Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23324A42220 November 2023Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13Non-Destructive Examination
Aging Management
License Renewal
Subsequent License Renewal
EVT-1
Power Uprate
Stretch Power Uprate
ML23103A22812 April 2023Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer CodeShutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
B.5.b
Exemption Request
Fuel cladding
Fire Protection Program
ML22193A14323 June 20225 to Updated Final Safety Analysis Report, Technical Requirements Manual Current Through Change No. 207Safe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Fire Barrier
Stroke time
Hydrostatic
Emergency Lighting
Functionality Assessment
Large early release frequency
Operability Determination
Severe Accident Management Guideline
Earthquake
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Early Warning Fire Detection
Downpower
Coast down
Power Uprate
Measurement Uncertainty Recapture
ML21175A24724 June 20212020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....-
ML21042B32111 February 2021Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code
ML20352A33417 December 2020Proposed Alternative Requests RR-05-04 and IR-4-02, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply PipingVT-2
Biofouling
Through-Wall Leakage
Scaffolding
ML20203M16020 July 2020VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & StatusAnchor Darling
ML19352B89817 December 2019Proposed Alternative Request RR-05-05, Containment Unbonded Post-Tensioning System Inservice Inspection RequirementsIncorporated by reference
Fuel cladding
ML19246A1167 October 2019Supplement to Staff Assessment of Response to 10 CFR 50.54(F) Information Request - Flood Causing Mechanism Reevaluation(Epid Nos. 000495\05000336\L- 2015-JLD-0011 and 000495\05000423\L-2015-JLD-0012 - (2019Aug21)Internal Flooding
Hydrostatic
Fukushima Dai-Ichi
ML19249B76829 August 2019Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated)Safe Shutdown
Boric Acid
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Reserve Station Service Transformer
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19249B77229 August 2019Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated)Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Reserve Station Service Transformer
Operating Basis Earthquake
Operator Manual Action
FLEX
Design basis earthquake
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19249B77429 August 2019Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated)Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Reserve Station Service Transformer
Operating Basis Earthquake
Operator Manual Action
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19249B77829 August 2019Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1
ML19070A2173 April 2019Supplement to Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood - Causing Mechanism ReevaluationFukushima Dai-Ichi
ML19064A59028 February 2019Proposed Alternative Request IR-3-39, Alternative to ASME Code, Section XI, IWA-4221(C), to Permit Two Fillet Welds Not in Compliance with the Construction Code to Remain in ServiceSafe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Pressure boundary leak
ML19011A1744 January 2019Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting DocumentsSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19011A1734 January 2019Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting DocumentsSafe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML19011A1724 January 2019Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up)Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Time to boil
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML18247A27518 June 2018Technical Requirements ManualSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
High Radiation Area
Fire Barrier
Stroke time
Hydrostatic
Emergency Lighting
Functionality Assessment
Incorporated by reference
Large early release frequency
Operability Determination
Severe Accident Management Guideline
Earthquake
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Downpower
Coast down
ML15253A2061 September 2015ANP-3315NP, Revision 0, Millstone Unit 2 M5 Upgrade, Small Break LOCA Analysis Licensing Report.Loop seal
Hydrostatic
ML15078A20512 March 2015to Engineering Evaluation 14-E16, Dominion Flooding Hazard Reevaluation Report for Millstone, Units 2 and 3, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Pp. 1 Through 2-57High winds
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
ML15078A20612 March 2015to Engineering Evaluation 14-E16, Dominion Flooding Hazard Reevaluation Report for Millstone, Units 2 and 3, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Pp. 2-58 Through 2-125
