Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20059E060 | 7 August 1990 | Requests That Proprietary Suppl 3 to WCAP-12093, Evaluation of Pressurizer Surge Line Transients Exceeding 320 F for Beaver Valley Unit 2, Be Withheld Per 10CFR2.790(b)(4) | |
ML18094B414 | 27 March 1990 | Outlines Plan & Basis for Plan to Update Steam Generator Tube Fatigue Evaluations Performed by Westinghouse in Response to NRC Bulletin 88-002 | |
ML20246H260 | 28 August 1989 | Requests That Suppl 2 to WCAP-12093, Addl Info in Support of Evaluation of Thermal Stratification for Beaver Valley Unit 2 Pressurizer Surge Line, Be Withheld from Public Disclosure Per 10CFR2.790 | |
ML20248E873 | 1 March 1989 | Application for Withholding Proprietary WCAP-12141, Beaver Valley Unit 2 Evaluation for Tube Vibration Induced Fatigue (Ref 10CFR2.790) | |
ML20245H620 | 20 February 1989 | Requests Withholding of Proprietary Suppl 1 to WCAP-12093, Addl Info in Support of Evaluation of Thermal Stratification for Beaver Valley Unit 2 Pressurizer Surge Line, (Ref 10CFR2.790) | |
ML20245G681 | 22 December 1988 | Requests That WCAP-12058, Resistance Temp Detector Bypass Elimination Licensing Rept for Beaver Valley Unit 1, Be Withheld (Ref 10CFR2.790) | |
ML20151G349 | 16 June 1988 | Requests Withholding of Proprietary Suppl 7,Rev 0 to WCAP-10170, Westinghouse SPDS Design & Verification... Process for Beaver Valley Unit 1 Nuclear Station, from Public Disclosure (Ref 10CFR2.790) | |
ML20154A651 | 13 April 1988 | Requests Proprietary WCAP-11799, Beaver Valley Unit 1 Evaluation for Tube Vibration Induced Fatigue, Be Withheld Per 10CFR2.790(b)(4) | |
ML20236S073 | 6 November 1987 | Requests That Proprietary Suppl 2 to WCAP-11317, Verification of Fracture Mechanics Analysis Techniques Used in Support of Technical Justification for Eliminating Large Primary Loop Pipe Rupture..., Be Withheld Per 10CFR2.790 | |
ML20236A963 | 26 October 1987 | Requests That Proprietary WCAP-11419, Westinghouse Setpoint Methodology for Protection Sys Beaver Valley Unit 1, Be Withheld,Per 10CFR2.790(b)(4) | |
ML20235J449 | 18 September 1987 | Requests That Proprietary WCAP-11317,Suppl 1, Addl Info in Support of Technical Justification for Eliminating Large Primary Loop Pipe Rupture as Structural Design Bases... Be Withheld from Public Discloser Per 10CFR2.790 | |
ML20237L303 | 7 July 1987 | Requests That Proprietary WCAP-11522, Response to NRC Question on LOCA Hydraulic Forces Analysis of Beaver Valley Power Station Unit 2, Be Withheld (Ref 10CFR2.790). Affidavit for Withholding Rept Encl | |
ML20206E452 | 24 March 1987 | Requests Withholding of Proprietary Addl Info on Beaver Valley Power Station Unit 2 SER Confirmatory Issue 032, from Public Disclosure (Ref 10CFR2.790) | |
ML20209B204 | 9 January 1987 | Requests Withholding of WCAP-11366, Westinghouse Setpoint for Protection Sys,Beaver Valley Unit 2, Per 10CFR2.790. Affidavit Encl | |
ML20198J512 | 6 May 1986 | Forwards Nonproprietary & Proprietary Addl Info on SER Confirmatory Item 32 Re Analysis of Feedwater Malfunction Event.Affidavit Also Encl.Proprietary Info Withheld (Ref 10CFR2.790) | |
ML20151Z328 | 28 January 1986 | Forwards Proprietary Affidavit AW-77-18 Re Withholding Proprietary WCAP-11061, Unit 1 & Unit 2 Differences Analyses,Accident Analyses Per 10CFR2.790.Affidavit Withheld | |
NRC-85-3041, Requests That WCAP-9735, Multiflex 3.0 - Fortran IV Computer Program for Analyzing Thermal-Hydraulic-Structural Sys Dynamics (III) Advanced Beam Model, Be Expeditiously Reviewed & Approved | 18 June 1985 | Requests That WCAP-9735, Multiflex 3.0 - Fortran IV Computer Program for Analyzing Thermal-Hydraulic-Structural Sys Dynamics (III) Advanced Beam Model, Be Expeditiously Reviewed & Approved | |
