ML071160190
| ML071160190 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/26/2007 |
| From: | Mark Thaggard NRC/NRO/DSER/HEB |
| To: | Boyce T NRC/NRR/ADRO/DORL/LPLII-2 |
| Hosung Ahn NRR/ECGB/DE 415-1398 | |
| Shared Package | |
| ML071160179 | List: |
| References | |
| TAC MD2621 | |
| Download: ML071160190 (2) | |
Text
April 26, 2007 MEMORANDUM TO:
Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Mark Thaggard, Chief /RA/ Hosung Ahn for Hydrologic Engineering Branch Division of Siting and Environmental Reviews Office of New Reactors
SUBJECT:
STAFF HYDROLOGIC TECHNICAL EVALUATION REPORT FOR THE SEQUOYAH NUCLEAR PLANT, UNITS 1 & 2 -
TECHNICAL SPECIFICATION CHANGE REQUEST FOR ULTIMATE HEAT SINK TEMPERATURE (TAC No. MD2621)
The Hydrologic Engineering Branch (RHEB) has prepared a Hydrologic Technical Evaluation Report for Sequoyah Nuclear Plant, Units 1 & 2 - Technical Specification Change Request, Section 3.7.9.1, Ultimate Heat Sink (UHS) Temperature. Based on our review of the application and the result of staffs confirmatory analyses, the staff concluded that the Ultimate Heat Sink (UHS) system with the proposed technical changes can provide the necessary cooling water to the plant after a postulated downstream dam failure. Please let us know if you have any questions or concerns on our review (Enclosure).
Enclosure :
As stated CONTACT: Hosung Ahn, NRO/DSER/RHEB (301) 415-1398
April 26, 2007 MEMORANDUM TO:
Thomas H. Boyce, Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Mark Thaggard, Chief /RA/ Hosung Ahn for Hydrologic Engineering Branch Division of Siting and Environmental Reviews Office of New Reactors
SUBJECT:
STAFF HYDROLOGIC TECHNICAL EVALUATION REPORT FOR THE SEQUOYAH NUCLEAR PLANT, UNITS 1 & 2 -
TECHNICAL SPECIFICATION CHANGE REQUEST FOR ULTIMATE HEAT SINK TEMPERATURE (TAC No. MD2621)
The Hydrologic Engineering Branch (RHEB) has prepared a Hydrologic Technical Evaluation Report for Sequoyah Nuclear Plant, Units 1 & 2 - Technical Specification Change Request, Section 3.7.9.1, Ultimate Heat Sink (UHS) Temperature. Based on our review of the application and the result of staffs confirmatory analyses, the staff concluded that the Ultimate Heat Sink (UHS) system with the proposed technical changes can provide the necessary cooling water to the plant after a postulated downstream dam failure. Please let us know if you have any questions or concerns on our review (Enclosure).
Enclosure:
As stated CONTACT: Hosung Ahn, NRO/DSER/RHEB (301) 415-1398 DISTRIBUTION:
DSER/RHEB RF BMoroney Package Number: ML071160179 Accession Number: ML071160190 OFFICE RHEB/DSER RHEB/DSER NAME HAhn MThaggard DATE 04/25/2007 04/26/2007 OFFICIAL RECORD COPY