Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17054C236 | 17 January 2017 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses, Enclosure 9 - CAW-16-4499 | |
ML17054C235 | 17 January 2017 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WOG-93-066 | |
ML17054C226 | 17 January 2017 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WCAP-18083-NP, Rev 0, Westinghouse Revised Thermal Design Procedure Uncertainty Calculations. | |
ML17054C229 | 17 January 2017 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Responses to NRC RAIs on August 2013 Methodology Transition LAR Submittal | Boric Acid Safe Shutdown Earthquake Coatings Fuel cladding Recently irradiated fuel Power Uprate Affidavit |
ML17054C233 | 17 January 2017 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - CAW-92-287 | |
ML17054C230 | 17 January 2017 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - A-3788, Technical Report, Appendix a, Fission Product Removal Effectiveness of Chemical Additives in PWR Containment Sprays | |
ET 17-0001, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses, Enclosure 10 - CAW-16-4500 | 17 January 2017 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses, Enclosure 10 - CAW-16-4500 | |
ML17054C227 | 17 January 2017 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - Alternative Source Term, Rev 1 | |
ML17054C224 | 17 January 2014 | License Amendment Request for the Transition to Westinghouse Core Design and Safety Analyses - WCAP-17658-NP, Rev 1, Transition of Methods for Core Design and Safety Analyses - Licensing Report. | Boric Acid Shutdown Margin Loop seal Stroke time Anticipated operational occurrence License Renewal Earthquake Fuel cladding Power change Coast down Power Uprate Measurement Uncertainty Recapture |
ML13177A284 | 30 June 2013 | WCAP-17678-NP, Supplement 1, Revision 1, Wolf Creek Generating Station Supplemental Information for Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report, Part 1 of 3 | Safe Shutdown Unanalyzed Condition Boric Acid Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Earthquake Scaffolding |
ML13177A286 | 30 June 2013 | WCAP-17678-NP, Supplement 1, Revision 1, Wolf Creek Generating Station Supplemental Information for Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report, Part 2 of 3 | |
ML091590167 | 30 April 2009 | Enclosure II - Westinghouse Electric Company LLC, WCAP-17071-NP, H*: Alternate Repair Criteria for the Resrad Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F) | |
ET 08-0005, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls | 18 January 2008 | Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation Valves and Controls | Loop seal |
ML071550226 | 31 May 2007 | WCAP-15791-NP, Revision 2, Draft, Risk-Informed Evaluation of Extensions to Containment Isolation Valve Completion Times. | High Radiation Area Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program Fuel cladding |
ML062890420 | 30 August 2006 | WCAP-16589-NP, Rev 0, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Wolf Creek. | Boric Acid Nondestructive Examination Finite Element Analysis |
ML062770360 | 31 July 2006 | to Topical Report WCAP-16308-NP, Pressurized Water Reactor Owners Group 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Station. | Safe Shutdown High winds Probabilistic Risk Assessment Large early release frequency Severe Accident Management Guideline Maintenance Rule Program Biofouling |
ML042390214 | 20 August 2004 | Westinghouse Owners Group Request to Withdraw WCAP-16168-NP, Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval, (PA-MSC-0120) | |
ML033230225 | 12 November 2003 | Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. | Anticipated operational occurrence Probabilistic Risk Assessment Fuel cladding Coast down |
ML031060076 | 8 April 2003 | Submittal of Test Results for Withdrawal of Surveillance Capsule X from Reactor Vessel |