Issue date | Title | Topic | |
---|---|---|---|
ML20206M487 | 11 November 1988 | Requests That Proprietary Info Marked in WCAP-11883, Implementation of Steam Generator Low Low Level Reactor Trip Time Delay & Environ Allowance Modifier in Callaway Plant Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20154A129 | 26 August 1988 | Submits Application for Withholding Proprietary WCAP-11883, Implementation of Steam Generator Low Low Level Reactor Trip Time Delay & Environ Allowance Modifier in Callaway Plant from Public Disclosure (Ref 10CFR2.790) | |
ML20214R476 | 18 May 1987 | Documents Deviations Noted at Facility Re Existence of RTV Foam Seals Not Conforming to Requirements,Per 870515 Telcon W/Region Iv.Preliminary Evaluations on Acceptable Methods of Repair Will Be Completed by 870522 | Fire Watch |
NRC-87-3194, Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted | 7 January 1987 | Documents 861231 Telcon Re Anomalous Plant Data at Callaway & Wolf Creek.Investigation Initiated.Data Specs for McGuire, Catawba & Millstone Will Be Transmitted | |
NRC-86-3160, Submits Updated List of Plants Affected by Changes in ECCS Evaluation Model Described in Rev 1 to Addendum 3 to WCAP-9561-P | 8 September 1986 | Submits Updated List of Plants Affected by Changes in ECCS Evaluation Model Described in Rev 1 to Addendum 3 to WCAP-9561-P | |
LD-86-038, Provides Info for Reactor Coolant Pump Data Bases on C-E Designed NSSS 80 for facilities.WPPSS-3 Should Be Added to Data Base | 5 September 1986 | Provides Info for Reactor Coolant Pump Data Bases on C-E Designed NSSS 80 for facilities.WPPSS-3 Should Be Added to Data Base | |
ML20205P897 | 12 May 1986 | Requests Withholding of 860218 Addl Info,Re Application for Amend to License NPF-30 on Reload Per 10CFR2.790 | |
LD-86-013, Requests Clarification That NRC Review of Ref Portion of Plant Application Closed to Extent That Util Commits to CESSAR as Approved Through Final Design Approval & Amend 1 | 12 February 1986 | Requests Clarification That NRC Review of Ref Portion of Plant Application Closed to Extent That Util Commits to CESSAR as Approved Through Final Design Approval & Amend 1 | |
ML20138J379 | 11 December 1985 | Requests Withholding Proprietary Info from Public Disclosure (Ref 10CFR2.790) | Fuel cladding |
ML20129A289 | 30 May 1985 | Requests Withholding of Proprietary Safety Evaluation for Increased Rdf Co Resistance Temp Detector Uncertainty & Rosemount Transmitter Installation,Per 10CFR2.790 | |
NRC-85-3034, Informs of Status of Investigations Into Repts by Two Plants of Resistance Temp Detector Calibr Anomalies in Detectors Manufactured by Rdf Co | 6 May 1985 | Informs of Status of Investigations Into Repts by Two Plants of Resistance Temp Detector Calibr Anomalies in Detectors Manufactured by Rdf Co | |
ML20111C328 | 4 January 1985 | Requests Author Addition to Correspondence List for Listed Facilities | |
ML20101G008 | 21 December 1984 | Application for Withholding Info Re post-critical Testing (Ref 10CFR2.790) | |
ML20101K260 | 19 December 1984 | Authorizes Utilization of Encl Affidavit AW-80-27 Requesting Withholding Proprietary Info on Revised Draft Equipment Qualification Justification for Interim Operation Per 10CFR2.790 | |
ML20101C194 | 26 November 1984 | Informs of Upcoming Insp of Mechanical Interlock Starters at Listed Facilities | |
ML20106F620 | 18 October 1984 | Requests Withholding Proprietary Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Callaway & Wolf Creek Plants, (Ref 10CFR2.790) | |
LD-84-049, Forwards Response to Mechanical Engineering Branch 840424 Request for Addl Info Re Operability of Shutdown Cooling Sys Relief Valves Used on Sys 80 Std Plant.Valves in Question Will Function Under Anticipated Design Conditions | 7 September 1984 | Forwards Response to Mechanical Engineering Branch 840424 Request for Addl Info Re Operability of Shutdown Cooling Sys Relief Valves Used on Sys 80 Std Plant.Valves in Question Will Function Under Anticipated Design Conditions | |
ML20083M844 | 11 April 1984 | Application for Withholding Proprietary Westinghouse Interconnecting Wiring Diagrams & Process Control Block Diagrams Associated W/Pressurizer Pressure Input (Ref 10CFR2.790).W/affidavit | |
ML20088A272 | 3 April 1984 | Authorizes Use of Encl 761201 Affidavit Re Withholding Proprietary Westinghouse Info from Public Disclosure | |
ML20087N618 | 22 March 1984 | Application for Withholding Proprietary Response to NRC Questions on Setpoint Methodology | |
ML20091K886 | 2 March 1984 | Requests Withholding Proprietary Info Re Power Plant Licensing or Rulemaking Proceedings,(Ref 10CFR2.790). Affidavit Encl | |
ML20080D963 | 20 January 1984 | Application for Withholding Rept, Snupps Steam Generator Tube Plugging Margin Evaluation (Ref 10CFR2.790) | |
ML20024F099 | 24 August 1983 | Forwards Proprietary Thermocouple/Core Cooling Monitor,Vols 1 & 2. Repts Withheld (Ref 10CFR2.790) | |
ML20052F090 | 4 May 1982 | Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds | |
ML20009G475 | 27 July 1981 | Advises That 16-cylinder PC-2.5 Engine for Marine Contract Suffered Burned Exhaust Valve Cage During Factory Tests. Specified Cages Will Be Inspected for Adequate Torquing of Holdowns Prior to Startup of Facilities | |
ML19268C032 | 5 October 1979 | Responds to IE Bulletin 79-03 Followup Rept.Data Developed on Generic Basis & Considered Applicable to All Snupps Units.Fabrication & Installation of Youngstown Pipe Spools Will Proceed W/All Matl Analyzed Prior to Use | |
ML19209A394 | 10 September 1979 | Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies, Re safety-related Application,Mfg & Overall Dimensions | |
ML20027A551 | 6 December 1978 | Repts Noncompliance of Motor Actuators on Active,Safety Related Valves to Meet Customer Procurement Requirements. Corrections Will Be Made by Replacing Valve Actuators W/Qual Valve Actuators |