ML22153A343

From kanterella
Jump to navigation Jump to search
Thaggardm-hv-t8
ML22153A343
Person / Time
Issue date: 03/08/2022
From: Mark Thaggard
NRC/RES/DRA
To:
Office of Nuclear Reactor Regulation
References
Download: ML22153A343 (13)


Text

PerspectiveonSafetyImprovements forCommercialNuclearPowerPlants MarkThaggard,Director DivisionofRiskAnalysis OfficeofNuclearRegulatoryResearch,U.S.NRC

2 Overview

  • 



 

  

    

   



  •         



 









  • 





 





   



3 RESConsiderationsinLookingatDifferentMeasuresofPerformance

  • Whattimeframeshouldweconsider?
  • 20years(2000+)
  • 30years(1990+)
  • Advancementsmakeitdifficulttocompareperformance measuresovertime
  • Measuresofperformancemayneedtobeinterpretedusing engineeringjudgment

4 1988-2000PlantSafetyImprovements Theperiodofinterest impactsoverall conclusions Manysafetysignificant actions/changes weremade

5 1988-2000PlantSafetyImprovements SignificantEvents

2000-Present:PlantSafetyImprovements 6

Improvementsmade duringthisperiodare notassignificantas thoseinthe1990s Notallchangeshave beenfullyrealized

7 RESCategoriesofPerformanceMeasures Operationaltrends Plantriskduetointernalevents/internalfloods Plantriskduetootherhazards NRCstudies,orders,models,etc.

Industrystudies,standards,models,etc.

Other

SafetyMeasureTrends 8

51measures NegativeTrends Lossofoffsitepower(LOOP)recoverytime PositiveTrends Annualscrams NRCreactiveinspections Accidentsequenceprecursor(ASP)results Radiationexposure Performanceindicators Internaleventscoredamagefrequency(CDF)

Reactorcoolantpump(RCP)sealperformance Lossofoffsitepower(LOOP)frequency 1

measure 8

measures

RemainingSafetyRelatedMeasures 9

Apparentfavorabletrends Lowerconditionalprobabilitythataradiologicalreleasewouldleadto promptorlatenthealtheffects Improvementsrelatedtofloodingandseismichazardreevaluations Mitigatingstrategiesimprovements(FLEX)

RiskinsightsfromtheStateoftheArtReactorConsequenceAnalyses (SOARCA)

GenericIssuesProgramimprovements B.5.bimprovements Improvementsinconsensusstandardsandregulatoryguidance Pressurizedwaterreactorsteamgeneratorperformanceimprovements ImprovementsinPRAdevelopmenttools 32neitherfavorableornegativetrend 9

SomeObservations 10

  • Largereductioninaveragecoredamagefrequency(CDF)(sincetheIPEresults)
  • Limitedtocontributionsfrominternalevents
  • Externaleventhazardscanaddsignificantlytoplantrisk,soitisimportant toincludeindiscussionofsafetytrending
  • Reductioninperformanceissues
  • RiskbelowNRCsafetygoals
  • Boththeuncertaintiesandexternalhazardsneedtobeconsideredwhen lookingatthesafetygoalimpacts

Conclusions 11

  • Performancemeasuresappeartoshowimprovementsinnuclearpowerplants Couldbeattributedtoinitiativesandrulesaddressingkeysafetyissues (e.g.,stationblackout(SBO)rule,greateruseofriskinformeddecisionmaking)
  • Plantsafetyimprovementsimplementedsincetheyear2000haveshownagradual increaseinsafety,buttoasmallerextentthanduringtheprevious10years
  • Notallsafetymeasuresmovedinthesamepositivedirection
  • Externaleventimpactsareimportant,andsignificantuncertaintiesstillexist

Questions 12

13 PointsofContact Mehdi.Reisifard@nrc.gov BranchChief, DivisionofRiskAnalysis,RES Matthew.Humberstone@nrc.gov SeniorReliabilityandRiskAnalyst DivisionofRiskAnalysis,RES