Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20303A17929 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 8
ML20303A18629 September 20208 to Updated Final Safety Analysis Report, Chapter 5 Through Chapter 7Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Coatings
Nondestructive Examination
Squib
Emergency Lighting
Incorporated by reference
Aging Management
Design basis earthquake
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Excess Flow Check Valve
Time Critical Operator Action
License Renewal
Earthquake
Hardened vent
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure boundary leak
Fire Protection Program
Unidentified leakage
Unidentified leak
Power Uprate
Measurement Uncertainty Recapture
NL-20-1084, 8 to Updated Final Safety Analysis Report, Reference Drawings, Part 229 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 2
ML20303A19729 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 4
ML20303A19629 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 6Squib
ML20303A19529 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 3
ML20303A19429 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 7
ML20303A19329 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 5
ML20303A19229 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 1
ML20303A18929 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 13
ML20303A18829 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 12
ML20303A18729 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 10
ML20303A18429 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 9FLEX
Earthquake
ML20303A18229 September 20208 to Updated Final Safety Analysis Report, Reference Drawings, Part 11
NL-19-1124, Submittal of Revision 37 to Updated Final Safety Analysis Report, Fire Hazard Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10CFR50.59 Summary Report and Revised Nrc..26 September 2019Submittal of Revision 37 to Updated Final Safety Analysis Report, Fire Hazard Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10CFR50.59 Summary Report and Revised Nrc..Open Phase Condition
License Renewal
Fuel cladding
NL-18-0906, Revision 36 to the Updated Final Safety Analysis Report, Fire Hazard Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, License Renewal Changes, & Revised NRC Commitments Report30 August 2018Revision 36 to the Updated Final Safety Analysis Report, Fire Hazard Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, License Renewal Changes, & Revised NRC Commitments ReportTemporary Modification
Qualified Offsite Circuit
Open Phase Condition
License Renewal
Fuel cladding
Offsite Circuit
ML17010A37710 January 2017FSAR Part 11 Redacted
ML17010A37410 January 2017Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 9 -RedactedSafe Shutdown
High Radiation Area
Fire Barrier
Hydrostatic
Coatings
Emergency Lighting
Exemption Request
Fire Protection Program
Fire Watch
Early Warning Fire Detection
ML17010A35710 January 2017FSAR Part 3 RedactedSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Post Accident Monitoring
Hydrostatic
Coatings
Nondestructive Examination
Squib
Water level shrink
Emergency Lighting
Incorporated by reference
Aging Management
Design basis earthquake
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Excess Flow Check Valve
Time Critical Operator Action
Overtravel
License Renewal
Earthquake
Hardened vent
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure boundary leak
Fire Protection Program
Power change
Unidentified leakage
Unidentified leak
Power Uprate
Measurement Uncertainty Recapture
ML17010A38710 January 2017FSAR Part 18 Redacted
ML17010A38810 January 2017FSAR Part 19 Redacted
ML17010A36510 January 2017FSAR Part 6 RedactedSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
FLEX
Missed surveillance
Scram Discharge Volume
Operability Determination
Control of Heavy Loads
ML17010A33610 January 2017Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 1 RedactedSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Operator Manual Action
Squib
Water level shrink
Emergency Lighting
Incorporated by reference
Tornado-Generated Missile
Aging Management
Abnormal operational transient
Design basis earthquake
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Process Control Program
Excess Flow Check Valve
Overtravel
License Renewal
Earthquake
Power-Operated Valves
Hardened vent
Turbine Missile
Fuel cladding
Liquid penetrant
Offsite Circuit
Fire Protection Program
Power change
Flow Induced Vibration
Coast down
Unidentified leakage
Power Uprate
Failure to Scram
ML17010A36910 January 2017FSAR Part 8 - RedactedSafe Shutdown
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Multiple Spurious Operation
Emergency Lighting
FLEX
B.5.b
Missed surveillance
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Excess Flow Check Valve
Operability Determination
Control of Heavy Loads
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Grace period
Power change
ML17010A38310 January 2017FSAR Part 13 Redacted
ML17010A38610 January 2017FSAR Part 17 Redacted
ML17010A36110 January 2017Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 4 - RedactedSafe Shutdown
