Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program22 March 2022Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) ProgramPost Accident Monitoring
Probabilistic Risk Assessment
Pressure and Temperature Limits Report
Affidavit
TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections8 June 2020Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube InspectionsNon-Destructive Examination
Post Accident Monitoring
Nondestructive Examination
Pressure and Temperature Limits Report
TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements13 December 2019Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve RequirementsAnticipated operational occurrence
Surveillance Frequency Control Program
TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position28 August 2019Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionUltimate heat sink
Anticipated operational occurrence
Water Inventory Control
Surveillance Frequency Control Program
ML19056A42521 February 2019NRC Staff Feedback to TSTF Proposed Revision to TSTF-541, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed.
TSTF-16-07, Technical Specifications Task Force - Revision 2 of TSTF-551, Revise Secondary Containment Surveillance Requirements.12 May 2016Technical Specifications Task Force - Revision 2 of TSTF-551, Revise Secondary Containment Surveillance Requirements.Surveillance Frequency Control Program
TSTF-14-05, Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal.4 March 2014Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal.Safe Shutdown
Time of Discovery
High Radiation Area
Non-Destructive Examination
Stroke time
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Enforcement Discretion
Functionality Assessment
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Pressure Boundary Leakage
TSTF-10-24, Submittal of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.24 November 2010Submittal of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.Grab sample
Enforcement Discretion
Pressure Boundary Leakage
TSTF-10-12, Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A)30 August 2010Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A)Safe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Nondestructive Examination
Surveillance Frequency Control Program
Severe Accident Management Guideline
Affidavit
TSTF-10-05, Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas Accumulation29 June 2010Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas AccumulationBoric Acid
Reactor Vessel Water Level
Stroke time
Time to boil
Functionality Assessment
ML10250029510 May 2010WCAP-16364-NP, Revision 2, Implementation Guidance for Risk Informed Modification to Selected Required Action End States at Combustion Engineering NSSS Plants (TSTF-422)Safe Shutdown
Ultimate heat sink
ML0933403645 April 2010Models for Adoption of TSTF-514, Revision 1, Revise BWR Operability Requirements and Actions for RCS Leakage InstrumentationGrab sample
Pressure Boundary Leakage
TSTF-09-08, Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.26 March 2009Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.Non-Destructive Examination
Post Accident Monitoring
Nondestructive Examination
TSTF-08-05, TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners.4 March 2008TSTF-506, Revision 0, Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners.Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Severe Accident Management Guideline
Earthquake
Fuel cladding
TSTF-07-26, TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.31 August 2007TSTF-500, Revision 0, DC Electrical Rewrite - Update to TSTF-360.Safe Shutdown
Anticipated operational occurrence
Probabilistic Risk Assessment
Battery sizing
Recently irradiated fuel
TSTF-07-14, TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.16 April 2007TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions.Safe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Incorporated by reference
Scram Discharge Volume
Fuel cladding
Backfit
Coast down
ML07081052331 August 1996NEI 96-06, Improved Technical Specifications Conversion Guidance.Incorporated by reference
Backfit