ML20100E105 | 20 March 1985 | Requests That Proprietary Seismic Response Spectrum at Reactor Vessel Supports Be Withheld (Ref 10CFR2.790) | |
ML20107G113 | 27 December 1984 | Requests Withholding of Proprietary Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for Beaver Valley Unit 1, (Ref 10CFR2.790) | |
ML20140D572 | 4 December 1984 | Requests Proprietary Rev 1 to WCAP-9736, Multiflex 3.0, FORTRAN-IV Computer Program for Analyzing Thermal-Hydraulic- Structural Sys Dynamics (III) Advanced Beam Model Be Withheld (Ref 10CFR2.790).Affidavit Encl | |
ML20101F736 | 6 November 1984 | Application for Withholding Study Re ESF Actuation Sys Setpoint Methodology (Ref 10CFR2.790) | |
ML20098C859 | 14 August 1984 | Alleges That Unqualified Suppliers Awarded Contracts from Plants to Provide Flexible Conduits Unqualified Under IEEE Stds 323 & 344 Despite IEEE Bid Requirements.Meeting Re NRC Position on safety-related Installations Requested | |
ML20093G899 | 6 June 1984 | Requests That WCAP 10565, Technical Bases for Eliminating Large Primary Loop Rupture as Structural Design Basis for Beaver Valley Unit 2, Be Withheld from Public Disclosure, Per 10CFR2.790 | |
ML20083P763 | 9 March 1984 | Requests Withholding WCAP-10493, Third Cycle Performance of Beaver Valley Unit 1 Fuel, from Public Disclosure,Per 10CFR2.790.Authorizes Use of Affidavit AW-76-35 in Support of Util Request | |
ML20082P890 | 10 November 1983 | Application for Withholding Proprietary Steam Line Break Blowdown Data (Ref 10CFR2.790).Affidavit Encl | |
ML20074A015 | 20 April 1983 | Application for Withholding Proprietary WCAP-10196, Second Cycle Performance of Beaver Valley Unit 1 Fuel, Per 10CFR2.790.Affidavit Encl | |
ML20028C736 | 31 December 1982 | Forwards Proprietary & Nonproprietary Incore Detector Thimble Reduction Study, Submitted in Support of 821216 Proposed Tech Spec Change Request 75.Proprietary Rept Withheld (Ref 10CFR2.790).Affidavit Encl | |
ML20008G142 | 11 June 1981 | Advises That Facility Should Be Deleted from 810610 Part 21 Rept Re Missile Penetration Analysis | |
ML19350C949 | 8 April 1981 | Authorizes Use of Encl Previously Furnished Affidavit for Withholding Portion of Cycle 2 Rod Misalignment Analysis (Ref 10CFR2.790) | |
ML19347D431 | 21 January 1981 | Forwards Affidavit Requesting That Analytical Results of Impact of Increased Rod Misalignment on Peaking Factors Be Withheld (Ref 10CFR2.790) | |
ML19347C740 | 23 December 1980 | Requests That Proprietary Info Submitted as Responses to NUREG-0737 Re Instrumentation for Inadequate Core Cooling Be Withheld from Public Disclosure (Ref 10CFR2.790).Affidavit Encl | Affidavit |
ML19249E894 | 19 September 1979 | Notifies of Failure of Personnel Fabricating Pipe Spools to Comply W/Asme Boiler & Pressure Vessel Code Re Welding Qualifications.Work Ceased Upon Issuance of Rept by Inspectors | |
ML19289E627 | 23 March 1979 | in Response to 780922 Part 21 Rept,Informs That Injection Pumps Were Removed & Inspected Using Newly Established Criteria of Suppl 2, & Were Reinstalled on Engines.No Further Action Contemplated | |
ML19289E624 | 22 March 1979 | Notification of Test Results Indicated in 780922 Part 21 Rept.Cites Three Causes of Injection Pump Failure.Concludes Pumps Are Now Adequate.No Further Action Contemplated | |
ML19263D602 | 22 March 1979 | Notifies NRC Insp Completed Re Exhaust Rocker Arms of Two PC-2 Generator Sets.Unit Free of Potential Defects | |
ML20083P768 | 13 August 1976 | Requests Withholding Info,Re Notification of Generic Problems Under 10CFR50.59(a) & 10CFR50.55(e) on Increased Temp in Upper Head & DNB Penalty Re Rod Bow,From Public Disclosure,Per 10CFR2.790.Affidavit Encl |