ML15078A20712 March 2015to Engineering Evaluation 14-E16, Dominion Flooding Hazard Reevaluation Report for Millstone, Units 2 and 3, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Pp. 2-126 Through 2-171Earthquake
ML15078A20812 March 2015to Engineering Evaluation 14-E16, Dominion Flooding Hazard Reevaluation Report for Millstone, Units 2 and 3, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Pp. 2-172 Through the EndUltimate heat sink
Hydrostatic
FLEX
Earthquake
ML13338A43331 January 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Time Critical Operator Action
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML13357A39824 January 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Milestone Power Station, Unit 2, TAC No.: MF0858Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML14006A1598 January 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Millstone Power Station, Unit 3, TAC No.: MF0859Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Time Critical Operator Action
Frazil ice
Battery sizing
Earthquake
ML14087A09917 October 201310 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure
ML13074A79628 February 2013Small Break LOCA Sensitivity Study Summary Report, ANP-3205NP, Rev 0Loop seal
ML12172A06021 June 2012Closeout of Bulletin 2011-01, Mitigating StrategiesB.5.b
B.5.b Mitigating Strategies
ML10239041931 August 2010DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code.B.5.b Mitigating Strategies
Exemption Request
Fuel cladding
ML10146006225 May 2010Second Report Regarding Lead Test Assembly
ML09209021630 June 2009WCAP-16896-NP, Rev 2, Millstone Unit 2 RCS Surge, Spray, Shutdown Cooling, Safety Injection, Charging Inlet, and Letdown/Drain Nozzles Structural Weld Overlay Qualification.Boric Acid
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Earthquake
Dissimilar Metal Weld
DM weld
ML09117015031 March 2009Enclosure 1- Part 1 of 2 - Report FAI/09-22, Test Results for the Millstone-3 Gas-Water Transport Tests
ML09117013713 March 2009Enclosure 1 - Part 2 of 2 - Calculation FAI/09-44R, Revision 0, Post-Test Analysis of the Fai Millstone 3 RWST 1/4 Scale Gas Entrainment Test
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
ML08114008317 April 2008WCAP-16896-NP, Rev. 1, Millstone, Unit 2, RCS Surge, Spray, Shutdown Cooling, Safety Injection, Charging Inlet, and Letdown/Drain Nozzles Structural Weld Overlay Qualification.Boric Acid
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
Earthquake
Dissimilar Metal Weld
DM weld
ML0809802294 April 2008Stations - Request for Approval of Appendix C of Fleet Report DOM-NAF-2 Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code
ML08149008831 January 2008Enclosure 4 - LTR-CDME-08-11 NP-Attachment, Interim Alternative Repair Criterion for Cracks in the Lower Region of the Tubesheet Expansion ZoneFinite Element Analysis
ML07275040630 June 2007Internal Report, IR-2007-277, EPRI Review of Millstone Unit 2 Dissimilar Metal Weld Walkdown Information.Weld Overlay
Dissimilar Metal Weld
ML07317067819 May 2007SCS-00684, Rev. Draft-2, Design Report, ASME Bp&V Section III, Class 3, SS-45S8-18622-NSR Ball Valve, SS-45XS8-18623-NSR Ball Valve, Enclosure 2Finite Element Analysis
ML07096035631 March 2007WCAP-16734-NP, Revision 0, Millstone, Unit 3 Pressurizer, Relief, and Surge Nozzles Structural Weld Overlay Qualification.Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Code Reconciliation
Earthquake
Dissimilar Metal Weld
DM weld
ML07066012931 January 2007LTR-PAFM-07-12, Technical Basis for Relaxation Request from NRC Order EA-03-009 for Millstone Unit 3.Finite Element Analysis
ML0628502212 October 2006Submittal of Third Reactor Vessel Surveillance Capsule Report, WCAP-16629-NP, Rev 0
ML05189004429 June 200510 CFR 50.59 and Commitment Change Report for 2004Operability Determination
Fuel cladding
ML05026067525 January 2005Updated Response to a Request for Additional Information Reconciliation of Regulatory RequirementsSpent Fuel Pool Instrumentation
Exemption Request
ML0501100796 January 2005Response to Request for Additional Information Re Reconciliation of Regulatory RequirementsExemption Request
ML0501100806 January 2005Response to Request for Additional Information Re Reconciliation of Regulatory Requirements. Attachment 1 - Millstone Unit 2 Spent Fuel Pool Boron Dilution Analysis Summary for a Nuhoms 32PT DSCSpent Fuel Pool Instrumentation
ML05145052222 December 2004Technical Evaluation for Evaluation of Pressure Entering the Enclosure Building Filtration Region on Main Steam Safety Valve Lift Millstone Unit 2
ML0504801116 December 2004Connecticut River Coordinator'S Office - Restoring Migratory Fish to the Connecticut River Basin