietary aspects and provide any factual errors or clarity concerns contained in the draft SE. The final SE will be issued after making any necessary changes and will be made publicly available. The Nuclear Regulatory Commission (NRC) staff's disposition of your comments on the draft SE will be discussed in the final SE.
The enclosure to this letter contains proprietary information. When separated from the enclosure, this letter is DECONTROLLED.
OFFICIAL USE ONLY - MAY CONTAIN PROPRIETARY INFORMATION J. W. Shea OFFICIAL USE ONLY - MAY CONTAIN PROPRIETARY INFORMATION To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Andrew Hon at 301-415-8480.
Sincerely,
/RA/
Undine Shoop, Branch Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, 50-391
Enclosure:
Draft Safety Evaluation (Proprietary)
LTR ML18310A178; Non-Public SE: ML18310A234
- ML18309A067 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA NRO/DLSE/RHM/BC(A)*
DORL/LPL2-2/BC NAME A.Hon BClayton SDevlin-Gill UShoop DATE 11/16/18 11/16/18 11/05/18 12/31/18