Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML22087A4051 April 2022Memo to Christopher Regan - RIL2020-07 Cognitive Task Analysis
ML22145A1858 March 2022thaggardm-t8-bio
ML22153A3438 March 2022Thaggardm-hv-t8
ML22040A1808 March 2022Regulatory Information Conference (RIC) RIC 2022 Technical Session T8 - Thaggard M - Safety Marker Study
ML22035A1728 March 2022Memo to Michael Franovich - NUREG 2199 IDHEAS AT-POWER Testing Volume 3
ML22006A01913 January 2022Memo to Christopher Regan - RIL-2020-06 Safety Evaluations of Adaptive Automation Suitability of Existing Review Guidance
ML21316A10619 November 2021Memo to Michael Franovich - Ril 2021-14 on IDEHAS-DEP
ML21259A25630 September 2021Research Information Letter 2021-09 - HEAF Cable Fragility Testing at the National Solar Thermal Test Facility
ML21242A03031 August 2021Letter to Nowinowski - Transmittal of NRC Responses to PWROG Data Issues
ML21242A03131 August 2021Enclosure - Staff Responses to PWROG Peer-Review Comments on NRC Spar Parameter Data
ML21138A87718 May 2021U.S. Nuclear Regulatory Commission Perspectives Remediation Challenges Over the Next Decade by Mark Thaggard
ML21098A1256 April 20211A - Opening
ML21076A24026 March 2021Memorandum - Transmittal of the ASP Program 2020 Annual Report
ML18079A15815 March 2018T1 NRC - Welcome Mark Thaggard
ML17038A30713 April 2017CatawbaFinal ASP Analysis- Catawba 1 (LER 413-2016-001)
ML16308A44719 October 2016WaterfordFinal ASP Program Analysis Precursor for Waterford Steam Electric Station, Unit 3 Re. Both Emergency Diesel Generators Declared Inoperable (LER 382-2015-007)
ML13130A1854 June 2013LimerickEvacuation Time Estimate (ETE) Update for the Limerick Generating Station (LGS) Site
ML13106A35017 April 2013Diablo CanyonAppreciation Letter of Participation to Andy Warwick, During the 25th Regulatory Information Conference (RIC 2013)
ML12346A46328 March 2013Technical Evaluation for the Endorsement of NEI 99-01, Revision 6
ML12096A2126 April 2012Nrc'S 24th Annual Regulatory Information Conference (RIC) 2012 Thank You Letter to Susan Perkins-Grew
ML07270032127 September 2007SequoyahMemo: Temperature Issue for the Sequoyah Nuclear Plant, Units 1 & 2 - Technical Specification Change Request for Ultimate Heat Sink Temperature Increase and Elevation Changes
ML07116019026 April 2007SequoyahMemo for Thomas H. Boyce - Staff Hydrologic Technical Evaluation Report for the Sequoyah Nuclear Plant, Units 1 & 2- Technical Specification Change Request for Ultimate Heat Sink Temperature (Tac No. MD2621)
ML20206G2814 May 1999Forwards Matls Furnished by NRC for Work Under Task Order 3,under Area 3 of FIN J-5131.Task Order Issued with NRC Form 173,included.Without Encls
NUREG-0902, Forwards Listed Reg Guides & NUREGs in Response to Interest Expressed at Blue Ribbon Commission on Siting 921116 Meeting.W/O Encls24 November 1992Forwards Listed Reg Guides & NUREGs in Response to Interest Expressed at Blue Ribbon Commission on Siting 921116 Meeting.W/O Encls
ML20217N77414 September 1990Forwards Comments from Preliminary Review of Draft Naturita Rap.Understands That Site Visit Will Not Be Made at Present Time & That Preliminary Review Comments Will Be Provided to DOE