High winds
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Operator Manual Action
Squib
Emergency Lighting
Incorporated by reference
Aging Management
Tornado Missile Protection
Design basis earthquake
Scram Discharge Volume
Process Control Program
Feedwater Controller Failure
MELLLA
Excess Flow Check Valve
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Accidental discharge
Fire Protection Program
Coast down
Unidentified leakage
Power Uprate
Overexposure
Failure to Scram
NL-16-1245, Updated Final Safety Analysis Report, Drawings. Part 22 of 2225 August 2016Updated Final Safety Analysis Report, Drawings. Part 22 of 22
ML16244A41525 August 2016Updated Final Safety Analysis Report, Technical Requirements Manual. Part 7 of 22Reactor Vessel Water Level
ML16244A48225 August 2016Updated Final Safety Analysis Report, Drawings. Part 20 of 22
ML16244A46025 August 2016Updated Final Safety Analysis Report, Drawings. Part 12 of 22
ML16244A46625 August 2016Updated Final Safety Analysis Report, Drawings. Part 14 of 22
ML16244A48025 August 2016Revision 34 to Updated Final Safety Analysis Report, Drawings. Part 21 of 22
ML16244A46925 August 2016Updated Final Safety Analysis Report, Drawings. Part 15 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 20 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 20 of 22
ML16244A46325 August 2016Updated Final Safety Analysis Report, Reference Drawings. Part 10 of 22Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Tornado Missile
Post Accident Monitoring
Hydrostatic
Coatings
VT-2
Emergency Lighting
Incorporated by reference
Aging Management
Design basis earthquake
Earthquake
Fuel cladding
Fire Protection Program
Early Warning Fire Detection
ML16244A47125 August 2016Updated Final Safety Analysis Report, Drawings. Part 16 of 22
ML16244A40825 August 2016Edwin I. Hatch, Unit 1 & 2, Updated Final Safety Analysis Report. Part 2 of 22Safe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Tornado Generated Missile
Abnormal operational transient
Tornado Missile Protection
Design basis earthquake
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Earthquake
Power-Operated Valves
Turbine Missile
Fuel cladding
Liquid penetrant
Accidental discharge
Offsite Circuit
Fire Protection Program
Scaffolding
Power change
NL-16-1245, Edwin I. Hatch, Unit 1 & 2, Updated Final Safety Analysis Report, Technical Requirements Manual. Part 7 of 2225 August 2016Edwin I. Hatch, Unit 1 & 2, Updated Final Safety Analysis Report, Technical Requirements Manual. Part 7 of 22Reactor Vessel Water Level
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Revision 34 to Updated Final Safety Analysis Report, Drawings. Part 21 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Revision 34 to Updated Final Safety Analysis Report, Drawings. Part 21 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 16 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 16 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 15 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 15 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 14 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 14 of 22
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Reference Drawings. Part 10 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Reference Drawings. Part 10 of 22Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Tornado Missile
Post Accident Monitoring
Hydrostatic
Coatings
VT-2
Emergency Lighting
Incorporated by reference
Aging Management
Design basis earthquake
Earthquake
Fuel cladding
Fire Protection Program
Early Warning Fire Detection
NL-16-1245, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 12 of 2225 August 2016Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Drawings. Part 12 of 22
NL-14-0649, Units 1 and 2 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-36011 August 2015Units 1 and 2 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360
ML11320A11524 October 2011Edwin I. Hatch, Unit 1 - 2011 Updated Final Safety Analysis Report, Revision 29, HNP-1 Active Page List Through Table R.6-3 ISP Test Matrix
ML11320A11724 October 2011Edwin I. Hatch, Unit 2 - 2011 Updated Final Safety Analysis Report, Revision 29, HNP-2 Active Page List Through Figure 5A-6, Schematic Plan
ML11320A11824 October 2011Edwin I. Hatch, Unit 2 - 2011 Updated Final Safety Analysis Report, Revision 29, Chapter 8, Electric Power Through Chapter 18, Appendix a, Conformance with Nuclear Regulatory Commission (NRC) Regulatory Guides
ML11320A11924 October 20112011 Updated Final Safety Analysis Report, Revision 29, Chapter 6, Engineered Safety Features Through Chapter 7, Instrumentation and ControlSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Coatings
Nondestructive Examination
Squib
Water level shrink
Emergency Lighting
Incorporated by reference
Aging Management
Design basis earthquake
Scram Discharge Volume
Excess Flow Check Valve
Overtravel
Earthquake
Hardened vent
Turbine Missile
Fuel cladding
Liquid penetrant
Fire Protection Program
Power change
Unidentified leakage
Power Uprate
Measurement Uncertainty Recapture